Municipality Tender
... More
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Municipality Tender
Paints and Enamels
Opening Date26 Sep 2020
Closing Date3 Oct 2020
Tender Amount₹ 8,04,870
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
352252Bid Award Id
ViewTender No
20/PNR/2019-20Tender Authority
Municipality ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of Compound Wall to Hindu Burrial Ground in Ward No.3.;Plastering in CM(1:3) proportion of 12mm thicknes including c/c of all material and labour charges etc,. Complete for ceiling.
355.16
305
108448
... More
Construction of Compound Wall to Hindu Burrial Ground in Ward No.3.;Brick Masonry upto Basement level with CM (1:6) prop: using 2 nd class traditional bricks of size 23X11X7 cm from approved quarry including Cost and Conveyance of all materials like cement, sand, bricks, water etc., to site, including materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504).
39.47
5829
230084
... More
Construction of Compound Wall to Hindu Burrial Ground in Ward No.3.;c) for Columns
3.62
9779
35403
... More
Construction of Compound Wall to Hindu Burrial Ground in Ward No.3.;b) for Plinth Beam
7.18
10298
73941
... More
Construction of Compound Wall to Hindu Burrial Ground in Ward No.3.;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, including centering, shuttering. for piles concrete
6.99
5779
40400
... More
Construction of Compound Wall to Hindu Burrial Ground in Ward No.3.;Supply and placing separation membrane of impermeable plastic sheeting 125 micron thick under pavement slab including cost and conveyance et., complete
27
17
468
... More
Construction of Compound Wall to Hindu Burrial Ground in Ward No.3.;Vibrated cement concrete M30 grade using 20mm & 10mm HBG crushed stone aggregate including cost seigniorage conveyance of all materials to site and labour charges, centering, machine mixing laying vibrating curing etc including all other incidental and operational charges of all T&P etc complete for finished item of work as per MORTH specification and as directed by the Engineer -in- charge for CC pavement
4.59
5208
23905
... More
Construction of Compound Wall to Hindu Burrial Ground in Ward No.3.;Providing concrete for plain/reinforced concrete (M15) using 20 mm Graded metal aggregate , mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH
1.66
4754
7874
... More
Construction of Compound Wall to Hindu Burrial Ground in Ward No.3.;Plain Cement concrete (1:4:8) using 40 mm HBG metal with concrete mixture, Includingg cost and conveyance of all material and all labour charges etc. All work upto plinth leve
5.44
3904
21239
... More
Construction of Compound Wall to Hindu Burrial Ground in Ward No.3.;Dust Filling of foundation trenches as per drawing and technical specification of MORTH
2.29
1065
2441
... More
Construction of Compound Wall to Hindu Burrial Ground in Ward No.3.;Sand filling in Basement with cost of stone dust including watering and ramming as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH
2.74
1061
2904
... More
Construction of Compound Wall to Hindu Burrial Ground in Ward No.3.;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH
33.04
204
6749
... More
Construction of Compound Wall to Hindu Burrial Ground in Ward No.3.;Under-reaming for Bored cast-in-situ R.C.C. Piles for building foundations in loamy, clayey soils like Black cotton soils and ordinary soils with Augoring and boring equipment in site as per IS 2911 as per approved designs including all operations, incidental, labour charges, hire charges of machinery, augur bore drill and shell equipment, etc, complete for all depths and for finished item of work for piles of following diametres.
57
333
18997
... More
Construction of Compound Wall to Hindu Burrial Ground in Ward No.3.;Engaging of 110 Chain Mounted Proclainer on hire basis as directed by the departmental authorities
20
1200
24000