Panchayat Raj Engineering Department Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Panchayat Raj Engineering Department Tender
Civil And Construction
Civil Works Others
Opening Date29 Jul 2024
Closing Date12 Aug 2024
Tender Amount₹ 32,39,975
Costs
EMD
₹ 32,400Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
746183Bid Award Id
ViewTender No
No.26/2024-25, Dt.03-07-2024Tender Authority
Panchayat Raj Engineering Department ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Supply and delivery of Copper Sulphate Powder High Grade including transportation charges. The rate is excluding of GST @ 18%.
100
39000
390
... More
Cost and supply of 315 mm dia PVC Pipes 6 Kg/cm2 excluding all taxes and conveyance charges etc complete.
24
55701
2320.89
... More
Cost and supply of 250 mm dia PVC Pipes 6 Kg/cm2 excluding all taxes and conveyance charges etc complete.
24
34856
1452.37
... More
Cost and supply of 200 mm dia PVC Pipes 6 Kg/cm2 excluding all taxes and conveyance charges etc complete.
30
26718
890.62
... More
Cost and supply of 180 mm dia PVC Pipes 6 Kg/cm2 excluding all taxes and conveyance charges etc complete.
24
17539
730.82
... More
Cost and supply of 160 mm dia PVC Pipes 6 Kg/cm2 excluding all taxes and conveyance charges etc complete.
24
13616
567.35
... More
Cost and supply of 125 mm dia PVC Pipes 6 Kg/cm2 excluding all taxes and conveyance charges etc complete.
30
10278
342.63
... More
Cost and supply of 110 mm dia PVC Pipes 6 Kg/cm2 excluding all taxes and conveyance charges etc complete.
30
8017
267.24
... More
Repair to 315 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)
6
51730
8621.7
... More
Repair to 250 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)
8
46204
5775.5
... More
Repair to 200 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)
10
41417
4141.7
... More
Repair to 180 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)
8
29643
3705.4
... More
Repair to 160 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)
8
28907
3613.4
... More
Repair to 125 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)
6
13024
2170.7
... More
Repair to 110 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)
6
12826
2137.7
... More
Labour charges for cleaning of sumps / GLBR including cleaning, removal of algae, clacinations, sludge, dirt deposition from side walls and bottom portion of the container by desinfection with bleaching powder with all necessary tools, plants, including labour charges and cost of materials etc. complete.
1200
9840
82
... More
(Rupees Thirty Two Lakhs Thirty Nine Thousand Nine Hundred Seventy Five and Paise Zero Six only)
-
3239975
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements