Panchayat Raj Engineering Department Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Panchayat Raj Engineering Department Tender
Civil And Construction
Opening Date8 Jan 2025
Closing Soon16 Jan 2025
Tender Amount₹ 27,33,199
Costs
EMD
₹ 27,332Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
778733Tender No
Tender Notice No 78/2024-25 Dated 27/12/2024 of the Superintending Engineer, RWS&S Circle, KurnoolTender Authority
Panchayat Raj Engineering Department ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Supply & Fixing of 140mm dia 6kgs/cm2 PVC Pipe including cost and conveyance of all matarials and all labour charges etc complete
40
396
15840
... More
Supply & Fixing of 160mm dia 6kgs/cm2 PVC Pipe including cost and conveyance of all matarials and all labour charges etc complete
40
512
20480
... More
Supply & Fixing of 250mm dia 6kgs/cm2 PVC Pipe including cost and conveyance of all matarials and all labour charges etc complete
40
1316
52640
... More
Labour Charges for leakage in 90mm dia 6kgs/cm2 PVC Pipe line of following diameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud, cleaning of pipe nd leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour, D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts etc complete(but excluding cost of Pipe) As per Annexure - 1&11
32
1506
48201
... More
Labour Charges for leakage in 110mm dia 6kgs/cm2 PVC Pipe line of following diameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud, cleaning of pipe nd leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour, D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts etc complete(but excluding cost of Pipe) As per Annexure - 1&11
31
2146
66543
... More
Labour Charges for leakage in 140mm dia 6kgs/cm2 PVC Pipe line of following diameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud, cleaning of pipe nd leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour, D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts etc complete(but excluding cost of Pipe) As per Annexure - 1&11
20
2486
49731
... More
Labour Charges for leakage in 160mm dia 6kgs/cm2 PVC Pipe line of following diameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud, cleaning of pipe nd leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour, D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts etc complete(but excluding cost of Pipe) As per Annexure - 1&11
20
3575
71519
... More
Labour Charges for leakage in 240mm dia 6kgs/cm2 PVC Pipe line of following diameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud, cleaning of pipe nd leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour, D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts etc complete(but excluding cost of Pipe) As per Annexure - 1&11
20
5364
107290
... More
Supply and Utization of Alum including cost and conveyance of all matarials and all labour charges etc complete
16.3
8480
138224
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%