Panchayat Raj Engineering Department Tender
... More
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Panchayat Raj Engineering Department Tender
Civil And Construction
Water Storage And Supply
Opening Date24 Mar 2025
Closing Date3 Apr 2025
Tender Amount₹ 22,82,964
Costs
EMD
₹ 22,900Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
792778Tender No
38/2024-25/Executive Engineer RWSS Division Paderu Dt.07.03.2025Tender Authority
Panchayat Raj Engineering Department ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Construction of pipeline for water supply with HDPE( PE 100 grade)as per IS: 4984-1995 with its ammendments and revisions thereon including cost and supply of pipes, lowering, laying and jointing of Pipe lines true to alignment and gradient, trench excavation manually for pipe lines in all types of soils and refilling trenches with excavated earth except rock requiring blasting (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work, filling pipeline with water and testing to hydraulic field test pressure including all labour charges laying and jointing as per the directions of the departmental officers and as per the technical specifications of 17 (Part-B of Vol-I) but excluding GST and CED for finished item of pipeline' 75 mm dia HDPE 6 Kg/sqcm (manually) for Distributation Main
200
457
91500
... More
Construction of pipeline for water supply with HDPE( PE 100 grade)as per IS: 4984-1995 with its ammendments and revisions thereon including cost and supply of pipes, lowering, laying and jointing of Pipe lines true to alignment and gradient, trench excavation manually for pipe lines in all types of soils and refilling trenches with excavated earth except rock requiring blasting (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work, filling pipeline with water and testing to hydraulic field test pressure including all labour charges laying and jointing as per the directions of the departmental officers and as per the technical specifications of 17 (Part-B of Vol-I) but excluding GST and CED for finished item of pipeline' 63 mm dia HDPE 6 Kg/sqcm (manually) for Distributation Main
500
400
200100
... More
Construction of pipeline for water supply with HDPE( PE 100 grade)as per IS: 4984-1995 with its ammendments and revisions thereon including cost and supply of pipes, lowering, laying and jointing of Pipe lines true to alignment and gradient, trench excavation manually for pipe lines in all types of soils and refilling trenches with excavated earth except rock requiring blasting (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work, filling pipeline with water and testing to hydraulic field test pressure including all labour charges laying and jointing as per the directions of the departmental officers and as per the technical specifications of 17 (Part-B of Vol-I) but excluding GST and CED for finished item of pipeline' 20 mm dia HDPE 16 Kg/sqcm (manually) for Distributation Main
200
85
17180
... More
Construction of 20000 Lts Capacity OHSR with 9.4 m staging with raft foundation, plastering with CM(1:3) , 3 coats of epoxy paint to inner surface of the reservoir including roof dome and 2 coats of Weather proof emulsion painting for external surfaces, lettering as per Dept Direction, S/Fof the CI D/F Pipes verticals, vlaves, Execution as per Design and drawigns supplied by the Dept., including the cost and conveyance of the all materials , Bends , Specials Etc complete including the following.- M30 Grade Concrete, D.I man hole covers with frame of size 0.60 X 0.60 mts -2 Nos (light duty), DI Swan Neck ventilators shall be provided in Top dome/slab with flyproof mesh, RCC Phinial with copper or Stainless stell flyproof mesh, RCC or Aluminium ladder inside of 0.60 mts width, RCC spiral stair case with handrailing upto 200kl, for above 200kl capacity Doglegged staircase with flight width of 1mt and landing of 1.2mts and SS Handrailing upto 1mt Thedogleggedstaircaseshallbeenclosedwithbrick/CRSwallonthreesidesandfrontsidewithM.Scollapsiblegateupto1stbracelevel from ground level to prevent unauthorized entry, Waterlevel indicator of good quality with ebonite/copper float approved pattern - 1 No, Lightening arrestor of approved pattern 1 No complete including conductor earthing, Railling with Stainless Steel of grade 304 in two rows around OHSR fixed in RCC (1:2:4) of post of size 100x75x75mm with 1.5m m itervals around the pheriphary on top of OHSR, Cost of CI Specials, Cost of D.I sluice valves, Cost of valve chambers,
1
1420000
1420000
... More
Construction of Functional House Hold Tap Connections (FHTC) with PP Clamp Saddle ,Non return cum Flow control valve of 15 mm dia designed for 5 LPM discharge @0.5 bar pressure loss,Compression male/female threaded,cost and supply of 20 mm dia HDPE 16.0 Kg/cm2 (for a length of 3.0 Mts)with laying,jointing,trench excavation up to 0.5 Mts depth including testing,refilling,cost & supply of 15 mm dia GI pipe Medium grade ( for a length of 1.40 Mts) with necessary fittings,supply&fixing of 12.7 mm brass bib cock(long body) indian make heavy duty for finished item of work including cost,conveyance of all materials,labour charges etc with relevent IS codes,by using with food grade material suitable for usage in drinking water system to the extent of departmental satisfaction including Over heads and Contractor Profit@13.615% but excluding GST and Seignorage charges.
50
1591
79550
... More
Construction of Pedastals for FHTCs with earth work Excavation and CC (1:4:8) prop using 40 mm HBG metal , using Random Rubble stone , CC (1:2: 4) using 20 mm guage HG metal including all materials and all labour charges etc. completed but excluding GST and CED
50
950
47500
... More
Construction of Name board mentioning all purticularss of the work with sub works Earth work in exacavation for foundation with CC(1:4:8),super structure with brick masonary in CM(1:6),plastering withCM(1:5) mix of 12 mm thick painting and lettering with acrylic emulsion including cost and conveyance of all materials and labour charges but excluding all taxes and seigniorages charges but including overheads and contractor profit 13.615%
1
6642
6642
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements