Municipality Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Municipality Tender
Civil And Construction
Drainage Work
Opening Date12 Sep 2024
Closing Date18 Sep 2024
Tender Amount₹ 2,72,005
Costs
EMD
₹ 2,720Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
752536Tender No
06/2024-25/General FundTender Authority
Municipality ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Providing PCC Grade M15 (Design Mix) MORTH 12.08A using 20mm graded metal in open foundations using 20mm nominal size graded hard stone aggregate, mechanically mixed, placedin foundation and compacted by vibration including curing for 14 days complete as per drawing and technical specification clause 802,803,1202 & 1203 MORD and 1500,1700 & 2100 MORTH for Drain Bed
1.51
8090
5357.74
Collection, supply and filling of Stone crusher dust finer than 3mm with not more than 10% passing 0.075 sieve including cost and conveyance of all materials, labour charges, watering and compacting etc., complete as per sa under bed concrete
17.25
18834
1091.85
Plain cement concrete (1:4:8) using 40mm HBG Metal with concrete mixture including cost and conveyance of all materials, labour charges, machine mising charges and curing charges etc., complete as per ss
11.5
50482
4389.76
Vibrated cement concrete M 30 grade design mix using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000 1 and fine aggregate conforming to table 1000-2) including cost, ting curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification and as directed by the Engineer-in-Charge for C.C Pavement
16.54
101785
6153.89
VRCC M-30 Nominal mix (Cement fineaggregate coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc, to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shutteing for culvert slabs
0.54
3690
6832.62
Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT)/Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1766-1970) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap- splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending. placing in position, tying etc, complete for finished item of work as per SS and as Directed by the Departmental Authroties (APSS No 126)
48.6
4443
91.42
Carting away the surplus excavated earth from the work site with a lead 8 of 2.00 Km beyond initial lead including loading, unloading and conveyance but excluding stacking charges etc. complete.
35.45
2103
59.31
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements