Panchayat Raj Engineering Department Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Panchayat Raj Engineering Department Tender
Civil And Construction
Civil Works Others
Opening Date8 Apr 2022
Closing Date25 Apr 2022
Tender Amount₹ 33,93,118
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
494841Bid Award Id
ViewTender No
NIT No.413/AE/PADA Grant/Building work/2021-22, Dt.29.03.2022 of the EE, PRI Division, Pulivendula (1st Call).Tender Authority
Panchayat Raj Engineering Department ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Construction of compound wall and flooring to Sai Baba and Venkateswara Swamy Temple in Boggudupalli;R.R. Masonry in CM ( 1: 6 ) using rough stone approved quarry including cost, seigniorage, conveyance of all material like cement, sand, granite stone water etc to work site from approved source and all labour charges, curing, centering etc. complete
30.31
-
147611
... More
Construction of compound wall and flooring to Sai Baba and Venkateswara Swamy Temple in Boggudupalli;VRCC M 20 grade design mix using 20mm size graded (SS-5) HBG machine crushed metal as per SS 108 with necessary reinforcement including cost, seignorage and conveyance of all materials and water from approved sources to work site and all operational, incidental, labour charges such as centring, formwork, mixing conrete, lift charges, laying, vibrating, curing etc., complete for finished item of work as per SS 403 but excluding cost of reinforcement steel and its fabrication charges for coloumns a) Plinth beam
6.76
-
76888
... More
Construction of compound wall and flooring to Sai Baba and Venkateswara Swamy Temple in Boggudupalli;VRCC M 20 grade design mix using 20mm size graded (SS-5) HBG machine crushed metal as per SS 108 with necessary reinforcement including cost, seignorage and conveyance of all materials and water from approved sources to work site and all operational, incidental, labour charges such as centring, formwork, mixing conrete, lift charges, laying, vibrating, curing etc., complete for finished item of work as per SS 403 but excluding cost of reinforcement steel and its fabrication charges for coloumns a) for Columns footing
1.81
-
15878
... More
Construction of compound wall and flooring to Sai Baba and Venkateswara Swamy Temple in Boggudupalli;VRCC M 20 grade design mix using 20mm size graded (SS-5) HBG machine crushed metal as per SS 108 with necessary reinforcement including cost, seignorage and conveyance of all materials and water from approved sources to work site and all operational, incidental, labour charges such as centring, formwork, mixing conrete, lift charges, laying, vibrating, curing etc., complete for finished item of work as per SS 403 but excluding cost of reinforcement steel and its fabrication charges for coloumns a) for Columns
1.83
-
21812
... More
Construction of compound wall and flooring to Sai Baba and Venkateswara Swamy Temple in Boggudupalli;VRCC M 20 grade design mix using 20mm size graded (SS-5) HBG machine crushed metal as per SS 108 with necessary reinforcement including cost, seignorage and conveyance of all materials and water from approved sources to work site and all operational, incidental, labour charges such as centring, formwork, mixing conrete, lift charges, laying, vibrating, curing etc., complete for finished item of work as per SS 403 but excluding cost of reinforcement steel and its fabrication charges for coloumns a) for Beams
0.57
-
6385
... More
Construction of compound wall and flooring to Sai Baba and Venkateswara Swamy Temple in Boggudupalli;VRCC M 20 grade design mix using 20mm size graded (SS-5) HBG machine crushed metal as per SS 108 with necessary reinforcement including cost, seignorage and conveyance of all materials and water from approved sources to work site and all operational, incidental, labour charges such as centring, formwork, mixing conrete, lift charges, laying, vibrating, curing etc., complete for finished item of work as per SS 403 but excluding cost of reinforcement steel and its fabrication charges for coloumns a) for roof slab 150mm thick
3.49
-
5248
... More
Construction of compound wall and flooring to Sai Baba and Venkateswara Swamy Temple in Boggudupalli;VRCC M 20 grade design mix using 20mm size graded (SS-5) HBG machine crushed metal as per SS 108 with necessary reinforcement including cost, seignorage and conveyance of all materials and water from approved sources to work site and all operational, incidental, labour charges such as centring, formwork, mixing conrete, lift charges, laying, vibrating, curing etc., complete for finished item of work as per SS 403 but excluding cost of reinforcement steel and its fabrication charges for coloumns a) for Kodangi
8.6
-
11436
... More
Construction of compound wall and flooring to Sai Baba and Venkateswara Swamy Temple in Boggudupalli;Providing High Yield Strength Deformed Bars of Fe 415 Grade of different diametres including cost & conveyance of steel including cost of binding wire and labour charges for fabrication such as cutting, bending and cranking rods, tying grills with binding wire etc complete.
1.01
-
77597
... More
Construction of compound wall and flooring to Sai Baba and Venkateswara Swamy Temple in Boggudupalli;Ornamental Brick Masonry in C.M(1:5) mix using II nd class bricks well burnt from any kiln, inclusive of brick bots, and madras terrace bricks, including cost & conveyance of all materials, labour charges, scaffolding charges, and curing etc., complete complying of standard specifications and as directed during execution of work for one Cu.m.
57.42
-
556582
... More
Construction of compound wall and flooring to Sai Baba and Venkateswara Swamy Temple in Boggudupalli;Ornamental Plastering in CM 1" to 1 1/4" thick base plastering in CM (1:3) 20mm thick and top plastering in CM(1:2) mix 12mm thick including cost and conveyance of all materials and labour charges etc complete a) for Upapeetam alround temple
122.56
-
136521
... More
Construction of compound wall and flooring to Sai Baba and Venkateswara Swamy Temple in Boggudupalli;Ornamental Plastering in CM 1" to 1 1/4" thick base plastering in CM (1:3) 20mm thick and top plastering in CM(1:2) mix 12mm thick including cost and conveyance of all materials and labour charges etc complete a) for Vyala & Salaharam
183.85
-
204793
... More
Construction of compound wall and flooring to Sai Baba and Venkateswara Swamy Temple in Boggudupalli;Supply and fixing of Granite stone Deepasthambam including cost of stone, Rough dressing, Palamana Dressing, cost of jointing including coat and conveyance of chisels, hammers all materials labour charges etc complete. a) Cost and conveyance of stone at site
169.31
-
48084
... More
Construction of compound wall and flooring to Sai Baba and Venkateswara Swamy Temple in Boggudupalli;Supply and fixing of Granite stone Deepasthambam including cost of stone, Rough dressing, Palamana Dressing, cost of jointing including coat and conveyance of chisels, hammers all materials labour charges etc complete. b) Rough dressing
231.5
-
21831
... More
Construction of compound wall and flooring to Sai Baba and Venkateswara Swamy Temple in Boggudupalli;Supply and fixing of Granite stone Deepasthambam including cost of stone, Rough dressing, Palamana Dressing, cost of jointing including coat and conveyance of chisels, hammers all materials labour charges etc complete. c) Palanama Dressing
202.5
-
117796
... More
Construction of compound wall and flooring to Sai Baba and Venkateswara Swamy Temple in Boggudupalli;Supply and fixing of Granite stone Deepasthambam including cost of stone, Rough dressing, Palamana Dressing, cost of jointing including coat and conveyance of chisels, hammers all materials labour charges etc complete. d) Cost of tools
202.5
-
24157
... More
Construction of compound wall and flooring to Sai Baba and Venkateswara Swamy Temple in Boggudupalli;Supply and fixing of Granite stone Deepasthambam including cost of stone, Rough dressing, Palamana Dressing, cost of jointing including coat and conveyance of chisels, hammers all materials labour charges etc complete. e) Fixing in position
202.5
-
23007
... More
Construction of compound wall and flooring to Sai Baba and Venkateswara Swamy Temple in Boggudupalli;Supply of hard granite cut stone slabs for flooring form perur quarry including cost and conveyance etc., complete with following specifications. a)Cost of hard granite stone
932.29
-
211844
... More
Construction of compound wall and flooring to Sai Baba and Venkateswara Swamy Temple in Boggudupalli;Supply of hard granite cut stone slabs for flooring form perur quarry including cost and conveyance etc., complete with following specifications. b)Three line dressing for hard granite stone not less than 12" x 24" uniform size and thickness not less than 4"
2545.73
-
1414357
... More
Construction of compound wall and flooring to Sai Baba and Venkateswara Swamy Temple in Boggudupalli;Supply of hard granite cut stone slabs for flooring form perur quarry including cost and conveyance etc., complete with following specifications. c)Labour charges for jointing for hard granite and soft veriety
2545.73
-
92563
... More
Construction of compound wall and flooring to Sai Baba and Venkateswara Swamy Temple in Boggudupalli;Painting to new walls with 2 coats of acrylic emulsion paint weather proof water-based, modified acrylic with silicon additives exterior grade having VOC (Volatile Organic Compound ) content less than 50 grams/ liter. of approved brand and colour over a base coat of appropriate primer of approved brand,of first grade making 3 coats in all to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost and conveyance of all materials to work site and operational, labour charges and incidental charges such as scaffolding, lift charges etc., complete for finished item of work as per SS911 for External walls.
306.41
-
92915
Evaluation Notes How It Works ?
Potential Partner