Panchayat Raj Engineering Department Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Panchayat Raj Engineering Department Tender
Civil And Construction
Opening Date1 Oct 2024
Closing Date7 Oct 2024
Tender Amount₹ 20,64,746
Costs
EMD
₹ 20,647Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
754726Bid Award Id
ViewTender No
Amendement Tender Notice No. 13 to 22/AE/O&M/2024-25, Dated: 27.09.2024Tender Authority
Panchayat Raj Engineering Department ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Manufacture, Supply and Delivery of Unplasticised PVCs Pipes for potable water supplies conforming to IS : 4985/2000 (3rd revision) with bell ends (Socket) as per specification in light Grey/Natural Ivory Grey/ Any other Color (except White) inclusive of transportation to the sub-divisional stores anywhere in AP excluding all taxes. ( As per SOR & Monthly JUNE approved Resin Rates)
90mm dia PVC Pipes 6 Kg/Cm2
12
1992
166
Manufacture, Supply and Delivery of Unplasticised PVCs Pipes for potable water supplies conforming to IS : 4985/2000 (3rd revision) with bell ends (Socket) as per specification in light Grey/Natural Ivory Grey/ Any other Color (except White) inclusive of transportation to the sub-divisional stores anywhere in AP excluding all taxes. ( As per SOR & Monthly JUNE approved Resin Rates)
110mm dia PVC Pipes 6 Kg/Cm2
16
3856
241
Manufacture, Supply and Delivery of Unplasticised PVCs Pipes for potable water supplies conforming to IS : 4985/2000 (3rd revision) with bell ends (Socket) as per specification in light Grey/Natural Ivory Grey/ Any other Color (except White) inclusive of transportation to the sub-divisional stores anywhere in AP excluding all taxes. ( As per SOR & Monthly JUNE approved Resin Rates)
140mm dia PVC Pipes 6 Kg/Cm2
14
5544
396
Manufacture, Supply and Delivery of Unplasticised PVCs Pipes for potable water supplies conforming to IS : 4985/2000 (3rd revision) with bell ends (Socket) as per specification in light Grey/Natural Ivory Grey/ Any other Color (except White) inclusive of transportation to the sub-divisional stores anywhere in AP excluding all taxes. ( As per SOR & Monthly JUNE approved Resin Rates)
225mm dia PVC Pipes 6 Kg/Cm2
16
17296
1081
Manufacture, Supply and Delivery of Unplasticised PVCs Pipes for potable water supplies conforming to IS : 4985/2000 (3rd revision) with bell ends (Socket) as per specification in light Grey/Natural Ivory Grey/ Any other Color (except White) inclusive of transportation to the sub-divisional stores anywhere in AP excluding all taxes. ( As per SOR & Monthly JUNE approved Resin Rates)
280mm dia PVC Pipes 6 Kg/Cm2
12
19920
1660
Labour Charges for leakage in PVC Pipe line of following diameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud, cleaning of pipe nd leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour, D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts etc complete(but excluding cost of Pipe) As per Annexure - I&II
90mm dia PVC Pipes 6 Kg/Cm2
6
9013
1502.3
Labour Charges for leakage in PVC Pipe line of following diameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud, cleaning of pipe nd leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour, D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts etc complete(but excluding cost of Pipe) As per Annexure - I&II
110mm dia PVC Pipes 6 Kg/Cm2
8
17281
2160.2
Labour Charges for leakage in PVC Pipe line of following diameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud, cleaning of pipe nd leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour, D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts etc complete(but excluding cost of Pipe) As per Annexure - I&II
140mm dia PVC Pipes 6 Kg/Cm2
7
17952
2564.6
Labour Charges for leakage in PVC Pipe line of following diameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud, cleaning of pipe nd leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour, D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts etc complete(but excluding cost of Pipe) As per Annexure - I&II
225mm dia PVC Pipes 6 Kg/Cm2
8
47647
5955.9
Labour Charges for leakage in PVC Pipe line of following diameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud, cleaning of pipe nd leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour, D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts etc complete(but excluding cost of Pipe) As per Annexure - I&II
280mm dia PVC Pipes 6 Kg/Cm2
6
44472
7412
