Panchayat Raj Engineering Department Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Panchayat Raj Engineering Department Tender
Civil And Construction
Civil Works Others
Opening Date29 Jul 2024
Closing Date12 Aug 2024
Tender Amount₹ 28,84,227
Costs
EMD
₹ 28,850Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
746181Bid Award Id
ViewTender No
No.24/2024-25, Dt.03-07-2024Tender Authority
Panchayat Raj Engineering Department ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Cost and supply of 250 mm dia PVC Pipes 4 Kg/cm2 excluding all taxes and conveyance charges etc complete.
12
11544
962.07
Cost and supply of 180 mm dia PVC Pipes 4 Kg/cm2 excluding all taxes and conveyance charges etc complete.
18
9205
511.4
Cost and supply of 160 mm dia PVC Pipes 4 Kg/cm2 excluding all taxes and conveyance charges etc complete.
18
7210
400.61
Cost and supply of 140 mm dia PVC Pipes 4 Kg/cm2 excluding all taxes and conveyance charges etc complete.
18
5482
304.56
Cost and supply of 110 mm dia PVC Pipes 4 Kg/cm2 excluding all taxes and conveyance charges etc complete.
52
9685
186.25
Cost and supply of 90 mm dia PVC Pipes 4 Kg/cm2 excluding all taxes and conveyance charges etc complete.
120
15448
128.74
Cost and supply of 110 mm dia HDPE Pipes 4Kg/cm2 excluding all taxes and conveyance charges etc complete.
125
30227
241.82
Cost and supply of 90 mm dia HDPE Pipes 6Kg/cm2 excluding all taxes and conveyance charges etc complete.
225
51138
227.28
Repair to 315 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)
2
17243
8621.9
Repair to 250 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)
5
28877
5775.5
Repair to 180 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)
12
44464
3705.4
Repair to 160 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)
12
43360
3613.4
Repair to 140 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)
12
29736
2478
Repair to 110 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)
12
25652
2137.7
Repair to 90 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)
24
35724
1488.5
Repair to 110 mm dia HDPE pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)
24
60996
2541.52
Repair to 90 mm dia HDPE pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)
24
43816
1825.68
Rewinding charges of 15 HP Monoblock electircal motor and pump set, including cost of copper wire, cost of spares, cost of all required accessories, rewinding charges, foundry charges and re errection etc complete as per standard specifications
1
17344
17344.65
Rewinding charges of 10 HP Monoblock electircal motor and pump set, including cost of copper wire, cost of spares, cost of all required accessories, rewinding charges, foundry charges and re errection etc complete as per standard specifications
2
23126
11563.1
Rewinding charges of 5 HP Monoblock electircal motor and pump set, including cost of copper wire, cost of spares, cost of all required accessories, rewinding charges, foundry charges and re errection etc complete as per standard specifications
2
13181
6590.98
Rewinding charges of 7.50 HP Monoblock electircal motor and pump set, including cost of copper wire, cost of spares, cost of all required accessories, rewinding charges, foundry charges and re errection etc complete as per standard specifications
2
15032
7516.02
Rewinding charges of 6 HP Monoblock electircal motor and pump set, including cost of copper wire, cost of spares, cost of all required accessories, rewinding charges, foundry charges and re errection etc complete as per standard specifications
1
7001
7001.16
Rupees Twenty Eight Lakhs Eighty Four Thousand Two Hundred Twenty Seven And Paise Tweleve Only
-
2884227
-