Panchayat Raj Engineering Department Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Panchayat Raj Engineering Department Tender

Works
Civil And Construction
Water Storage And Supply
Opening Date21 Nov 2024
Closing Date5 Dec 2024
Tender Amount₹ 21,16,258 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cost ,supply and utilisation of 90 mm dia PVC pipe 6kg/cms including all charges etc complete

12

166

1999.56

... More
Cost ,supply and utilisation of 110 mm dia PVC pipe 6kg/cms including all charges etc complete

15

241

3628.5

... More
Cost ,supply and utilisation of 200 mm dia PVC pipe 6kg/cms including all charges etc complete

18

806

14508.36

... More
Cost ,supply and utilisation of 250 mm dia A.C. Pipe Class - 15 including all charges etc complete

25

1271

31788.75

... More
Labour Charges for leakage in 90 mm dia PVC Pipe line of following diameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud, cleaning of pipe nd leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour, D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts etc complete(but excluding cost of Pipe) As per Annexure - I&II

6

1274

7649.4

... More
Labour Charges for leakage in 110 mm dia PVC Pipe line of following diameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud, cleaning of pipe nd leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour, D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts etc complete(but excluding cost of Pipe) As per Annexure - I&II

7

1819

12733.7

... More
Labour Charges for leakage in 200 mm dia PVC Pipe line of following diameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud, cleaning of pipe nd leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour, D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts etc complete(but excluding cost of Pipe) As per Annexure - I&II

8

4308

34466.4

... More
Labour Charges for leakage in 250 mm dia A.C. Pipe Class - 15 of following diameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud, cleaning of pipe nd leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour, D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts etc complete(but excluding cost of Pipe) As per Annexure - I&II

10

4447

44472.9

... More
Provision for cost and supply and delivery and installation and commission of 20.00 HP 3 phase submersible pumpset including all accessories Head - 40mts and LPM 1350.

20

9500

190000

... More
Provision for cost and supply and delivery and installation and commission of 12.50 HP 3 phase submersible pumpset including all accessories Head - 46mts and LPM 700.

12.5

9500

118750

... More
Provision for cost and supply and delivery and installation and commission of 25.00 HP 3 phase submersible pumpset including all accessories Head - 49mts and LPM 1350.

25

9500

237500

... More
Rupees Twenty one lakh ssixteen thousand two hundered fifty eight and paise fourty six only

2116258.46

-

-

... More
The quantities specified in the above items of work are approximate.

-

-

-

... More
Note: Based on the actual execution BOQ will be arrived accordingly paymnet will be made to the present and previous contractors.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.