Labour Charges for leakage in HDPE Pipe line of following diameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud, cleaning of pipe nd leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour, D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts etc complete(but excluding cost of Pipe) As per Annexure - I&II
315 mm dia HDPE Pipes 6 Kg/Cm2
6
41399
6899.94
Rewinding of three phase motor of 1400 to 2800 RPM including all necessary material and of the same characteristics as original with required size of super enameled wire 'E' class insulation material and testing etc. as required. ( As per Building SOR - ELEC- 5.9.14 )
10.0 H.P
6
31500
5250
Rewinding of three phase motor of 1400 to 2800 RPM including all necessary material and of the same characteristics as original with required size of super enameled wire 'E' class insulation material and testing etc. as required. ( As per Building SOR - ELEC- 5.9.14 )
15.0 H.P
6
40500
6750
Labour charges for cleaning of sumps/GLBR including cleaning and removal of algae,calcinations,sludge, dirt deposition from side walls and bottom portion of the container by disinfection with bleaching powder with all necessary tools, plants labour charges and cost of disinfectant etc. As per Approved Data (Annexure - VIII) Shall not exceed 4 times
SUMPS
6898.24
56565
82
Labour charges for cleaning of sumps/GLBR including cleaning and removal of algae,calcinations,sludge, dirt deposition from side walls and bottom portion of the container by disinfection with bleaching powder with all necessary tools, plants labour charges and cost of disinfectant etc. As per Approved Data (Annexure - VIII) Shall not exceed 4 times
OHSR & OHBR-90 KL
5168.64
42382
82
Labour charges for cleaning of sumps/GLBR including cleaning and removal of algae,calcinations,sludge, dirt deposition from side walls and bottom portion of the container by disinfection with bleaching powder with all necessary tools, plants labour charges and cost of disinfectant etc. As per Approved Data (Annexure - VIII) Shall not exceed 4 times
OHSR-60 KL
4038.72
33117
82
Labour charges for cleaning of sumps/GLBR including cleaning and removal of algae,calcinations,sludge, dirt deposition from side walls and bottom portion of the container by disinfection with bleaching powder with all necessary tools, plants labour charges and cost of disinfectant etc. As per Approved Data (Annexure - VIII) Shall not exceed 4 times
OHSR-40 KL
1872.96
15358
82
Cost Supply of Capacitors ( As per Approved Data ((Annexure - IX)
20
8464
423.24
Cost & Supply of matirials utilized in Microfilter from approved company to work spot etc.complete. Chips &Fine Quartz
10
140000
14000
Cost & Supply of matirials utilized in Microfilter from approved company to work spot etc.complete. Activated carbon 950 IV
1500
300000
200
Cost & Supply of matirials utilized in Microfilter from approved company to work spot etc.complete. 5/8" Bolts & nuts
4
444
111
Cost & Supply of matirials utilized in Microfilter from approved company to work spot etc.complete. Stauners - Carban Filters & Sand Filter
29
3861
133.15
Cost & Supply of matirials utilized in Microfilter from approved company to work spot etc.complete. 40mm MS Couplings
30
1860
62
Cost & Supply of matirials utilized in Microfilter from approved company to work spot etc.complete. 40mm MS Flanges
30
2175
72.5
Cost & Supply of matirials utilized in Microfilter from approved company to work spot etc.complete. 48/40mm UPVC MTA
30
480
16
Cost & Supply of matirials utilized in Microfilter from approved company to work spot etc.complete. 48/40mm UPVC Dummy
30
450
15
Cost & Supply of matirials utilized in Microfilter from approved company to work spot etc.complete. 40mm GM Valves
4
6768
1692
Cost & Supply of matirials utilized in Microfilter from approved company to work spot etc.complete. For Jumbo Filters Fixing- 150mm MS pipe
3
4652
1550.7
Labour charges to wards fabrication and fixing of internal main lateral pipes inside vessal jumbo filter and fittings all charges etc complete.
1
5000
5000
Cost & Supply of matirials utilized in Microfilter from approved company to work spot etc.complete. 40mm MS pipe incld.fitting etc.
2
495
247.5
Labour charges to wards Removal of Fine sand and activated carbon in to Cylinder of Micro filter etc.. Complete.
30
15750
525
Labour charges to wards relaying of Fine sand and activated carbon in to Cylinder of Micro filter etc.. Complete.
30
15750
525
Cost and supply and fixing of Alum dosing pump incld. All Labour Etc complete.
1
5000
5000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements