Panchayat Raj Engineering Department Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Panchayat Raj Engineering Department Tender
Civil And Construction
Building Construction
Opening Date3 Feb 2024
Closing Date12 Feb 2024
Tender Amount₹ 16,70,360
Costs
EMD
₹ 16,800Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
717720Tender No
Nit No.225/MPLAD Grant Sri Vemireddy Prabhakar Reddy /EEPRIAKP/2023-24/Dt.22.01.2024, EE.PRI.Anakapalli (1st call)Tender Authority
Panchayat Raj Engineering Department ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Filling with Usefull available Execavated Earth in trenches,sides of foundations & basement from approved quarry in layers not exceeding 15cm thick,consolidating. Each deposited layer by watering and ramming,including all operational,incidental,labour charges, hire charges of T & p etc., complete including cost and conveyance of gravel for finished item of work.(APSS No.309 & 310) Including contract profit, overhead charges, But excluding GST and Seigniorage charges
71.41
23786
333.1
Filling with selected earth in trenches, sides of foundations & basement from approved quarry in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming, including all operational, incidental, labour charges, hire charges of T & P etc. complete including cost and conveyance of sand for finished item of work. (APSS No 309 & 310). Including contract profit, overhead charges, But excluding GST and Seigniorage charges
90
42934
477.05
Vibrated Reinforced Cement Concrete M-25 Design Mix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work (APSS No. 402 & 403)- For Footings Including contract profit, overhead charges, But excluding GST and Seigniorage charges
16.2
148032
9137.76
Vibrated Reinforced Cement Concrete M-25 Design Mix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work (APSS No. 402 & 403)- For Pedastals Including contract profit, overhead charges, But excluding GST and Seigniorage charges
0.86
8287
9636.53
Vibrated Reinforced Cement Concrete M-25 Design Mix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work (APSS No. 402 & 403)- For Plinth Beams Including contract profit, overhead charges, But excluding GST and Seigniorage charges
3.4
39180
11523.67
Vibrated Reinforced Cement Concrete M-25 Design Mix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work (APSS No. 402 & 403)- For Columns Including contract profit, overhead charges, But excluding GST and Seigniorage charges
3.16
37461
11854.61
Vibrated Reinforced Cement Concrete M-25 Design Mix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work (APSS No. 402 & 403)- For Lintels Including contract profit, overhead charges, But excluding GST and Seigniorage charges
0.18
2168
12044.35
Vibrated Reinforced Cement Concrete M-25 Design Mix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work (APSS No. 402 & 403) - for 600 mm wide Sun shades with 75 mm thick at fixed end and 50 mm thick at free end Including contract profit, overhead charges, But excluding GST and Seigniorage charges
2.34
2573
1099.62
Vibrated Reinforced Cement Concrete M-25 Design Mix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work (APSS No. 402 & 403)- For Roofbeams Including contract profit, overhead charges, But excluding GST and Seigniorage charges
9.52
106275
11163.32
Vibrated Reinforced Cement Concrete M-25 Design Mix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work (APSS No. 402 & 403) - For Roof Slab 125mm thick Including contract profit, overhead charges, But excluding GST and Seigniorage charges
75.72
102413
13525.26
Masonry for panel walls in substructure with CM (1:6) prop: (cement : sand) using Fly ash lime solid blocks of size -290 x 225 x 140 mm and having minimum crushing strength of 50 Kg/Sqcm and using flyash of 80 kgs, cement of 15 kgs, Gypsum of 5 kgs and stone dust for manufacturing of Fly ash lime solid blocks including cost and conveyance of all materials to site, including labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504). Including contract profit, overhead charges, But excluding GST and Seigniorage charges
14.5
96420
6649.64
Brick Masonry for panel walls in superstructure with CM (1:8) prop: (cement : sand) using second class traditional bricks of size 23x11x7 cm from approved quarry and having minimum crushing strength of 35 Kg/Sqcm. including cost and conveyance of all materials and labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504). Including contract profit, overhead charges, But excluding GST and Seigniorage charges
25.61
194532
7595.27
Supply and Fixing of 25mm dia 2.2mm thick PVC pipe (ISI MARK) concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete.. Including contract profit, overhead charges, But excluding GST and Seigniorage charges
65
4787
73.65
Providing high yield strength deformed (HYSD) steel bars (Fe 500 grade as per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work Including contract profit, overhead charges and Seigniorage charges, But excluding GST
4.6
407963
88687.52
Plastering 12mm(1:5) thick in single coat for even surfaces with dubara sponge finishing including cost and conveyance of all materials, to site, cost of seigniorage charges and all other taxes on all materials, and operational, incidental charges and all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves etc. as directed by Engineer-in-charge, complete for finished item of work (APSS No. 901 & 904) for Inside of the Building Including contract profit, overhead charges, But excluding GST and Seigniorage charges
133
44277
3329.13
Plastering 12mm(1:5) thick in single coat for even surfaces with dubara sponge finishing including cost and conveyance of all materials, to site, cost of seigniorage charges and all other taxes on all materials, and operational, incidental charges and all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves etc. as directed by Engineer-in-charge, complete for finished item of work (APSS No. 901 & 904) for Outside of the Building Including contract profit, overhead charges, But excluding GST and Seigniorage charges
136.07
60787
4467.3
Ornamental Plastering to Ceiling 12mm thick in single coat in CM(1:3) including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work(APSS No. 901 & 903) Including contract profit, overhead charges, But excluding GST and Seigniorage charges
60
21512
3585.41
Flooring with Double charged / multi charged stain free full body porcelain vitrified tiles with double layer pigment of size 600 x 600 mm and thickness between 8-10 mm 1st quality, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, for finished item of work, but excluding the cost of conveyance of all materials. Including contract profit, overhead charges, But excluding GST and Seigniorage charges
60
73244
12207.32
Providing skirting to internal walls to 12.50 cm height / risers of steps with ceramitilesthick, length equal to flooring stones set over base coat of CM(1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges etc., complete for finished item of work. Including contract profit, overhead charges, But excluding GST and Seigniorage charges
3.8
4610
12131.34
White washing two coats with Suryacem to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including all charges complete for finished item of work. Including contract profit, overhead charges, But excluding GST and Seigniorage charges
269.08
11607
431.35
Providing and applying synthetic plaster putty or plaster of paris putty or lime punning of average 1 to 2mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, sand the surface, clean & wipe off loose dust, applying kniffing paste filler by putty knife/muslin pad, air dry for 2-3 hours, sand with 180 and 320 No, emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., complete for finished item of work Internal Walls Including contract profit, overhead charges, But excluding GST and Seigniorage charges
269.08
55462
2061.16
Painting to new walls with 2 coats of plastic emulsion paint of approved brand over primer coat with cement primer grade - I and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., complete for finished item of work as per SS-911 for External walls Internal Walls Including contract profit, overhead charges, But excluding GST and Seigniorage charges
100
17970
179.7
Providing and fixing factory made uPVC white colour sliding glazed windowupto 1.80 m in height dimension comprising of uPVC multi-chamberedframe with in-built roller track and sash extruded profiles duly reinforcedwith 1.60 ± 0.2 mm thick galvanized mild steel section made from rollforming process of required length (shape & size according to uPVCprofile), appropriate dimension of uPVC extruded glazing beads anduPVC extruded interlocks, EPDM gasket,wool pile, zinc alloy (whitepowder coated) touch locks with hook, zinc alloy body with single nylonrollers (weight bearing capacity to be 40 kg), G.I fasteners 100 x 8 mmsize for fixing frame to finished wall and necessary stainless steel screwsetc. Profile of frame & sash shall be mitred cut and fusion welded at allcorners, including drilling of holes for fixing hardware's and drainage ofwater etc. After fixing frame the gap between frame and adjacent finishedwall shall be filled with weather proof silicon sealent over backer rod ofrequired size and of approved quality, all complete as per approved drawing& direction of Engineer-in-Charge inclusive of cost of Single / double glass panes, wire mesh and silicon sealent .Note: For uPVC frame and sash extruded profiles minus 5% tolerancein dimension i.e. in depth & width of profile shall be cceptable.Variation in profile dimension in higher side shall be accepted. But no extra payment on this account shall be made. Including contract profit, overhead charges, But excluding GST and Seigniorage charges
2
16417
8208.68
Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) Fire Retardant (FRLS) P.V.C. insulated flexible copper cable of makes GM/ L&T/ RPG/Havells/ V-Guard/ Powerflex/ Polycab/ Gold Medal/ Standard/ Million/ Vimal/ Sun cab/ Paragon/ Delton (ISI MARK) in existing pipe with 6A switch and Ceiling rose of make Anchor/ Gold Medal Olive/ Million Zoom and 3mm thick hylam sheet covering to switch control box including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings . Including contract profit, overhead charges, But excluding GST and Seigniorage charges
40
23518
587.96
Supply and fixing of 6A 3 pin wall plug socket with 6A switch control of make Anchor/ Gold Medal Olive/ Million Zoom on a common switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete Including contract profit, overhead charges, But excluding GST and Seigniorage charges
30
4516
150.54
Supply and fixing of 16A 3pin / 6A 3pin plug socket with indicator lamp and 16Amps fuse unit and 16 Amps (5 in one) of make Anchor/ Gold Medal Olive/ Million Zoom on decolam sheet covered board including earth connection and all labour charges etc., complete on wall. Existing Board (Socket without Switch) Including contract profit, overhead charges, But excluding GST and Seigniorage charges
10
3687
368.68
Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) FRLC P.V.C. insulated flexible copper cable of makes GM/ L&T/ RPG/Havells/ V-Guard/ Powerflex/ Polycab/ Gold Medal/ Standard/ Million/ Vimal/ Sun cab/ Paragon/ Delton (ISI MARK) in existing pipe for mains inlcuding all labour charges etc., complete. Including contract profit, overhead charges, But excluding GST and Seigniorage charges
75
6065
80.87
Supply and run of 2 of 56/0.3mm (4 Sq.mm) FRLC P.V.C. insulated flexible copper cable of makes GM/ L&T/ RPG/Havells/ V-Guard/ Powerflex/ Polycab/ Gold Medal/ Standard/ Million/ Vimal/ Sun cab/ Paragon/ Delton (ISI MARK) in existing pipe for mains inlcuding all labour charges etc., complete. Including contract profit, overhead charges, But excluding GST and Seigniorage charges
60
7236
120.6