Panchayat Raj Engineering Department Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Panchayat Raj Engineering Department Tender

Works
Civil And Construction
Civil Works Others
Opening Date29 Jul 2024
Closing Date12 Aug 2024
Tender Amount₹ 53,95,164 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply and delivery of Ferric Alum including transportation charges. The rate is excluding of GST @ 18%.

70

829500

11850

... More
Cost and supply of 315 mm dia PVC Pipes 6 Kg/cm2 excluding all taxes and conveyance charges etc complete.

18

41776

2320.89

... More
Cost and supply of 280 mm dia PVC Pipes 6 Kg/cm2 excluding all taxes and conveyance charges etc complete.

18

32959

1831.1

... More
Cost and supply of 250 mm dia PVC Pipes 6 Kg/cm2 excluding all taxes and conveyance charges etc complete.

6

8714

1452.37

... More
Cost and supply of 225 mm dia PVC Pipes 6 Kg/cm2 excluding all taxes and conveyance charges etc complete.

18

21438

1191.02

... More
Cost and supply of 200 mm dia PVC Pipes 6 Kg/cm2 excluding all taxes and conveyance charges etc complete.

6

5343

890.62

... More
Cost and supply of 180 mm dia PVC Pipes 6 Kg/cm2 excluding all taxes and conveyance charges etc complete.

4

2923

730.82

... More
Cost and supply of 160 mm dia PVC Pipes 6 Kg/cm2 excluding all taxes and conveyance charges etc complete.

4

2269

567.35

... More
Cost and supply of 140 mm dia PVC Pipes 6 Kg/cm2 excluding all taxes and conveyance charges etc complete.

4

1755

438.98

... More
Cost and supply of 110 mm dia PVC Pipes 6 Kg/cm2 excluding all taxes and conveyance charges etc complete.

4

1068

267.24

... More
Cost and supply of 90 mm dia PVC Pipes 6 Kg/cm2 excluding all taxes and conveyance charges etc complete.

4

736

184.22

... More
Repair to 315 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)

4

34487

8621.9

... More
Repair to 280 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)

4

26272

6568

... More
Repair to 250 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)

1

5775

5775.5

... More
Repair to 225 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)

4

21294

5323.5

... More
Repair to 200 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)

1

4141

4141.7

... More
Repair to 180 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)

1

3705

3705.4

... More
Repair to 160 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)

1

3613

3613.4

... More
Repair to 140 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)

1

2478

2478

... More
Repair to 110 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)

1

2137

2137.7

... More
Repair to 90 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)

1

1488

1488.5

... More
Rewinding charges of 100 HP Monoblock electircal motor and pump set, including cost of copper wire, cost of spares, cost of all required accessories, rewinding charges, foundry charges and re errection etc complete as per standard specifications

2

239116

119558

... More
Rewinding charges of 150 HP Verticle Turbain electircal motor and pump set, including cost of copper wire, cost of spares, cost of all required accessories, rewinding charges, foundry charges and re errection etc complete as per standard specifications

1

178956

178956

... More
(Rupees Fifty Three Lakhs Ninety Five Thousand One Hundred Sixty Three and Paise Sixty Two only)

-

5395163

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.