Municipality Tender

... More
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Municipality Tender

Works
Civil And Construction
Drainage Work
Opening Date6 Mar 2025
Closing Date20 Mar 2025
Tender Amount₹ 3,69,455 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earthwork in excavation for Drains as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH.as per SS and as directed by the Department Officer in charge of the work.

96.6

289

27954.11

... More
Filling Dust in foundation trenches as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH. The rate including cost and conveyance of all material, labour charges for filling, watering, ramming, etc., complete as per SS and as directed by the departmental officer in charge of the work but excluding seigniroage charges.

12.88

1093

14079.13

... More
Plain Cement concrete (1:4:8) using 40 mm metal with concrete mixer. All work upto plinth level including cost of all materials and labour charges etc., complete as per SS and as directed by the departmental officer in charge of the work but excluding seigniorage charges.

12.88

4546

58558.02

... More
Providing Concrete for plain/ reinforced concrete (1:2:4) Nominal mix using 20 mm nominal size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including cutting for 14 days complete as per drawings and technical specifications as per SS and as directed by the departmental officer in charge of the work but excluding seigniorage charges.For Bed

12.88

5844

75283.21

... More
Providing Concrete for plain/ reinforced concrete (1:2:4) Nominal mix using 20 mm nominal size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including cutting for 14 days complete as per drawings and technical specifications as per SS and as directed by the departmental officer in charge of the work but excluding seigniorage charges.For Body Walls

27.17

6071

164964.83

... More
Carting away of excavated earth/ debris to a lead of 3 Km. The rate including conveyance charges, labour charges for loading, unloading, etc., complete as directed by the departmental officer in charge of the work

96.6

80

7784.99

... More
Laying Sand Bags in the stipulated places including cost of empty cement bag, sand, thread, stiching charges and labour charges with 13.615 % overhead charges and contractors profits. (sand rate for filling is considered) Note: During the emergency conditions such as floods and other natural calamities, the above rate is allowed to enhance by 25% for 1st warning level and above, keeping in view of the difficulty in availability of labour and vehicles.

30

38

1140

... More
Bailing out of water from the trench with oil engine driven pumpset of capacity 5 HP. The rate including hire charges of oil engine, fuel charges, wages for driver, helper, etc., complete as directed by the departmental officer in charge of the work.

13

361

4693.26



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.