Panchayat Raj Engineering Department Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Panchayat Raj Engineering Department Tender
Civil And Construction
Water Storage And Supply
Opening Date22 Sep 2024
Closing Date15 Oct 2024
Tender Amount₹ 35,69,445
Costs
EMD
₹ 35,694Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
753041Tender No
Tender Notice No 23/2024-25 Dated 10/09/2024 of the Superintending Engineer, RWS&S Circle, KurnoolTender Authority
Panchayat Raj Engineering Department ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Earth work excavtion for pipe line trench of size 2.00x 1.10 X 1.20 Mts for 160 mm pvc 6/kg cm2 pipeline leakges in all soils including lowering, laying and jointing of pipe lines true to alignment and gradient and refilling trenches with excavated earth with watering, tamping and removing surplus earth from site of work and filling pipe line with water and testing etc.,
20
56207
2810.36
Earth work excavtion for pipe line trench of size 2.00x 1.10 X 1.20 Mts for 140 mm pvc 6/kg cm2 pipeline leakges in all soils including lowering, laying and jointing of pipe lines true to alignment and gradient and refilling trenches with excavated earth with watering, tamping and removing surplus earth from site of work and filling pipe line with water and testing etc.,
10
26835
2683.51
Earth work excavtion for pipe line trench of size 2.00x 1.10 X 1.20 Mts for 125 mm pvc 6/kg cm2 pipeline leakges in all soils including lowering, laying and jointing of pipe lines true to alignment and gradient and refilling trenches with excavated earth with watering, tamping and removing surplus earth from site of work and filling pipe line with water and testing etc.,
15
34679
2311.91
Earth work excavtion for pipe line trench of size 2.00x 0.9 X 1.20 Mts for 110 mm pvc 6/kg cm2 pipeline leakges in all soils including lowering, laying and jointing of pipe lines true to alignment and gradient and refilling trenches with excavated earth with watering, tamping and removing surplus earth from site of work and filling pipe line with water and testing etc.,
15
27665
1844.31
Earth work excavation and depositing on banks with an intial lead and lift in BC OG read earth soils of pipe line trench of size 2.00 x 0.9x 1.20 mts including lowering, laying and jointing of 90 mm dia PVC 6kg/cm2 pipe including cost of pipe refilling in the trench of the pipe line etc.,complete. For pipeline leakges
15
24108
1607.18
Removal of 40 HP Three Phase Centrifugal Pumpset from Scheme source including all other materials and labour charge etc., complete.
2
3000
1500
Removal of 20HP Three Phase Centrifugal Pumpset from Scheme source including all other materials and labour charge etc., complete.
5
7500
1500
Removal of 15 HP Three Phase Centrifugal Pumpset from Scheme source including all other materials and labour charge etc., complete.
4
6000
1500
Removal of 10 HP Three Phase Centrifugal Pumpset from Scheme source including all other materials and labour charge etc., complete.
6
9000
1500
Removal of 40 HP Three Phase Sub merissible Pumpset from Scheme source including all other materials and labour charge etc., complete.
4
6000
1500
Removal of 10 HP Three Phase Sub merissible Pumpset from Scheme source including all other materials and labour charge etc., complete.
8
24000
3000
Removal of 7.5HP Three Phase Sub merissible Pumpset from Scheme source including all other materials and labour charge etc., complete.
10
30000
3000
Removal of 5 HP Three Phase Sub merissible Pumpset from Scheme source including all other materials and labour charge etc., complete.
10
30000
3000
Removal of3 HP Three Phase Sub merissible Pumpset from Scheme source including all other materials and labour charge etc., complete.
8
8000
1000
Transportation of Three phase pumpset from Scheme source with good copper wire including all other materials and labour charge etc., complete.
114
57000
500
Rewinding of 40 HP Three phase Centrifugal pumpset from Scheme source with good copper wire including all other materials and labour charge etc., complete.
2
49591
24795.25
Rewinding of 20 HP Three phase Centrifugal pumpset from Scheme source with good copper wire including all other materials and labour charge etc., complete.
