Panchayat Raj Engineering Department Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Panchayat Raj Engineering Department Tender
Civil And Construction
Road Construction
Opening Date19 Jun 2023
Closing Date26 Jun 2023
Tender Amount₹ 16,13,309
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
634902Bid Award Id
ViewTender No
TO/213/2023-24 Dated 08.06.2023 (2nd Call )Tender Authority
Panchayat Raj Engineering Department ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of plain cement concrete pavement, thickness as per design, over a prepared sub base, with M20 Grade design mix concrete using 43 grade cement, coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and laid in approved fixed side formwork, laying and fixing of 125 mictron thick polythene film, compacted using plate vibrators, curing of concrete slabs for 14- days, curing compound and water finishing to lines and grade as per drawing and Technical Specification.including contractors profit & Over head charges, excluding GST and Seigneorage etc., complete
181.05
1132616
6255.82
... More
Operational Charges for Vaccum dewatering system for finishing the CC,Pavements with screed vibration placing of filter mat,top mat,vacuum process,floating,troweling,brooming with wire brush etc,complete as directed during execution(Delhi SSR) including contractors profit & Over head charges, excluding GST and Seigneorage etc., complete
181.05
27438
151.55
... More
Contraction sawn joint groove (using diamond studded blades) 3to 5mm wide and 1/4 to 1/3 of the slab+or 5mm or as stibulated in the drawings and dowel bars compling with clause 602.6.5 of specifications for road and bridge works(third revesion)publishednew delihi in 1995 by IRC on behalf of Government of India,Ministery of surface transport as directed in the drawings. THe contraction joint shallbe cut as soon as the concrete as under gone initial hardening and as hard enough take the load of joint sawing machine with out causing damege to the slab . The joint celing compound shall be hot pored bitumen type having flexibility ,resistence to age hardening and durability of the sealant shall be in accordence with BS 5212 (part-2) with all lead 7 lift including cost and conveyance of all materials and Etc. comlpete for 50mm depth including contractors profit & Over head charges, excluding GST and Seigneorage etc., complete
266.25
40837
153.38
... More
Filling with Selected Earth in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including all operational, incidental, labour charges etc., complete for finished item of work as per specification Clause 305.3.9 MORD & 304 MORTH for Shouldersincluding contractors profit & Over head charges, excluding GST and Seigneorage etc., complete
57.94
17109
295.3
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements