Panchayat Raj Engineering Department Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Panchayat Raj Engineering Department Tender
Civil And Construction
Water Storage And Supply
Opening Date17 Oct 2024
Closing Date1 Nov 2024
Tender Amount₹ 47,48,701
Costs
EMD
₹ 47,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
758997Tender No
26/ATO/2024-25 dt 10.10.2024Tender Authority
Panchayat Raj Engineering Department ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Cost ,supply and utilisation of HDPE pipe of 140mm dia HDPE pipe 6kg/cms including all charges etc complete
30
532
15985.5
... More
Cost ,supply and utilisation of HDPE pipe of 160 mm dia HDPE pipe 6kg/cms including all charges etc complete
54
698
37733.04
... More
Cost ,supply and utilisation of HDPE pipe of 280 mm dia HDPE pipe 6kg/cms including all charges etc complete
63
2119
133534.17
... More
Cost ,supply and utilisation of PVC pipe of 90 mm dia PVC pipe 6kg/cms including all charges etc complete
12
166
1999.56
... More
Cost ,supply and utilisation of PVC pipe of 110 mm dia PVC pipe 6kg/cms including all charges etc complete
18
241
4354.2
... More
Cost ,supply and utilisation of PVC pipe of 140 mm dia PVC pipe 6kg/cms including all charges etc complete
36
397
14309.28
... More
Cost ,supply and utilisation of PVC pipe of 160 mm dia PVC pipe 6kg/cms including all charges etc complete
63
513
32376.33
... More
Cost ,supply and utilisation of PVC pipe of 180 mm dia PVC pipe 6kg/cms including all charges etc complete
84
662
55644.96
... More
Cost ,supply and utilisation of PVC pipe of 200 mm dia PVC pipe 6kg/cms including all charges etc complete
42
806
33852.84
... More
Cost ,supply and utilisation of AC pressure pipe of 80 mm dia AC pipe (Mazza process) including all charges etc complete
24
237
5688
... More
Cost ,supply and utilisation of AC pressure pipe of 250 mm dia AC pipe (Mazza process) including all charges etc complete
24
1211
29064
... More
Labour Charges for leakage in 140 HDPE Pipe line of following diameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud, cleaning of pipe nd leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour, D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts etc complete(but excluding cost of Pipe) As per Annexure - I&II
12
3011
36142.8
... More
Labour Charges for leakage in 160 HDPE Pipe line of following diameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud, cleaning of pipe nd leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour, D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts etc complete(but excluding cost of Pipe) As per Annexure - I&II
18
4588
82589.4
... More
Labour Charges for leakage in 280 HDPE Pipe line of following diameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud, cleaning of pipe nd leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour, D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts etc complete(but excluding cost of Pipe) As per Annexure - I&II
18
9422
169596.72
... More
Labour Charges for leakage in 90 mm PVC Pipe line of following diameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud, cleaning of pipe nd leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour, D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts etc complete(but excluding cost of Pipe) As per Annexure - I&II
6
1502
9013.8
... More
Labour Charges for leakage in 110 mm PVC Pipe line of following diameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud, cleaning of pipe nd leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour, D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts etc complete(but excluding cost of Pipe) As per Annexure - I&II
6
2160
12961.2
... More
Labour Charges for leakage in 140 mm PVC Pipe line of following diameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud, cleaning of pipe nd leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour, D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts etc complete(but excluding cost of Pipe) As per Annexure - I&II
12
2415
28988.4
... More
Labour Charges for leakage in 160 mm PVC Pipe line of following diameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud, cleaning of pipe nd leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour, D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts etc complete(but excluding cost of Pipe) As per Annexure - I&II
18
3700
66616.2
... More
Labour Charges for leakage in 180 mm PVC Pipe line of following diameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud, cleaning of pipe nd leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour, D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts etc complete(but excluding cost of Pipe) As per Annexure - I&II
24
3840
92181.6
... More
Labour Charges for leakage in 200 mm PVC Pipe line of following diameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud, cleaning of pipe nd leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour, D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts etc complete(but excluding cost of Pipe) As per Annexure - I&II
12
4880
58561.2
... More
Labour Charges for leakage in 80 mm AC Pipe line of following diameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud, cleaning of pipe nd leakage portion, cutting the pipe line& removing piece of pipe of pipe from trench with inclusive of mechanical deviced JCB, Hydralic Crane if necessary & lobours required with providing material such Turened CID joints with nut bolt, ribber rings etc., comp (Inc all material, but excluding cost of Pipe) As per Annexure -III
12
2399
28792.8
... More
Labour Charges for leakage in 250 mm AC Pipe line of following diameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud, cleaning of pipe nd leakage portion, cutting the pipe line& removing piece of pipe of pipe from trench with inclusive of mechanical deviced JCB, Hydralic Crane if necessary & lobours required with providing material such Turened CID joints with nut bolt, ribber rings etc., comp (Inc all material, but excluding cost of Pipe) As per Annexure -III
12
4922
59068.8
... More
Rewinding of 5.00 HP three phase motor of 1400 to 2800 RPM including all necessary material and of the same characteristics as original with required size of super enameled wire 'E' class insulation material and testing etc. as required. ( As per Building SOR - ELEC- 5.9.14 )
2
3600
7200
... More
Rewinding of 10.00 HP three phase motor of 1400 to 2800 RPM including all necessary material and of the same characteristics as original with required size of super enameled wire 'E' class insulation material and testing etc. as required. ( As per Building SOR - ELEC- 5.9.14 )
1
5250
5250
... More
Rewinding of 15.00 HP three phase motor of 1400 to 2800 RPM including all necessary material and of the same characteristics as original with required size of super enameled wire 'E' class insulation material and testing etc. as required. ( As per Building SOR - ELEC- 5.9.14 )
1
6750
6750
... More
Labour charges for cleaning of 40 KLsumps/ including cleaning and removal of algae,calcinations,sludge, dirt deposition from side walls and bottom portion of the container by disinfection with bleaching powder with all necessary tools, plants labour charges and cost of disinfectant etc. As per Approved Data (Annexure - VIII) ( In Aprial month and July monts ) - 2 times
5
960
4800
... More
Labour charges for cleaning of 50 KLsumps/ including cleaning and removal of algae,calcinations,sludge, dirt deposition from side walls and bottom portion of the container by disinfection with bleaching powder with all necessary tools, plants labour charges and cost of disinfectant etc. As per Approved Data (Annexure - VIII) ( In Aprial month and July monts ) - 2 times
1
1222
1222
... More
Labour charges for cleaning of 60 KLsumps/ including cleaning and removal of algae,calcinations,sludge, dirt deposition from side walls and bottom portion of the container by disinfection with bleaching powder with all necessary tools, plants labour charges and cost of disinfectant etc. As per Approved Data (Annexure - VIII) ( In Aprial month and July monts ) - 2 times
6
1380
8280
... More
Labour charges for cleaning of 150 KLsumps/ including cleaning and removal of algae,calcinations,sludge, dirt deposition from side walls and bottom portion of the container by disinfection with bleaching powder with all necessary tools, plants labour charges and cost of disinfectant etc. As per Approved Data (Annexure - VIII) ( In Aprial month and July monts ) - 2 times
1
2492
2492
... More
Labour charges for cleaning of 160 KLsumps/ including cleaning and removal of algae,calcinations,sludge, dirt deposition from side walls and bottom portion of the container by disinfection with bleaching powder with all necessary tools, plants labour charges and cost of disinfectant etc. As per Approved Data (Annexure - VIII) ( In Aprial month and July monts ) - 2 times
2
2492
4984
... More
Labour charges for cleaning of 200 KLsumps/ including cleaning and removal of algae,calcinations,sludge, dirt deposition from side walls and bottom portion of the container by disinfection with bleaching powder with all necessary tools, plants labour charges and cost of disinfectant etc. As per Approved Data (Annexure - VIII) ( In Aprial month and July monts ) - 2 times
1
3036
3036
... More
Labour charges for cleaning of 260 KLsumps/ including cleaning and removal of algae,calcinations,sludge, dirt deposition from side walls and bottom portion of the container by disinfection with bleaching powder with all necessary tools, plants labour charges and cost of disinfectant etc. As per Approved Data (Annexure - VIII) ( In Aprial month and July monts ) - 2 times
1
3536
3536
... More
Rupees Forty seven lakhs forty eight thousand seven hundred zero one and paise forty six only
4748701.46
-
-
... More
The quantities specified in the above items of work are approximate.
-
-
-
... More
Note: Based on the actual execution BOQ will be arrived accordingly paymnet will be made to the present and previous contractors.
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements