Panchayat Raj Engineering Department Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Panchayat Raj Engineering Department Tender

Works
Civil And Construction
Water Storage And Supply
Opening Date17 Oct 2024
Closing Date1 Nov 2024
Tender Amount₹ 47,48,701 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cost ,supply and utilisation of HDPE pipe of 140mm dia HDPE pipe 6kg/cms including all charges etc complete

30

532

15985.5

... More
Cost ,supply and utilisation of HDPE pipe of 160 mm dia HDPE pipe 6kg/cms including all charges etc complete

54

698

37733.04

... More
Cost ,supply and utilisation of HDPE pipe of 280 mm dia HDPE pipe 6kg/cms including all charges etc complete

63

2119

133534.17

... More
Cost ,supply and utilisation of PVC pipe of 90 mm dia PVC pipe 6kg/cms including all charges etc complete

12

166

1999.56

... More
Cost ,supply and utilisation of PVC pipe of 110 mm dia PVC pipe 6kg/cms including all charges etc complete

18

241

4354.2

... More
Cost ,supply and utilisation of PVC pipe of 140 mm dia PVC pipe 6kg/cms including all charges etc complete

36

397

14309.28

... More
Cost ,supply and utilisation of PVC pipe of 160 mm dia PVC pipe 6kg/cms including all charges etc complete

63

513

32376.33

... More
Cost ,supply and utilisation of PVC pipe of 180 mm dia PVC pipe 6kg/cms including all charges etc complete

84

662

55644.96

... More
Cost ,supply and utilisation of PVC pipe of 200 mm dia PVC pipe 6kg/cms including all charges etc complete

42

806

33852.84

... More
Cost ,supply and utilisation of AC pressure pipe of 80 mm dia AC pipe (Mazza process) including all charges etc complete

24

237

5688

... More
Cost ,supply and utilisation of AC pressure pipe of 250 mm dia AC pipe (Mazza process) including all charges etc complete

24

1211

29064

... More
Labour Charges for leakage in 140 HDPE Pipe line of following diameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud, cleaning of pipe nd leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour, D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts etc complete(but excluding cost of Pipe) As per Annexure - I&II

12

3011

36142.8

... More
Labour Charges for leakage in 160 HDPE Pipe line of following diameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud, cleaning of pipe nd leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour, D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts etc complete(but excluding cost of Pipe) As per Annexure - I&II

18

4588

82589.4

... More
Labour Charges for leakage in 280 HDPE Pipe line of following diameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud, cleaning of pipe nd leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour, D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts etc complete(but excluding cost of Pipe) As per Annexure - I&II

18

9422

169596.72

... More
Labour Charges for leakage in 90 mm PVC Pipe line of following diameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud, cleaning of pipe nd leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour, D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts etc complete(but excluding cost of Pipe) As per Annexure - I&II

6

1502

9013.8

... More
Labour Charges for leakage in 110 mm PVC Pipe line of following diameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud, cleaning of pipe nd leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour, D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts etc complete(but excluding cost of Pipe) As per Annexure - I&II

6

2160

12961.2

... More
Labour Charges for leakage in 140 mm PVC Pipe line of following diameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud, cleaning of pipe nd leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour, D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts etc complete(but excluding cost of Pipe) As per Annexure - I&II

12

2415

28988.4

... More
Labour Charges for leakage in 160 mm PVC Pipe line of following diameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud, cleaning of pipe nd leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour, D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts etc complete(but excluding cost of Pipe) As per Annexure - I&II

18

3700

66616.2

... More
Labour Charges for leakage in 180 mm PVC Pipe line of following diameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud, cleaning of pipe nd leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour, D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts etc complete(but excluding cost of Pipe) As per Annexure - I&II

24

3840

92181.6

... More
Labour Charges for leakage in 200 mm PVC Pipe line of following diameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud, cleaning of pipe nd leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour, D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts etc complete(but excluding cost of Pipe) As per Annexure - I&II

12

4880

58561.2

... More
Labour Charges for leakage in 80 mm AC Pipe line of following diameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud, cleaning of pipe nd leakage portion, cutting the pipe line& removing piece of pipe of pipe from trench with inclusive of mechanical deviced JCB, Hydralic Crane if necessary & lobours required with providing material such Turened CID joints with nut bolt, ribber rings etc., comp (Inc all material, but excluding cost of Pipe) As per Annexure -III

12

2399

28792.8

... More
Labour Charges for leakage in 250 mm AC Pipe line of following diameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud, cleaning of pipe nd leakage portion, cutting the pipe line& removing piece of pipe of pipe from trench with inclusive of mechanical deviced JCB, Hydralic Crane if necessary & lobours required with providing material such Turened CID joints with nut bolt, ribber rings etc., comp (Inc all material, but excluding cost of Pipe) As per Annexure -III

12

4922

59068.8

... More
Rewinding of 5.00 HP three phase motor of 1400 to 2800 RPM including all necessary material and of the same characteristics as original with required size of super enameled wire 'E' class insulation material and testing etc. as required. ( As per Building SOR - ELEC- 5.9.14 )

2

3600

7200

... More
Rewinding of 10.00 HP three phase motor of 1400 to 2800 RPM including all necessary material and of the same characteristics as original with required size of super enameled wire 'E' class insulation material and testing etc. as required. ( As per Building SOR - ELEC- 5.9.14 )

1

5250

5250

... More
Rewinding of 15.00 HP three phase motor of 1400 to 2800 RPM including all necessary material and of the same characteristics as original with required size of super enameled wire 'E' class insulation material and testing etc. as required. ( As per Building SOR - ELEC- 5.9.14 )

1

6750

6750

... More
Labour charges for cleaning of 40 KLsumps/ including cleaning and removal of algae,calcinations,sludge, dirt deposition from side walls and bottom portion of the container by disinfection with bleaching powder with all necessary tools, plants labour charges and cost of disinfectant etc. As per Approved Data (Annexure - VIII) ( In Aprial month and July monts ) - 2 times

5

960

4800

... More
Labour charges for cleaning of 50 KLsumps/ including cleaning and removal of algae,calcinations,sludge, dirt deposition from side walls and bottom portion of the container by disinfection with bleaching powder with all necessary tools, plants labour charges and cost of disinfectant etc. As per Approved Data (Annexure - VIII) ( In Aprial month and July monts ) - 2 times

1

1222

1222

... More
Labour charges for cleaning of 60 KLsumps/ including cleaning and removal of algae,calcinations,sludge, dirt deposition from side walls and bottom portion of the container by disinfection with bleaching powder with all necessary tools, plants labour charges and cost of disinfectant etc. As per Approved Data (Annexure - VIII) ( In Aprial month and July monts ) - 2 times

6

1380

8280

... More
Labour charges for cleaning of 150 KLsumps/ including cleaning and removal of algae,calcinations,sludge, dirt deposition from side walls and bottom portion of the container by disinfection with bleaching powder with all necessary tools, plants labour charges and cost of disinfectant etc. As per Approved Data (Annexure - VIII) ( In Aprial month and July monts ) - 2 times

1

2492

2492

... More
Labour charges for cleaning of 160 KLsumps/ including cleaning and removal of algae,calcinations,sludge, dirt deposition from side walls and bottom portion of the container by disinfection with bleaching powder with all necessary tools, plants labour charges and cost of disinfectant etc. As per Approved Data (Annexure - VIII) ( In Aprial month and July monts ) - 2 times

2

2492

4984

... More
Labour charges for cleaning of 200 KLsumps/ including cleaning and removal of algae,calcinations,sludge, dirt deposition from side walls and bottom portion of the container by disinfection with bleaching powder with all necessary tools, plants labour charges and cost of disinfectant etc. As per Approved Data (Annexure - VIII) ( In Aprial month and July monts ) - 2 times

1

3036

3036

... More
Labour charges for cleaning of 260 KLsumps/ including cleaning and removal of algae,calcinations,sludge, dirt deposition from side walls and bottom portion of the container by disinfection with bleaching powder with all necessary tools, plants labour charges and cost of disinfectant etc. As per Approved Data (Annexure - VIII) ( In Aprial month and July monts ) - 2 times

1

3536

3536

... More
Rupees Forty seven lakhs forty eight thousand seven hundred zero one and paise forty six only

4748701.46

-

-

... More
The quantities specified in the above items of work are approximate.

-

-

-

... More
Note: Based on the actual execution BOQ will be arrived accordingly paymnet will be made to the present and previous contractors.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.