5
89263
17852.58
Rewinding of 15 HP Three phase Centrifugal pumpset from Scheme source with good copper wire including all other materials and labour charge etc., complete.
4
27000
6750
Rewinding of 10 HP Three phase Centrifugal pumpset from Scheme source with good copper wire including all other materials and labour charge etc., complete.
6
31500
5250
Rewinding of 40 HP Three phase Sub merissible pumpset from Scheme source with good copper wire including all other materials and labour charge etc., complete.
4
99181
24795.25
Rewinding of 10 HP Three phase Sub merissible pumpset from Scheme source with good copper wire including all other materials and labour charge etc., complete.
8
42000
5250
Rewinding of 7.5 HP Three phase Sub merissible pumpset from Scheme source with good copper wire including all other materials and labour charge etc., complete.
10
39000
3900
Rewinding of 5 HP Three phase Sub merissible pumpset from Scheme source with good copper wire including all other materials and labour charge etc., complete.
10
36000
3600
Rewinding of 3 HP Three phase Sub merissible pumpset from Scheme source with good copper wire including all other materials and labour charge etc., complete.
8
20400
2550
Labour charges for erection of 40 HP three phase centrifugal pumpsets including pipe connection for suction and delivery and all labour charges etc., complete.,
2
6250
3125
Labour charges for erection of 20 HP three phase centrifugal pumpsets including pipe connection for suction and delivery and all labour charges etc., complete.,
5
15625
3125
Labour charges for erection of 15 HP three phase centrifugal pumpsets including pipe connection for suction and delivery and all labour charges etc., complete.,
4
12500
3125
Labour charges for erection of 10 HP three phase centrifugal pumpsets including pipe connection for suction and delivery and all labour charges etc., complete.,
6
11490
1915
Labour charges for erection of 40 HP three phase Sub merissible pampsets including pipe connection for suction and delivery and all labour charges etc., complete.,
4
26610
6652.5
Labour charges for erection of 10 HP three phase Sub merissible pampsets including pipe connection for suction and delivery and all labour charges etc., complete.,
8
45960
5745
Labour charges for erection of 7.5 HP three phase Sub merissible pampsets including pipe connection for suction and delivery and all labour charges etc., complete.,
10
57450
5745
Labour charges for erection of5 HP three phase Sub merissible pampsets including pipe connection for suction and delivery and all labour charges etc., complete.,
10
57450
5745
Labour charges for erection of 3 HP three phase Sub merissible pampsets including pipe connection for suction and delivery and all labour charges etc., complete.,
8
30240
3780
Routine maintenance of transformer, including testing of insulation resistance, oil breakdown 2 strength. Reconditioning / replacement of silica zel, cleaning of transformer and topping upto oil level if required (extra cost will be paid for oil). ELEC 6.4.3
5
26730
5346
Testing of Transformer oil for dielectric breakdown strength.ELEC 6.4.4 all labour charges etc., complete.,
5
3565
713
Supply and Delivery of 80mm GI 'B' Class Pipe including cost conveyance of materials and labour charges etc completed
12
12917
1076.39
Supply and Delivery of 100mm GI 'B' Class Pipe including cost conveyance of materials and labour charges etc completed
18
27569
1531.6
Resilient Seated Soft Sealing" Gate Valves (Sluice Welves) with Body and Bonnet of Ductile Iron GGG- 40/SG-400/15 or GGG-50/SG-500/7 or Equivalent as per IS1865, IS : 3896-2, without bypass upto 400mm dia and with bypass above 400mm dia including transportations charges etc completed-80 mm P.N 1.60
4
58216
14554
Resilient Seated Soft Sealing" Gate Valves (Sluice Welves) with Body and Bonnet of Ductile Iron GGG- 40/SG-400/15 or GGG-50/SG-500/7 or Equivalent as per IS1865, IS : 3896-2, without bypass upto 400mm dia and with bypass above 400mm dia including transportations charges etc completed-100 mm P.N 1.60
3
56601
18867
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements