To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Municipality Tender

Civil And Construction
Excavation
Opening Date29 Jun 2022
Closing Date13 Jul 2022
Tender Amount₹ 6,30,34,760 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

90.87

-

331.16

... More
Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 20mm size hard , machine crushed trap from approved quarry including cost and conveyance of all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402) ( (BLD-CSTN-3-5))

12.34

-

3978.18

... More
Pre construction Anti termite is a process in which chemical toxic to subterrean termites is apply/ inject into soil during early stage of building Construction 2. Treatement of soil Beneath the building and around the foundations conduct and chemical use as per BIS - IS 6313 (Part -2) 2013 code specification & CIB RC registered termiticide which creates a continuous chemical barrier beneath the building which kills or repels terminates & impervious to tremite entry 3. Imidacloprid 30.5% SC (IS 63131) dissolve 2.1 Ml/1 liter of water and apply emulsion/solution @ 7.5 Litres/Square meter (Sqm) of internal, external vertical surface of the colums , plinth beams (Back filling) walls and floor junction, external perimeters, along reatining wall @ 5.0 Liters/Sqm of the horizontal surface of basement top surface of the basement filling below flooring bed (Plinth) & @ 2.0 Litres/ Line meter at expansion joints. The substructure of a depth of 500mm around coulmns & 300mm deep around plinth beams, basements & floor filling area including excavation channel along the wall & rodding etc. cost & Conveyance of all materials to the site, cost of labour for sparying, rodding etc. complete for furnished item of work as per the approval of the Engineer-in-charge.

352.5

-

170.42

... More
Supply and placing of the Design Mix Concrete M20 (350kg Cement) corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. (BLD-CSTN-3-14) FOOTINGS

5.16

-

8646.77

... More
PLINTH BEAMS

6.3

-

11222.28

... More
COLUMNS

3.45

-

11666.35

... More
ROOF BEAMS

4.76

-

10908.92

... More
LINTEL BEAMS

0.86

-

12323.31

... More
SLAB

9.54

-

9742.48

... More
Supplying, fitting and placing Fe - 500 HYSD bar reinforcement complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage,where they are not welded including cost and conveyance of steel, binding wire etc., lifting charges of steel , placing in position, tying with binding wire, all tools etc., and overheads & contractors profit complete for finished item of work( APSS No.126 )

3313.94

-

87.93

... More
Damp proof course 50mm thick with 1:2:4 cement concrete Nominal mix, using 12mm hard broken stone aggregate including cost of all materials, seigniorage charges, excluding conveyance charges of materials including the cost of machinery, labour charges, mixing, placing in position, leveling, vibrating, curing etc. complete for finished item of work. (Using concrete mixer)

13.2

-

200.35

... More
CR stone masonry in 2nd sort in CM (1:6) prop: (cement : sand) using hard granite stones from approved quarry including cost and conveyance of all materials like cement, sand water, granite stones, etc., from approved quarry to site and including labour for cutting stones to required size and shape, mixing of cement, mortar, construction, scaffolding charges, curing etc., and overheads & contractors profit, complete for finished item of work in foundation & basement. (APSS No. 615 & 601)

7.92

-

4355

... More
Supply & construction of Brick Masonry in CM (1:6) with 2nd class Bricks traditional size 23x11x7 2nd class with compressive of 37 Kgs / Sqcm from approved source including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504). (BLD-CSTN-5-4)

33.08

-

5981.12

... More
Plastering 12mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904)

227.15

-

345.33

... More
Plastering 20mm thick in two coats using screened sand with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc.,complete for External uneven surfaces of Brick wall and RCC exposed surface and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) for :- Plastering 2/c in CM(1:4) & (1:6) 20mm

163.9

-

468.79

... More
Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903).

72

-

493.79

... More
Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick including neat cement slurry of honey like consistancy spread at the rate of 3.3kg per Sqm and filling the joints with white cement mixed with pigment of matching shade to match the shade of tiles over a bed of C.C. or R.C.C. slab, including cost and conveyance of all materials like cement, sand, water, ceramic tiles, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer-in-charge curing etc., complete and cost of overheads and contractor profit for finished item of work. (APSS No.707 & 701)

5.28

-

943.15

... More
Dadooing to walls withglazed red or white full body ceramic wall tiles of Size 300 x 450 mm / 320 mm x 400 mm and thickness 6 mm and 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of C.M (1:5) proportion, 12mm thick and neat grey cement slurry of honey like consistency, spread at the rate of 3.3Kgs per Sqm and jointed with white cement or coloured cement to match the shade of the tiles, including cost and conveyance of all materials like cement, sand, water, tiles, coloured cement, overheads & contractors profit etc., to site, all labour charges for mixing of cement mortar, laying glazed tiles to level, curing etc., complete for finished item of work as directed by Engineer-in-charge.

15.36

-

663.99

... More
Flooring with vitrified polished/Semi-polished floor tiles of 1st quality and make as approved by Engineer-in-charge of size not less than 600 mm x 600 mm , 8-10 mm thickness of any color finish and all shades and designs with borders and design as per the approved flooring pattern as directed by the Engineer-In -Charge set over a base coat of CM (1:8) prop. 12mm thick using screened sand over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 Kgs per Sqm. and jointed neately with white cement paste to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, white cement etc., to site (excluding cost of C.C. bed) and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge etc.,and overheads & contractors profit complete for finished item of work. (APSS No.701 & 707)

49.19

-

1238.39

... More
Providing skirting to internal walls to 15 cm height with vitrified tiles 8mm thick , regular finish and normal colour, length equal to flooring tiles, set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 Kgs per Sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc.,and overheads & contractors profit complete excluding seigniorage charges etc., complete for finished item of work.(APSS No.701 &707)

9

-

1240.88

... More
Supply and fabricating steel works like Window Grills, Compound Wall Grills, Iron Doors, Windows including cost of welding rods, power charges, including cost of fixing in position including all cost and conveyance of materials and all labour charges for cutting, bending to required shape welding including cost of weilding rods griding etc complete with all taxes etc., complete for finished item of work as per the approval of the Engineer-in-Charge.

150

-

106.35

... More
Painting with Priming Coat to given an even shade after throughly brushing the surface to remove all dirt and remains of losse powdered materials, including cost and conveyance of all materials to work site and all operational incidental labour charges etc., complete for finished item of work as per SS

9.72

-

59.31

... More
Painting with Synthetic Enamel paints -one coat - for New wood work, old wood work & New Iron work to given an even shade after throughly brushing the surface to remove all dirt and remains of losse powdered materials, including cost and conveyance of all materials to work site and all operational incidental labour charges etc., complete for finished item of work as per SS

9.72

-

63.18

... More
Supplying and fixing FOLDABLE SHUTTER DOOR using Medium Teak wood Door Frame section of 125*75 MM is fixed to wall using MS Z Hold fast 300 MM long. including Door top arch with tinted glass of 5MM thickness , Medium Teak wood door shutters - 35 mmthick as per drawing including cost of Brass fixtures such as 12 Nos. Butt hinges 125mm long, 4 No tower bolt of 200x10mm dia, 1 No. Aldrops - 300 mm long, 1No. Latche-300mm long, 6 Nos. handles of 150 mm size & 1 Nos. Heavy duty door stoppers including fixing the fixtures to door with required no. of screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc., complete for finished item of work. (Door size 1.5 X 2.7m)

6.3

-

14266.49

... More
Supply & applying Melamine Polish Glossy/ Matt finish to the wood works duly cleaning the surface and applying emery paper, Sand the wood with 180 No., emery paper and then with 320 No., emery paper, clean & wipe off loose dust, applying suitable knifing paste filler / wood filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper, apply two component wood sealer, air dry for 24 hrs, Sand with 320 No emery paper, applying one coat of approved spraying thinner (for spraying)/ applying one coat of approved brushing thinner or general purpose thinner (for brushing) and apply (either with spray or brush) two coats of approved brand melamine including cost & labour charges, emery papers, cost of thinner & melamine polish of approved brands such as Jenson & Nicholson, Asian Paints, Berger Paints or equivalent etc., complete for finished item of work

12.6

-

1257.51

... More
Providing and fixing factory made uPVC white colour sliding glazed doorcomprising of uPVC multi-chambered frame with in-built roller track andsash extruded profiles duly reinforced with 1.60 ± 0.2 mm thick galvanizedmild steel section made from roll forming process of required length (shape & size according to uPVC profile), appropriate dimension uPVCextruded glazing beads, uPVC extruded interlock and uPVC extrudedInline sash adaptor (if required), EPDM gasket, wool pile, zinc alloy(white powder coated) handle with key on one side of extreme panels along with zinc plated mild steel multi point locking having transmissiongear with keeps, zinc alloy (white powder coated) cresent lock (ifrequired), stainless steel (SS 304 grade) body with adjustable doublenylon rollers (weight bearing capacity to be 120 kg), G.I fasteners 100 x 8 mm size for fixing frame to finished wall and necessary stainless steelscrews etc. Profile of frame & sash shall be mitred cut and fusion weldedat all corners, including drilling of holes for fixing hardware's and drainageof water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled with weather proof silicon sealent over backerrod of required size and of approved quality, all complete as per approveddrawing & direction of Engineerin-Charge inclusive of cost of Single / double glass panes,wire mesh and silicon sealent . Note: For uPVC frame and sash extruded profiles minus 5% tolerancein dimension i.e. in depth & width of profile shall be acceptable. Variationin profile dimension in higher side shall be accepted but no extra payment on this account shall be made. BMT-N.85 Three track three panels sliding door with fly proof S.S wire mesh (Two Nos. glazed & one no. wire mesh panels) made of(big series) frame 116 x 45 mm & sash 46 x 82 mm both having wall thickness of 2.3 ± 0.2 mm and single glazing bead / double glazing bead of appropriate dimension. (Area of door above 2.00 Sqm upto 5.00 Sqm)

9

-

7948.51

... More
Providing & fixing internal prelaminated PVC door frame of size 100 x 45 mm with a wall thickness of 5mm, made of extruded 5 mm Prelam PVC foam sheet, mitred cut at two corners and joined with two Nos. of 150mm long brackets of 15 x 15 mm MS square tube, two vertical door profiles reinforced with 40 x 20 MS Tube of 19 guage throughout the frame and the door frame fixed to the wall using 65/100mm long MS screws through the frame by using PVC fasteners with a minimum of 3 Nos of screws provided for each vertical member and two Nos. for horizontal, etc complete as per drawing and direction of Engineer in Charge

18.6

-

624.88

... More
Providing and fixing 35mm thick BRAND FACTORY MADE SOLID SINGLE SIDE PRELAM PANEL PVC DOOR SHUTTER consisting of frame made out of MS. Tubes of 19gauge thickness and size of 19mmX19mm for stiles, and 15mmX15mm for top and bottom rails. The MS. Frame shall have a coat of steel primers of approved make and manufacture. MS. Frame covered with 5mm thick heat moulded single side Prelam Pac ‘C’ channel of size 30mmX50mm to form stiles.5mm thick& 75mm wide single side prelim Pac sheets shall be for the top, bottom and lock rails. Panelling of 5mm thick one side Pac sheet to be fitted in the MS. Frame and sealed to the front (prelam side) stiles and rails (which should have a 5mm 45 bent portion as beading) and attached to the back(white/ivory) stiles and rails which should have a 10mm 900 bent portion as beading ) using 2Nos. 15mm wide X 5mm thick Pac sheet beading inside the 90 bent beading. All stiles, rails and beadings are to be joined to the panel using solvent cement etc. an additional 5mm thick Pac strip of 20mm width to be stuck on the interior side of the ‘C” channel using Pac solvent cement adhesive and 10mm(5mmX2) thick, 20mm wide cross Pac sheet to be fitted as gap insert for top and bottom rail etc. complete as per direction of Engineer –in-Charge, manufacture specification and drawing.

4.73

-

1598.24

... More
Providing and applying synthetic plaster putty or plaster of paris putty or lime punning of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for Internal walls

227.15

-

200.02

... More
Supply and installation of Best tiled roofing with mangalore tiles (rustic green color)inlcuding CM.

4.48

-

2216.3

... More
Painting to new walls with 2 coats of acrylic emulsion paint of approved brand (Asian/Berger/Nerolac/Saicoat/Indocem or equivalent) and shade over base coat of approved cement primer grade-1 making 3 coats in all to give even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges , overheads & contractors profit etc., complete for finished item of work as per SS 911 Internal colouring

227.15

-

151.22

... More
Painting to new walls with 2 coats of Acrylic emulsion paint of approved brand (Asian/Berger/Nerolac/Saicoat/Indocem or equivalent) and shade over base coat of approved cement primer grade-1 making 3 coats in all to give even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges , overheads & contractors profit etc., complete for finished item of work as per SS 911 External colouring

163.9

-

162.32

... More
Plastering 25mm to 40mm thick base plastering 12mm to 20 mm in CM (1:3) and top finishing 12mm thick with CM (1:2) to bring the required ornamentation including fine rendering with neat cement cost and conveyanceof all materials, labour charges, all incidental and operational charges curing, lifting, scafolding charges etc. for external surface as per approved drawings and as directed during execution including preparation and fixing precast pillars, kudam,palakai, vedika. Lathalu in Uttara Eludhakam, pothikas, nasigudu. pupha puskala adihishtanam, wherever necessary and including overheads and contractors profit, excluding GST on all materials etc.Complete for finished item of work(as per silpi SSR 19-20) (1st class ornamentation work

10.44

-

1237.6

... More
Providing and fixing of top hung Ventilators made of pre-painted steel (Base steel as per IS 513 of 0.80 mm thick galvanized as per IS 277 with Zinc of 120 GSM), finish painted with a polyester paint of 60-65 microns thick and section for outer frame of 80 x 45 mm, centre mullion of 80 x 60 mm, section for shutter of 52 x 25 mm x 0.6 mm thick, outer frame and mullions to have rebate for glazed shutter with a provision for guard bars/grills and the sections cut to length metre joined with corner bracket, centre mullion fixed with mullion cap, 1 No. of High grade nylon latch handle, window stopper, 2 Nos. of with MS Powder coated /SS ball bearing butt Hinges provided per shutter and windows fitted with 4 mm thick plain float glass with rubber gaskets including fixing the frames in concrete/masonry wall by means of self expanding screws, Including 10 mm Square guard bars with 6” (152.4mm) pitch etc., complete for finished item of work.

0.9

-

6305.63

... More
Supply and Fixing of 25mm outer dia heavy (2.20mm thickness) grade, FRLS with IS:9537 part 3 regid PVC pipe (ISI mark) concealed in wall with all required accessories including masonary work for light, fan , common and separate plug point including all labour charges etc., complete. Makes : Sudhakar / Modi ( ISI mark).

200

-

86.82

... More
Supply and fixing of 6A / 10A 3/2 Pin 2 Module Modular Socket with shutter with 6A / 10A 1 Way 1 Module Modular Switch control on a Common switch board with with 3 Module Hot Dip Galvanized Modular Metal Box covered with 3 Modular Cover Frame with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Modular Switch, Socket, Metal box & Cover frame Make:GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge.

16

-

472.69

... More
Supply and Fixing of 20A 2 Module Modular Socket with shutter and 16A / 20A 1 Way 1 Module Modular Switch duly recessed in wall with 3 Module Hot Dip Galvanized Modular Metal Box size covered with 3 Modular Cover Frame including earth connections and all labour charges etc., complete.[ Power plug ] Modular Switch,socket,metal box & Cover frame Make:GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge.

6

-

655.5

... More
Supply and run of 2 of 36/0.3mm (2.5 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for mains inlcuding all labour charges etc., complete. Makes: Polycab /RPG / Million / Power Flex / Anchor / V-Guard.

240

-

74.59

... More
Supply and run of 2 of 140/0.3mm (10.0 Sqmm) PVC FRLS / HFFR insulated flexible Copper cable in existing pipe for mains including all labour charges etc., complete. Makes: :Polycab /RPG / Million / Power Flex / Anchor / V-Guard.

100

-

230.05

... More
Fixing of 20W/18W led tube light luminaire on wall / Ceiling with / TW /PVC round blocks with all accessories including giving connections and all labour charges etc., complete.

16

-

147.59

... More
Supply and transportation of 20W, 2000 lumins, 1200mm length, T8 LED tube light fitting with extruded alluminium housing, input voltage AC 165 - 260 Volts with 0.9 PF with driver and frosted cover etc., complete with 3 years warranty. Luminaire Make : Phillips / Osram / GE / Crompton /VIN / Bajaj / Havells / Halonix.

16

-

792

... More
Supply and fixing of 18W heavy duty LED Down lighter, suitable for Recessed / Surface mounting made of pressure diecast alluminium body with powder coating, acrylic diffuser with Driver as per IS: 15885 (Part 2/ Sec 13) : 2012 , operating voltage range of 150 to 265 Volts AC, P.F 0.9, Surge protection: 2KV, THD10% with high power LED's having efficacy of 80 lumins / watt, CCT: 3000K -5700K, minimum CRI 70, Luminaire performance complies to IS 10322 (Part 5 / Sec-3) etc., completea) LUMINAIRE MAKE : Pasolite / Cosmo / Siger/ Koncept/ Kiran/Vibrant/Leo/Lumens/Iliteb) LED MAKE : CREE / NICHIA / OSRAM / SAMSUNG / EVERLIGHT

2

-

1449

... More
Supply of 12" (300mm) Light duty exhaust fan with wire guard etc complete etc., complete. Makes : Crompton / Bajaj Bahar WG / Havells Ventil Air-DB / Orient hill air.

3

-

1668

... More
Labour charges for fixing of Exhaust fan in wall with necessary connections etc., complete ( for hole already made available).

3

-

396.68

... More
Supply and fixing of 4 Way VTPN DB suitable for accomodating 125A 4 Pole MCCB as incomer and 63A,10KA, TP MCBs-4 Nos as outgoing and with IP 43 Protection including internal connection and labour charges for surface / flush mounting etc., complete. Incommer: 125A,4P,25KA MCCB-1No. Outgoing: 63A, 10KA , TP MCB's -4 Nos DB Makes : Legrand / Schneider. MCCB Make: L&T / Schneider / Siemens / Legrand. MCB Make: Legrand-DX3 / Schneider-Acti9.

1

-

23401

... More
Supply of 48" (1200mm) Sweep decorative Ceiling Fan, with double ball bearings with all accessories without Regulator. Makes: Crompton HS Decora / Bajaj Regal Star / Havells Spark deco / Orient summer crown /Halonix(Zephyr) /Polycab(India Glory) /G.M. (G-Storm)

4

-

2645

... More
Labour charges for Fixing of Ceiling fan and regulator including transportation and giving connections with twin core wire etc., complete.

4

-

167.81

... More
Supply and fixing of 7W LED COB Spot Light, suitable for Recessed mounting made of diecast alluminium body with powder coating, with Driver, operating voltage range of 150 to 265 Volts AC, CCT: 3000K - 5700K, minimum CRI70, .etc., complete Makes : Surya /C&S / Syska / Enrich / Stanjo / Polycab/ Ib LED/ Opple/R LED/Luker/ Orbit/Trinic/Panasonic b) LED MAKE : Bridge Lux / LUMILEDS / CREE / NICHIA / SAMSUNG/ Sunpo

6

-

920

... More
Supply of 1 Module Modular type Electronic step type Fan Regulator with 2 Module Hot Dip Galvanized Modular Metal Box covered with 2 modular cover frame etc., complete.Makes : GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge.

4

-

624

... More
Providing independent earthing by excavating a trench to a depth of 2.1 M in all soils, as per size specified in the Data, using 40mm dia 'B' class GI pipe of 2.5 Mtrs length with necessary accessories with hume pipe ring duly providing staggered holes including filling with equal proportion of Salt and Charcoal in layers and all labour charges etc., complete for small quarters.

1

-

3821.56

... More
Earth work excavation for foundations (Manual Means) of buildings in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work including seigniorage excluding dewatering charges etc., as per SS 20 B(APSS 308)

28.08

-

238.32

... More
Conveyance of un-useful excavated earth to a distance of 2 KM for disposal including hire charges of T & P, labour charges etc., and overheads & contractors profit complete for finished item of work.

14.04

-

38.29

... More
Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

55.48

-

331.16

... More
Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 20mm size hard , machine crushed trap from approved quarry including cost and conveyance of all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402) ( (BLD-CSTN-3-5))

7.96

-

3978.18

... More
Providing Antitermite treatment as per IS 6315 (Part-2) 2001 (pre - constructional chemical treatment measures) along the internal and external verticalfaces of the columns plinth beams , basements and top surface of the basement filling below flooring bed as per the specified procedure confirming to IS 6315 (Part -2) 2001 and other relavent approved specification duly using Chlorpyriphos/lindane emulsifiable concentrate 20% with 1% concentration at 7.5 ltrs/Sqm of the vertical surface and at 5 ltrs / Sqm pf the horizontal surface of the sub structure to a depth of 500mm areound columns and 300mm deep around plinth beams basements & floorfilling area including excabvation channel along the wall and rodding etc., and cost and conveyence of all materials to the site cost of labour for spraying rodding etc., complete for finshed item of work as per approval of Engineer In Charge

115.82

-

170.42

... More
Supply and placing of the Design Mix Concrete M20 (350kg Cement) corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. (BLD-CSTN-3-14) FOOTINGS

3.46

-

8646.77

... More
PLINTH BEAMS

2.56

-

11222.28

... More
COLUMNS

2.32

-

11666.35

... More
ROOF BEAMS

2.56

-

10908.92

... More
SLAB

8.87

-

9742.48

... More
Supplying, fitting and placing Fe - 500 HYSD bar reinforcement complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage,where they are not welded including cost and conveyance of steel, binding wire etc., lifting charges of steel , placing in position, tying with binding wire, all tools etc., and overheads & contractors profit complete for finished item of wor( APSS No.126 )

1945.32

-

87.93

... More
Damp proof course 50mm thick with 1:2:4 cement concrete Nominal mix, using 12mm hard broken stone aggregate including cost of all materials, seigniorage charges, excluding conveyance charges of materials including the cost of machinery, labour charges, mixing, placing in position, leveling, vibrating, curing etc. complete for finished item of work. (Using concrete mixer)

11.7

-

200.35

... More
CR stone masonry in 2nd sort in CM (1:6) prop: (cement : sand) using hard granite stones from approved quarry including cost and conveyance of all materials like cement, sand water, granite stones, etc., from approved quarry to site and including labour for cutting stones to required size and shape, mixing of cement, mortar, construction, scaffolding charges, curing etc., and overheads & contractors profit, complete for finished item of work in foundation & basement. (APSS No. 615 & 601)

7.02

-

4355

... More
Supply & construction of Brick Masonry in CM (1:6) with 2nd class Bricks traditional size 23x11x7 2nd class with compressive of 37 Kgs / Sqcm from approved source including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504). (BLD-CSTN-5-4)

7.16

-

5981.12

... More
Plastering 12mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904)

26.31

-

345.33

... More
Plastering 20mm thick in two coats using screened sand with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc.,complete for External uneven surfaces of Brick wall and RCC exposed surface and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) for :- Plastering 2/c in CM(1:4) & (1:6) 20mm

26.31

-

468.79

... More
Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903).

59.13

-

493.79

... More
Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick including neat cement slurry of honey like consistancy spread at the rate of 3.3kg per Sqm and filling the joints with white cement mixed with pigment of matching shade to match the shade of tiles over a bed of C.C. or R.C.C. slab, including cost and conveyance of all materials like cement, sand, water, ceramic tiles, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer-in-charge curing etc., complete and cost of overheads and contractor profit for finished item of work. (APSS No.707 & 701)

27.6

-

943.15

... More
Dadooing to walls withglazed red or white full body ceramic wall tiles of Size 300 x 450 mm / 320 mm x 400 mm and thickness 6 mm and 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of C.M (1:5) proportion, 12mm thick and neat grey cement slurry of honey like consistency, spread at the rate of 3.3Kgs per Sqm and jointed with white cement or coloured cement to match the shade of the tiles, including cost and conveyance of all materials like cement, sand, water, tiles, coloured cement, overheads & contractors profit etc., to site, all labour charges for mixing of cement mortar, laying glazed tiles to level, curing etc., complete for finished item of work as directed by Engineer-in-charge.

9.2

-

663.99

... More
Painting to new walls with 2 coats of acrylic emulsion paint of approved brand (Asian/Berger/Nerolac/Saicoat/Indocem or equivalent) and shade over base coat of approved cement primer grade-1 making 3 coats in all to give even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges , overheads & contractors profit etc., complete for finished item of work as per SS 911 Internal colouring

131.8

-

151.22

... More
Painting to new walls with 2 coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 50 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Exterior Grade- 2 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls for:-External Colouring - Plastic emulsion paint - 3 Coats.

26.31

-

162.32

... More
supply and fixing of 6mm thk HPL inlcuding cost and conveyance of all materials to work site and fixing ccharges, overheads and constractor profits etc

5.2

-

7200

... More
Flooring with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) of regular colours (other than black) set over a base coat of CM (1:8) prop. 20mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 Kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement, sand, water, granite, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying granite to required slope as directed by the Engineer- in-charge, cost of overheads & contractors profit etc., complete for finished item of work . (APSS No.701 & 707)

10.2

-

3703.82

... More
supply and fixing of clay jali 200x200x75mm with special adhesive and metal paste line for clean and neat look as per the direction of engineer in charge

18.75

-

3285

... More
Filling with SAND in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

8.28

-

597.3

... More
Supply and installation of Best tiled roofing with mangalore tiles (rustic green color)inlcuding CM.

150

-

2216.3

... More
Supplying and fixing NP bib taps of size 12.70mm dia of Indian make Seiko or equivalent including cost and conveyance of all materials, labour charges etc., complete for finished item of work in all floors.

2

-

682.01

... More
Supplying & fixing Ashirvad/Astral flow guard for equivalent CPVC Pipes with fittings in ground or on wall including cost of tees, elbows, bends, reducers, couplings, running joints, union flanges, unions etc. with necessary excavation in all types of soils except rock requiring blasting, refilling, chiselling masonry walls and making good the walls & floors to the original surface and fixing MS clamps on TW blocks on walls including cost and conveyance of all materials and labour charges complete for finished item of work. complete 22.20 mm dia CPVC SDR 11.00

10

-

110.21

... More
54 mm dia CPVC SDR 11.00

20

-

574.89

... More
Supplying and fixing PPR Ball valve as per ISI Class - I , Indian make heavy type including cost and conveyance of all materials , labour charges etc. complete for finished item of work

2

-

244.27

... More
s&f 3" (76.2 mm ) Nahany Trap with Jali - UPVC/SWR Pipe fittings

2

-

135.2

... More
S&F 75 mm dia 1828.8 mm (6'-0") Single Socket PVC/SWR pipe- 6 Kg/sq.cm

10

-

373.79

... More
Constructing 904.0 mm (3’0”) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mmincluding plastering with cement mortar 1:3 prop; ½” thick both inside and outside fitted with 20” dia RCC manhole covers and frames including excavating pits up to a depth of 1524 mm (5'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification andincluding cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental andoperational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work as per Standard specification.

1

-

10262.84

... More
Supplying & fixing 150 mm x 100 mm SWG gully trap conforming to ISI 651 & 4127 with C.I Grating & Cost. Brick masonry in CM 1:6 prop. Intermediate chamber and fitted with304.8 mm x 288.6mm (12"x9") C.I Frame and hinged cover

1

-

577.16

... More
Supply of SWG Plugs conforming to IS standards for 150 mm dia

2

-

62.49

... More
Labour charges for fixing and laying the SWG Junctions/ Plugs/ Bends of any dia with airtight cement joints as per standard practice

2

-

36.36

... More
Manufacture, Supply and Delivery of R.C.C. Plain ended pipes conforming to B.I.S 458/2003,Ex -factory, excluding transportation and all taxes. (NP-2 Class - 150mm dia ).

5

-

214.73

... More
Lowering the RCC plain ended pipes carefully into the trench laying them true to alignment and gradient, jointing RCC pipes with cement joints including curing, the cost of jointing materials i.e., Cement Mortar (1:1.5), hemp yarn etc., and testing including filling with water with a water lead up to 500 Meters excluding cost of rubber rings as per BIS No.783/85.

5

-

163.61

... More
Supply and Fixing of 25mm outer dia heavy (2.20mm thickness) grade, FRLS with IS:9537 part 3 regid PVC pipe (ISI mark) concealed in wall with all required accessories including masonary work for light, fan , common and separate plug point including all labour charges etc., complete. Makes : Sudhakar / Modi ( ISI mark).

25

-

472.69

... More
Supply and run of 2 of 36/0.3mm (2.5 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for mains inlcuding all labour charges etc., complete. Makes: Polycab /RPG / Million / Power Flex / Anchor / V-Guard.

25

-

74.59

... More
Supply and run of 2 of 140/0.3mm (10.0 Sqmm) PVC FRLS / HFFR insulated flexible Copper cable in existing pipe for mains including all labour charges etc., complete. Makes: :Polycab /RPG / Million / Power Flex / Anchor / V-Guard.

30

-

230.05

... More
Supply and fixing of 18W heavy duty LED Down lighter, suitable for Recessed / Surface mounting made of pressure diecast alluminium body with powder coating, acrylic diffuser with Driver as per IS: 15885 (Part 2/ Sec 13) : 2012 , operating voltage range of 150 to 265 Volts AC, P.F 0.9, Surge protection: 2KV, THD10% with high power LED's having efficacy of 80 lumins / watt, CCT: 3000K -5700K, minimum CRI 70, Luminaire performance complies to IS 10322 (Part 5 / Sec-3) etc., completea) LUMINAIRE MAKE : Pasolite / Cosmo / Siger/ Koncept/ Kiran/Vibrant/Leo/Lumens/Iliteb) LED MAKE : CREE / NICHIA / OSRAM / SAMSUNG / EVERLIGHT

4

-

1449

... More
Supply and fixing of 6A / 10A 3/2 Pin 2 Module Modular Socket with shutter with 6A / 10A 1 Way 1 Module Modular Switch control on a Common switch board with with 3 Module Hot Dip Galvanized Modular Metal Box covered with 3 Modular Cover Frame with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Modular Switch, Socket, Metal box & Cover frame Make:GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge.

2

-

472.69

... More
Supply and fixing of 7W LED COB Spot Light, suitable for Recessed mounting made of diecast alluminium body with powder coating, with Driver, operating voltage range of 150 to 265 Volts AC, CCT: 3000K - 5700K, minimum CRI70, .etc., complete Makes : Surya /C&S / Syska / Enrich / Stanjo / Polycab/ Ib LED/ Opple/R LED/Luker/ Orbit/Trinic/Panasonic b) LED MAKE : Bridge Lux / LUMILEDS / CREE / NICHIA / SAMSUNG/ Sunpo

10

-

920

... More
Supply and fixing of 4 Way VTPN DB suitable for accomodating 125A 4 Pole MCCB as incomer and 63A,10KA, TP MCBs-4 Nos as outgoing and with IP 43 Protection including internal connection and labour charges for surface / flush mounting etc., complete. Incommer: 125A,4P,25KA MCCB-1No. Outgoing: 63A, 10KA , TP MCB's -4 Nos DB Makes : Legrand / Schneider. MCCB Make: L&T / Schneider / Siemens / Legrand. MCB Make: Legrand-DX3 / Schneider-Acti9.

1

-

23401

... More
Earth work excavation for foundations (Manual Means) of buildings in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work including seigniorage excluding dewatering charges etc., as per SS 20 B(APSS 308)

42.42

-

238.32

... More
Conveyance of un-useful excavated earth to a distance of 2 KM for disposal including hire charges of T & P, labour charges etc., and overheads & contractors profit complete for finished item of work.

21.21

-

38.29

... More
Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

49.75

-

331.16

... More
Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 20mm size hard , machine crushed trap from approved quarry including cost and conveyance of all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402) ( (BLD-CSTN-3-5))

8.46

-

3978.18

... More
Providing Antitermite treatment as per IS 6315 (Part-2) 2001 (pre - constructional chemical treatment measures) along the internal and external verticalfaces of the columns plinth beams , basements and top surface of the basement filling below flooring bed as per the specified procedure confirming to IS 6315 (Part -2) 2001 and other relavent approved specification duly using Chlorpyriphos/lindane emulsifiable concentrate 20% with 1% concentration at 7.5 ltrs/Sqm of the vertical surface and at 5 ltrs / Sqm pf the horizontal surface of the sub structure to a depth of 500mm areound columns and 300mm deep around plinth beams basements & floorfilling area including excabvation channel along the wall and rodding etc., and cost and conveyence of all materials to the site cost of labour for spraying rodding etc., complete for finshed item of work as per approval of Engineer In Charge

132.25

-

170.42

... More
Supply and placing of the Design Mix Concrete M20 (350kg Cement) corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. (BLD-CSTN-3-14) FOOTINGS

5.4

-

8646.77

... More
PLINTH BEAMS

2.55

-

11222.28

... More
COLUMNS

2.9

-

11666.35

... More
ROOF BEAMS

2.55

-

10908.92

... More
SLAB

7.25

-

9742.48

... More
Supplying, fitting and placing Fe - 500 HYSD bar reinforcement complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage,where they are not welded including cost and conveyance of steel, binding wire etc., lifting charges of steel , placing in position, tying with binding wire, all tools etc., and overheads & contractors profit complete for finished item of work( APSS No.126 )

2155.63

-

87.93

... More
Damp proof course 50mm thick with 1:2:4 cement concrete Nominal mix, using 12mm hard broken stone aggregate including cost of all materials, seigniorage charges, excluding conveyance charges of materials including the cost of machinery, labour charges, mixing, placing in position, leveling, vibrating, curing etc. complete for finished item of work. (Using concrete mixer)

11.1

-

200.35

... More
CR stone masonry in 2nd sort in CM (1:6) prop: (cement : sand) using hard granite stones from approved quarry including cost and conveyance of all materials like cement, sand water, granite stones, etc., from approved quarry to site and including labour for cutting stones to required size and shape, mixing of cement, mortar, construction, scaffolding charges, curing etc., and overheads & contractors profit, complete for finished item of work in foundation & basement. (APSS No. 615 & 601)

6.66

-

4355

... More
Supply & construction of Brick Masonry in CM (1:6) with 2nd class Bricks traditional size 23x11x7 2nd class with compressive of 37 Kgs / Sqcm from approved source including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504). (BLD-CSTN-5-4)

10.85

-

5981.12

... More
Plastering 12mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904)

70.68

-

345.33

... More
Plastering 20mm thick in two coats using screened sand with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc.,complete for External uneven surfaces of Brick wall and RCC exposed surface and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) for :- Plastering 2/c in CM(1:4) & (1:6) 20mm

70.68

-

468.79

... More
Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903).

59.75

-

493.79

... More
Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick including neat cement slurry of honey like consistancy spread at the rate of 3.3kg per Sqm and filling the joints with white cement mixed with pigment of matching shade to match the shade of tiles over a bed of C.C. or R.C.C. slab, including cost and conveyance of all materials like cement, sand, water, ceramic tiles, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer-in-charge curing etc., complete and cost of overheads and contractor profit for finished item of work. (APSS No.707 & 701)

53.6

-

943.15

... More
Dadooing to walls withglazed red or white full body ceramic wall tiles of Size 300 x 450 mm / 320 mm x 400 mm and thickness 6 mm and 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of C.M (1:5) proportion, 12mm thick and neat grey cement slurry of honey like consistency, spread at the rate of 3.3Kgs per Sqm and jointed with white cement or coloured cement to match the shade of the tiles, including cost and conveyance of all materials like cement, sand, water, tiles, coloured cement, overheads & contractors profit etc., to site, all labour charges for mixing of cement mortar, laying glazed tiles to level, curing etc., complete for finished item of work as directed by Engineer-in-charge.

108.72

-

663.99

... More
Painting to new walls with 2 coats of acrylic emulsion paint of approved brand (Asian/Berger/Nerolac/Saicoat/Indocem or equivalent) and shade over base coat of approved cement primer grade-1 making 3 coats in all to give even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges , overheads & contractors profit etc., complete for finished item of work as per SS 911 Internal colouring

91.43

-

151.22

... More
Painting to new walls with 2 coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 50 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Exterior Grade- 2 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls for:-External Colouring - Plastic emulsion paint - 3 Coats.

70.68

-

162.32

... More
Flooring with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) of regular colours (other than black) set over a base coat of CM (1:8) prop. 20mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 Kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement, sand, water, granite, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying granite to required slope as directed by the Engineer- in-charge, cost of overheads & contractors profit etc., complete for finished item of work . (APSS No.701 & 707)

18.15

-

3703.82

... More
supply and fixing of clay jali 200x200x75mm with special adhesive and metal paste line for clean and neat look as per the direction of engineer in charge

4.2

-

3285

... More
Filling with SAND in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

3.96

-

597.3

... More
Providing & fixing internal prelaminated PVC door frame of size 100 x 45 mm with a wall thickness of 5mm, made of extruded 5 mm Prelam PVC foam sheet, mitred cut at two corners and joined with two Nos. of 150mm long brackets of 15 x 15 mm MS square tube, two vertical door profiles reinforced with 40 x 20 MS Tube of 19 guage throughout the frame and the door frame fixed to the wall using 65/100mm long MS screws through the frame by using PVC fasteners with a minimum of 3 Nos of screws provided for each vertical member and two Nos. for horizontal, etc complete as per drawing and direction of Engineer in Charge

44

-

624.88

... More
Providing and fixing 35mm thick BRAND FACTORY MADE SOLID SINGLE SIDE PRELAM PANEL PVC DOOR SHUTTER consisting of frame made out of MS. Tubes of 19gauge thickness and size of 19mmX19mm for stiles, and 15mmX15mm for top and bottom rails. The MS. Frame shall have a coat of steel primers of approved make and manufacture. MS. Frame covered with 5mm thick heat moulded single side Prelam Pac ‘C’ channel of size 30mmX50mm to form stiles.5mm thick& 75mm wide single side prelim Pac sheets shall be for the top, bottom and lock rails. Panelling of 5mm thick one side Pac sheet to be fitted in the MS. Frame and sealed to the front (prelam side) stiles and rails (which should have a 5mm 45 bent portion as beading) and attached to the back(white/ivory) stiles and rails which should have a 10mm 900 bent portion as beading ) using 2Nos. 15mm wide X 5mm thick Pac sheet beading inside the 90 bent beading. All stiles, rails and beadings are to be joined to the panel using solvent cement etc. an additional 5mm thick Pac strip of 20mm width to be stuck on the interior side of the ‘C” channel using Pac solvent cement adhesive and 10mm(5mmX2) thick, 20mm wide cross Pac sheet to be fitted as gap insert for top and bottom rail etc. complete as per direction of Engineer –in-Charge, manufacture specification and drawing.

16.8

-

1598.24

... More
Providing and applying synthetic plaster putty or plaster of paris putty or lime punning of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for Internal walls

162.11

-

200.02

... More
Providing and fixing of top hung Ventilators made of pre-painted steel (Base steel as per IS 513 of 0.80 mm thick galvanized as per IS 277 with Zinc of 120 GSM), finish painted with a polyester paint of 60-65 microns thick and section for outer frame of 80 x 45 mm, centre mullion of 80 x 60 mm, section for shutter of 52 x 25 mm x 0.6 mm thick, outer frame and mullions to have rebate for glazed shutter with a provision for guard bars/grills and the sections cut to length metre joined with corner bracket, centre mullion fixed with mullion cap, 1 No. of High grade nylon latch handle, window stopper, 2 Nos. of with MS Powder coated /SS ball bearing butt Hinges provided per shutter and windows fitted with 4 mm thick plain float glass with rubber gaskets including fixing the frames in concrete/masonry wall by means of self expanding screws, Including 10 mm Square guard bars with 6” (152.4mm) pitch etc., complete for finished item of work.

3.12

-

6305.63

... More
Supplying and fixing NP bib taps of size 12.70mm dia of Indian make Seiko or equivalent including cost and conveyance of all materials, labour charges etc., complete for finished item of work in all floors.

16

-

682.01

... More
Supplying & fixing Ashirvad/Astral flow guard for equivalent CPVC Pipes with fittings in ground or on wall including cost of tees, elbows, bends, reducers, couplings, running joints, union flanges, unions etc. with necessary excavation in all types of soils except rock requiring blasting, refilling, chiselling masonry walls and making good the walls & floors to the original surface and fixing MS clamps on TW blocks on walls including cost and conveyance of all materials and labour charges complete for finished item of work. complete 22.20 mm dia CPVC SDR 11.00

25

-

110.21

... More
54 mm dia CPVC SDR 11.00

30

-

574.89

... More
Supplying and fixing PPR Ball valve as per ISI Class - I , Indian make heavy type including cost and conveyance of all materials , labour charges etc. complete for finished item of work 25mm PPR Ball valve

2

-

244.27

... More
50mm PPR Ball valve

3

-

613.52

... More
s&f 3" (76.2 mm ) Nahany Trap with Jali - UPVC/SWR Pipe fittings

10

-

135.2

... More
S&F 75 mm dia 1828.8 mm (6'-0") Single Socket PVC/SWR pipe- 6 Kg/sq.cm

25

-

373.79

... More
Constructing 904.0 mm (3’0”) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mmincluding plastering with cement mortar 1:3 prop; ½” thick both inside and outside fitted with 20” dia RCC manhole covers and frames including excavating pits up to a depth of 1524 mm (5'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification andincluding cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental andoperational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work as per Standard specification.

3

-

10262.84

... More
Supplying & fixing 150 mm x 100 mm SWG gully trap conforming to ISI 651 & 4127 with C.I Grating & Cost. Brick masonry in CM 1:6 prop. Intermediate chamber and fitted with304.8 mm x 288.6mm (12"x9") C.I Frame and hinged cover

3

-

577.16

... More
Supply of SWG Plugs conforming to IS standards for 150 mm dia

5

-

62.49

... More
Labour charges for fixing and laying the SWG Junctions/ Plugs/ Bends of any dia with airtight cement joints as per standard practice

5

-

36.36

... More
Manufacture, Supply and Delivery of R.C.C. Plain ended pipes conforming to B.I.S 458/2003,Ex -factory, excluding transportation and all taxes. (NP-2 Class - 150mm dia ).

10

-

214.73

... More
Lowering the RCC plain ended pipes carefully into the trench laying them true to alignment and gradient, jointing RCC pipes with cement joints including curing, the cost of jointing materials i.e., Cement Mortar (1:1.5), hemp yarn etc., and testing including filling with water with a water lead up to 500 Meters excluding cost of rubber rings as per BIS No.783/85.

10

-

163.61

... More
Supply, Installation and commissioning approved make floor mounted close coupled EWC suit CASCADE model 'P' or 'S' trap with dual flush porcelain cistern fixed on EWC with all internal parts of dual flush cistern, ultra solid seat cover of approvedmake with rubber buffer and cap 15 mm angle stop cock 450 mm long PVC inter connection pipe wall flanges all of approved make etc. complete for finished item of work in all respects: Special Colour - Grade - III

2

-

9834.51

... More
Supplying & Fixing Orissa Pan white glazed W.C 1st quality ISI marked conforming to IS:2556-Part-3-1981 with "P" or "S" trap Hindware/ Parryware/ Neycer - ISI Mark: 580 mm x 440 mm including Brick masonry seat for Orissa pan/ Indian W.C. using 2nd class bricks as per standard practice, PVC low level system with internal components & short bend: 10 Litres capacity Single Flush, 15 mm PVC connection with brass union nut C.P coated and 15mm CP finish brass stop valve. Complete for finished item of work. Make:Neycer/Parryware/Jaquar/CERA/Hindustan Sanitaryware

2

-

3589.1

... More
Supplying & Fixing Indian makeFlat Back Wash Hand Basin1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain,32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block: 630 x 450 mm - Double C.P. Pillar cock

4

-

3036.93

... More
Providing & Placing on Terrace(at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets andover flow pipes but without fittings & base support for tanks

1000

-

6.82

... More
Supply and Fixing of 25mm outer dia heavy (2.20mm thickness) grade, FRLS with IS:9537 part 3 regid PVC pipe (ISI mark) concealed in wall with all required accessories including masonary work for light, fan , common and separate plug point including all labour charges etc., complete. Makes : Sudhakar / Modi ( ISI mark).

50

-

472.69

... More
Supply and run of 2 of 36/0.3mm (2.5 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for mains inlcuding all labour charges etc., complete. Makes: Polycab /RPG / Million / Power Flex / Anchor / V-Guard.

50

-

74.59

... More
Supply and run of 2 of 140/0.3mm (10.0 Sqmm) PVC FRLS / HFFR insulated flexible Copper cable in existing pipe for mains including all labour charges etc., complete. Makes: :Polycab /RPG / Million / Power Flex / Anchor / V-Guard.

60

-

230.05

... More
Supply and fixing of 18W heavy duty LED Down lighter, suitable for Recessed / Surface mounting made of pressure diecast alluminium body with powder coating, acrylic diffuser with Driver as per IS: 15885 (Part 2/ Sec 13) : 2012 , operating voltage range of 150 to 265 Volts AC, P.F 0.9, Surge protection: 2KV, THD10% with high power LED's having efficacy of 80 lumins / watt, CCT: 3000K -5700K, minimum CRI 70, Luminaire performance complies to IS 10322 (Part 5 / Sec-3) etc., completea) LUMINAIRE MAKE : Pasolite / Cosmo / Siger/ Koncept/ Kiran/Vibrant/Leo/Lumens/Iliteb) LED MAKE : CREE / NICHIA / OSRAM / SAMSUNG / EVERLIGHT

10

-

1449

... More
Supply and fixing of 6A / 10A 3/2 Pin 2 Module Modular Socket with shutter with 6A / 10A 1 Way 1 Module Modular Switch control on a Common switch board with with 3 Module Hot Dip Galvanized Modular Metal Box covered with 3 Modular Cover Frame with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Modular Switch, Socket, Metal box & Cover frame Make:GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge.

8

-

472.69

... More
Supply and fixing of 7W LED COB Spot Light, suitable for Recessed mounting made of diecast alluminium body with powder coating, with Driver, operating voltage range of 150 to 265 Volts AC, CCT: 3000K - 5700K, minimum CRI70, .etc., complete Makes : Surya /C&S / Syska / Enrich / Stanjo / Polycab/ Ib LED/ Opple/R LED/Luker/ Orbit/Trinic/Panasonic b) LED MAKE : Bridge Lux / LUMILEDS / CREE / NICHIA / SAMSUNG/ Sunpo

2

-

920

... More
Supply and fixing of 4 Way VTPN DB suitable for accomodating 125A 4 Pole MCCB as incomer and 63A,10KA, TP MCBs-4 Nos as outgoing and with IP 43 Protection including internal connection and labour charges for surface / flush mounting etc., complete. Incommer: 125A,4P,25KA MCCB-1No. Outgoing: 63A, 10KA , TP MCB's -4 Nos DB Makes : Legrand / Schneider. MCCB Make: L&T / Schneider / Siemens / Legrand. MCB Make: Legrand-DX3 / Schneider-Acti9.

1

-

23401

... More
Supply of 12" (300mm) Light duty exhaust fan with wire guard etc complete etc., complete. Makes : Crompton / Bajaj Bahar WG / Havells Ventil Air-DB / Orient hill air.

4

-

1668

... More
Labour charges for fixing of Exhaust fan in wall with necessary connections etc., complete ( for hole already made available).

4

-

396.68

... More
Earth work excavation for foundations (Manual Means) of buildings in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work including seigniorage excluding dewatering charges etc., as per SS 20 B(APSS 308)

43.09

-

238.32

... More
Earth work excavation for foundations (Mechnical Means) of buildings in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work including seigniorage excluding dewatering charges etc., as per SS 20 B(APSS 308)

100.55

-

115.36

... More
Conveyance of un-useful excavated earth to a distance of 2 KM for disposal including hire charges of T & P, labour charges etc., and overheads & contractors profit complete for finished item of work.

71.82

-

38.29

... More
Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

330.81

-

331.16

... More
Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 20mm size hard , machine crushed trap from approved quarry including cost and conveyance of all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402) ( (BLD-CSTN-3-5))

31.31

-

3978.18

... More
Pre construction Anti termite is a process in which chemical toxic to subterrean termites is apply/ inject into soil during early stage of building Construction 2. Treatement of soil Beneath the building and around the foundations conduct and chemical use as per BIS - IS 6313 (Part -2) 2013 code specification & CIB RC registered termiticide which creates a continuous chemical barrier beneath the building which kills or repels terminates & impervious to tremite entry 3. Imidacloprid 30.5% SC (IS 63131) dissolve 2.1 Ml/1 liter of water and apply emulsion/solution @ 7.5 Litres/Square meter (Sqm) of internal, external vertical surface of the colums , plinth beams (Back filling) walls and floor junction, external perimeters, along reatining wall @ 5.0 Liters/Sqm of the horizontal surface of basement top surface of the basement filling below flooring bed (Plinth) & @ 2.0 Litres/ Line meter at expansion joints. The substructure of a depth of 500mm around coulmns & 300mm deep around plinth beams, basements & floor filling area including excavation channel along the wall & rodding etc. cost & Conveyance of all materials to the site, cost of labour for sparying, rodding etc. complete for furnished item of work as per the approval of the Engineer-in-charge.

383.64

-

170.42

... More
Supply and placing of the Design Mix Concrete M20 (350kg Cement) corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. (BLD-CSTN-3-14) FOOTINGS

9.99

-

8646.77

... More
PLINTH BEAMS

10.87

-

11222.28

... More
COLUMNS

8.26

-

11666.35

... More
ROOF BEAMS

58.71

-

10908.92

... More
LINTEL BEAMS

1.84

-

12323.31

... More
SLAB

17.75

-

9742.48

... More
Supplying, fitting and placing Fe - 500 HYSD bar reinforcement complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage,where they are not welded including cost and conveyance of steel, binding wire etc., lifting charges of steel , placing in position, tying with binding wire, all tools etc., and overheads & contractors profit complete for finished item of work ( APSS No.126 )

12874.46

-

87.93

... More
Damp proof course 50mm thick with 1:2:4 cement concrete Nominal mix, using 12mm hard broken stone aggregate including cost of all materials, seigniorage charges, excluding conveyance charges of materials including the cost of machinery, labour charges, mixing, placing in position, leveling, vibrating, curing etc. complete for finished item of work. (Using concrete mixer)

28.95

-

200.35

... More
CR stone masonry in 2nd sort in CM (1:6) prop: (cement : sand) using hard granite stones from approved quarry including cost and conveyance of all materials like cement, sand water, granite stones, etc., from approved quarry to site and including labour for cutting stones to required size and shape, mixing of cement, mortar, construction, scaffolding charges, curing etc., and overheads & contractors profit, complete for finished item of work in foundation & basement. (APSS No. 615 & 601)

17.37

-

4355

... More
Supply & construction of Brick Masonry in CM (1:6) with 2nd class Bricks traditional size 23x11x7 2nd class with compressive of 37 Kgs / Sqcm from approved source including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504). (BLD-CSTN-5-4)

64.73

-

5981.12

... More
Plastering 12mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904)

505.46

-

345.33

... More
Plastering 20mm thick in two coats using screened sand with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc.,complete for External uneven surfaces of Brick wall and RCC exposed surface and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) for :- Plastering 2/c in CM(1:4) & (1:6) 20mm

205.08

-

468.79

... More
Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903).

126

-

493.79

... More
Dadooing to walls withglazed red or white full body ceramic wall tiles of Size 300 x 450 mm / 320 mm x 400 mm and thickness 6 mm and 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of C.M (1:5) proportion, 12mm thick and neat grey cement slurry of honey like consistency, spread at the rate of 3.3Kgs per Sqm and jointed with white cement or coloured cement to match the shade of the tiles, including cost and conveyance of all materials like cement, sand, water, tiles, coloured cement, overheads & contractors profit etc., to site, all labour charges for mixing of cement mortar, laying glazed tiles to level, curing etc., complete for finished item of work as directed by Engineer-in-charge.

35.2

-

663.99

... More
Flooring with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) of regular colours (other than black) set over a base coat of CM (1:8) prop. 20mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 Kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement, sand, water, granite, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying granite to required slope as directed by the Engineer- in-charge, cost of overheads & contractors profit etc., complete for finished item of work . (APSS No.701 & 707)

301.8

-

3703.82

... More
Supplying & fixing collapsible steel shutters with vertical,double channel of 20 x10x2 mm of 100 mm centre ,Bracers with flat iron 40x40x6 mm with 38 mm dia steel pulleys, the top, bottom and side vertical frames of the collapsible gate with 65x65mmx8mm MS Angle and middle guide rail at site height with 65mmx8mm MS flat for the pulleys to guide and fixed with necessary hold fasts, bolts, nuts, rivets,lockingarrangements,stoppers,han dles, all accessories all fixtures andpainted with one coat of approved steelprimer etc., complete for finished item ofworkas per specialspn1105

7.2

-

3465.26

... More
S&F of Mild Steel Trusses, Purlins, Plates, Brasings etc., using MS hollow pipes of different sizes etc., including cost and conveyance of all materials like MS square pipes, plates including Labour charges for fabricating all heavy steel works like Trusses, Stanchions, Heavy Beams and Girders including cost of welding rods, power charges, etc excluding cost of fixing in position etc complete for finished item of work.

1550

-

119.65

... More
Roofing with corrugated G.I sheets 0.80mm thick fixed with G.I ‘J’ bolts & nuts 8 mm dia with bitumen & G.I limpet washers filled with white lead1 & including a coat of approved steel primer and two coats of approved paint on over lapping of sheets complete (up to a pitch of 600) and seigniorage charges, etc., complete, excluding the cost of purlins, rafters, trusses including cost and conveyance of all materials , labour charges , overheads and contractors profit etc., complete for finished item of work in all floors. (BLD-CSTN-10-1)

150

-

1072.8

... More
Supply and fabricating steel works like Window Grills, Compound Wall Grills, Iron Doors, Windows including cost of welding rods, power charges, including cost of fixing in position including all cost and conveyance of materials and all labour charges for cutting, bending to required shape welding including cost of weilding rods griding etc complete with all taxes etc., complete for finished item of work as per the approval of the Engineer-in-Charge.

252

-

106.35

... More
Painting with Priming Coat to given an even shade after throughly brushing the surface to remove all dirt and remains of losse powdered materials, including cost and conveyance of all materials to work site and all operational incidental labour charges etc., complete for finished item of work as per SS

2.52

-

59.31

... More
Painting with Synthetic Enamel paints -one coat - for New wood work, old wood work & New Iron work to given an even shade after throughly brushing the surface to remove all dirt and remains of losse powdered materials, including cost and conveyance of all materials to work site and all operational incidental labour charges etc., complete for finished item of work as per SS

2.52

-

63.18

... More
Supplying and fixing FOLDABLE SHUTTER DOOR using Medium Teak wood Door Frame section of 125*75 MM is fixed to wall using MS Z Hold fast 300 MM long. including Door top arch with tinted glass of 5MM thickness , Medium Teak wood door shutters - 35 mmthick as per drawing including cost of Brass fixtures such as 12 Nos. Butt hinges 125mm long, 4 No tower bolt of 200x10mm dia, 1 No. Aldrops - 300 mm long, 1No. Latche-300mm long, 6 Nos. handles of 150 mm size & 1 Nos. Heavy duty door stoppers including fixing the fixtures to door with required no. of screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc., complete for finished item of work. (Door size 1.5 X 2.7m)

2.52

-

14266.49

... More
Supply & applying Melamine Polish Glossy/ Matt finish to the wood works duly cleaning the surface and applying emery paper, Sand the wood with 180 No., emery paper and then with 320 No., emery paper, clean & wipe off loose dust, applying suitable knifing paste filler / wood filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper, apply two component wood sealer, air dry for 24 hrs, Sand with 320 No emery paper, applying one coat of approved spraying thinner (for spraying)/ applying one coat of approved brushing thinner or general purpose thinner (for brushing) and apply (either with spray or brush) two coats of approved brand melamine including cost & labour charges, emery papers, cost of thinner & melamine polish of approved brands such as Jenson & Nicholson, Asian Paints, Berger Paints or equivalent etc., complete for finished item of work

2.52

-

1257.51

... More
Providing and applying synthetic plaster putty or plaster of paris putty or lime punning of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for Internal walls

505.46

-

200.02

... More
Painting to new walls with 2 coats of acrylic emulsion paint of approved brand (Asian/Berger/Nerolac/Saicoat/Indocem or equivalent) and shade over base coat of approved cement primer grade-1 making 3 coats in all to give even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges , overheads & contractors profit etc., complete for finished item of work as per SS 911 Internal colouring

505.46

-

151.22

... More
Painting to new walls with 2 coats of Acrylic emulsion paint of approved brand (Asian/Berger/Nerolac/Saicoat/Indocem or equivalent) and shade over base coat of approved cement primer grade-1 making 3 coats in all to give even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges , overheads & contractors profit etc., complete for finished item of work as per SS 911 External colouring

205.08

-

162.32

... More
Plastering 25mm to 40mm thick base plastering 12mm to 20 mm in CM (1:3) and top finishing 12mm thick with CM (1:2) to bring the required ornamentation including fine rendering with neat cement cost and conveyanceof all materials, labour charges, all incidental and operational charges curing, lifting, scafolding charges etc. for external surface as per approved drawings and as directed during execution including preparation and fixing precast pillars, kudam,palakai, vedika. Lathalu in Uttara Eludhakam, pothikas, nasigudu. pupha puskala adihishtanam, wherever necessary and including overheads and contractors profit, excluding GST on all materials etc.Complete for finished item of work(as per silpi SSR 19-20) (1st class ornamentation work)

22.4

-

1237.6

... More
supply and fixing of clay jali 200x200x75mm with special adhesive and metal paste line for clean and neat look as per the direction of engineer in charge

36.8

-

3285

... More
Supplying and fixing stainless steel works such as railing, hand rale, grills etc., using Stainless Steel Tubes of 304 Grade as per the approved drawing including cost and conveyance of all materials to site, Labour charges for Fabrication of stainless steel works using stainless steel welding rods including buffing, polishing, lacquer finishing, to present seamless finish, overheads & contractors profit etc ., complete for finished item of work.

320

-

598.51

... More
Supply ,installation, commissioning and testing of Gasifier furnace for human cremation with Cremation Furnace made of Mild steel [ IS 2062] & insulated with refractory bricks. A Cremation Trolly Casted with refractory cement and stretcher shall be provide for easy loading of Dead body. With lowering and lifting arrangment. Trolley shall be of M.S Steel..The 2 Nos of Gas burners with gas line should be provided mounted at place of cremator facilitating access for comprehensive maintenance and repairs. Burners should configured for On/Off control, and should be ignited automatically and the burner system should be protected against flame failure, herby complying with the gas regulationsthe contrilconsist of supply on/off switch, Digital Temperature Controller with back up control, Motor starter, Ampere meter, Fuse, MCCB, Flame monitor etc. The system shall be connected to chimney of 1. 300mm Dia. X 6mm Thick X 20 Ft Length MS Pipe 2. MS Cone 1000mm base Dia. X3000mm Height X10mm Thick 3. 1200 mm X 1200 mm X 16mm Thick Bottom Flange 4. Flanges 310mm (I.D.) X 25mm Thick 5. 22mm Dia. Half Thread High Tension Nut/Bolts with one spring washer and two plain washers. 6. Earthing, Red Light Flasher 7. Foundation Bolts/Nuts 35mm Dia. X 1500mm Long 8. Steel Core Wire Rope 10mm Dia. This system shall be inreturn conencted to wetscubber system which Condenses the smoke through high-pressure cold air so the heavy ash particles gets settle down in the chamber and gases pass through second stage.it Washes the smoke through high pressure water sprinkled over it and goes to third stage.the Excess carbon particles mix with water and hot gases released through chimney.

1

-

3950000

... More
Supply and Fixing of 25mm outer dia heavy (2.20mm thickness) grade, FRLS with IS:9537 part 3 regid PVC pipe (ISI mark) concealed in wall with all required accessories including masonary work for light, fan , common and separate plug point including all labour charges etc., complete. Makes : Sudhakar / Modi ( ISI mark).

90

-

86.82

... More
Supply and fixing of 6A / 10A 3/2 Pin 2 Module Modular Socket with shutter with 6A / 10A 1 Way 1 Module Modular Switch control on a Common switch board with with 3 Module Hot Dip Galvanized Modular Metal Box covered with 3 Modular Cover Frame with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Modular Switch, Socket, Metal box & Cover frame Make:GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge.

10

-

472.69

... More
Supply and Fixing of 20A 2 Module Modular Socket with shutter and 16A / 20A 1 Way 1 Module Modular Switch duly recessed in wall with 3 Module Hot Dip Galvanized Modular Metal Box size covered with 3 Modular Cover Frame including earth connections and all labour charges etc., complete.[ Power plug ] Modular Switch,socket,metal box & Cover frame Make:GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge.

4

-

655.5

... More
Supply and run of 2 of 36/0.3mm (2.5 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for mains inlcuding all labour charges etc., complete. Makes: Polycab /RPG / Million / Power Flex / Anchor / V-Guard.

200

-

74.59

... More
Supply and run of 2 of 140/0.3mm (10.0 Sqmm) PVC FRLS / HFFR insulated flexible Copper cable in existing pipe for mains including all labour charges etc., complete. Makes: :Polycab /RPG / Million / Power Flex / Anchor / V-Guard.

110

-

230.05

... More
Fixing of 20W/18W led tube light luminaire on wall / Ceiling with / TW /PVC round blocks with all accessories including giving connections and all labour charges etc., complete.

8

-

147.59

... More
Supply and transportation of 20W, 2000 lumins, 1200mm length, T8 LED tube light fitting with extruded alluminium housing, input voltage AC 165 - 260 Volts with 0.9 PF with driver and frosted cover etc., complete with 3 years warranty. Luminaire Make : Phillips / Osram / GE / Crompton /VIN / Bajaj / Havells / Halonix.

8

-

792

... More
Supply and fixing of 18W heavy duty LED Down lighter, suitable for Recessed / Surface mounting made of pressure diecast alluminium body with powder coating, acrylic diffuser with Driver as per IS: 15885 (Part 2/ Sec 13) : 2012 , operating voltage range of 150 to 265 Volts AC, P.F 0.9, Surge protection: 2KV, THD10% with high power LED's having efficacy of 80 lumins / watt, CCT: 3000K -5700K, minimum CRI 70, Luminaire performance complies to IS 10322 (Part 5 / Sec-3) etc., completea) LUMINAIRE MAKE : Pasolite / Cosmo / Siger/ Koncept/ Kiran/Vibrant/Leo/Lumens/Iliteb) LED MAKE : CREE / NICHIA / OSRAM / SAMSUNG / EVERLIGHT

16

-

1449

... More
Supply of 12" (300mm) Light duty exhaust fan with wire guard etc complete etc., complete. Makes : Crompton / Bajaj Bahar WG / Havells Ventil Air-DB / Orient hill air.

4

-

1668

... More
Labour charges for fixing of Exhaust fan in wall with necessary connections etc., complete ( for hole already made available).

4

-

396.68

... More
Supply and fixing of 4 Way VTPN DB suitable for accomodating 125A 4 Pole MCCB as incomer and 63A,10KA, TP MCBs-4 Nos as outgoing and with IP 43 Protection including internal connection and labour charges for surface / flush mounting etc., complete. Incommer: 125A,4P,25KA MCCB-1No. Outgoing: 63A, 10KA , TP MCB's -4 Nos DB Makes : Legrand / Schneider. MCCB Make: L&T / Schneider / Siemens / Legrand. MCB Make: Legrand-DX3 / Schneider-Acti9.

2

-

23401

... More
Supply of 48" (1200mm) Sweep decorative Ceiling Fan, with double ball bearings with all accessories without Regulator. Makes: Crompton HS Decora / Bajaj Regal Star / Havells Spark deco / Orient summer crown /Halonix(Zephyr) /Polycab(India Glory) /G.M. (G-Storm)

4

-

2645

... More
Labour charges for Fixing of Ceiling fan and regulator including transportation and giving connections with twin core wire etc., complete.

4

-

167.81

... More
Supply and fixing of 7W LED COB Spot Light, suitable for Recessed mounting made of diecast alluminium body with powder coating, with Driver, operating voltage range of 150 to 265 Volts AC, CCT: 3000K - 5700K, minimum CRI70, .etc., complete Makes : Surya /C&S / Syska / Enrich / Stanjo / Polycab/ Ib LED/ Opple/R LED/Luker/ Orbit/Trinic/Panasonic b) LED MAKE : Bridge Lux / LUMILEDS / CREE / NICHIA / SAMSUNG/ Sunpo

12

-

920

... More
Supply of 1 Module Modular type Electronic step type Fan Regulator with 2 Module Hot Dip Galvanized Modular Metal Box covered with 2 modular cover frame etc., complete. Makes : GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge.

4

-

624

... More
Providing independent earthing by excavating a trench to a depth of 2.1 M in all soils, as per size specified in the Data, using 40mm dia 'B' class GI pipe of 2.5 Mtrs length with necessary accessories with hume pipe ring duly providing staggered holes including filling with equal proportion of Salt and Charcoal in layers and all labour charges etc., complete for small quarters.

1

-

3821.56

... More
Earth work excavation for foundations (Manual Means) of buildings in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work including seigniorage excluding dewatering charges etc., as per SS 20 B(APSS 308)

34.56

-

238.32

... More
Conveyance of un-useful excavated earth to a distance of 2 KM for disposal including hire charges of T & P, labour charges etc., and overheads & contractors profit complete for finished item of work.

17.28

-

38.29

... More
Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

49.67

-

331.16

... More
Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 20mm size hard , machine crushed trap from approved quarry including cost and conveyance of all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402) ( (BLD-CSTN-3-5))

9.6

-

3978.18

... More
Pre construction Anti termite is a process in which chemical toxic to subterrean termites is apply/ inject into soil during early stage of building Construction 2. Treatement of soil Beneath the building and around the foundations conduct and chemical use as per BIS - IS 6313 (Part -2) 2013 code specification & CIB RC registered termiticide which creates a continuous chemical barrier beneath the building which kills or repels terminates & impervious to tremite entry 3. Imidacloprid 30.5% SC (IS 63131) dissolve 2.1 Ml/1 liter of water and apply emulsion/solution @ 7.5 Litres/Square meter (Sqm) of internal, external vertical surface of the colums , plinth beams (Back filling) walls and floor junction, external perimeters, along reatining wall @ 5.0 Liters/Sqm of the horizontal surface of basement top surface of the basement filling below flooring bed (Plinth) & @ 2.0 Litres/ Line meter at expansion joints. The substructure of a depth of 500mm around coulmns & 300mm deep around plinth beams, basements & floor filling area including excavation channel along the wall & rodding etc. cost & Conveyance of all materials to the site, cost of labour for sparying, rodding etc. complete for furnished item of work as per the approval of the Engineer-in-charge.

120

-

170.42

... More
Supply and placing of the Design Mix Concrete M20 (350kg Cement) corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. (BLD-CSTN-3-14) For Footing

2.4

-

8646.77

... More
For Plinth Beam

2.54

-

11222.28

... More
For Columns

2.16

-

11666.35

... More
For Roof Beam

6.75

-

10908.92

... More
For Slab

9.6

-

9742.48

... More
Supplying, fitting and placing Fe - 500 HYSD bar reinforcement complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage,where they are not welded including cost and conveyance of steel, binding wire etc., lifting charges of steel , placing in position, tying with binding wire, all tools etc., and overheads & contractors profit complete for finished item of work( APSS No.126 )

2702.02

-

87.93

... More
CR stone masonry in 2nd sort in CM (1:6) prop: (cement : sand) using hard granite stones from approved quarry including cost and conveyance of all materials like cement, sand water, granite stones, etc., from approved quarry to site and including labour for cutting stones to required size and shape, mixing of cement, mortar, construction, scaffolding charges, curing etc., and overheads & contractors profit, complete for finished item of work in foundation & basement. (APSS No. 615 & 601)

7.2

-

4355

... More
Supply & construction of Brick Masonry in CM (1:6) with 2nd class Bricks traditional size 23x11x7 2nd class with compressive of 37 Kgs / Sqcm from approved source including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504). (BLD-CSTN-5-4)

8.96

-

5981.12

... More
Plastering 12mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904)

228.16

-

345.33

... More
Plastering 20mm thick in two coats using screened sand with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc.,complete for External uneven surfaces of Brick wall and RCC exposed surface and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) for :- Plastering 2/c in CM(1:4) & (1:6) 20mm

44.16

-

468.79

... More
S&F of Mild Steel Trusses, Purlins, Plates, Brasings etc., using MS hollow pipes of different sizes etc., including cost and conveyance of all materials like MS square pipes, plates including Labour charges for fabricating all heavy steel works like Trusses, Stanchions, Heavy Beams and Girders including cost of welding rods, power charges, etc excluding cost of fixing in position etc complete for finished item of work.

835.69

-

119.65

... More
Painting with Priming Coat to given an even shade after throughly brushing the surface to remove all dirt and remains of losse powdered materials, including cost and conveyance of all materials to work site and all operational incidental labour charges etc., complete for finished item of work as per SS

61.28

-

59.31

... More
Painting with Synthetic Enamel paints -one coat - for New wood work, old wood work & New Iron work to given an even shade after throughly brushing the surface to remove all dirt and remains of losse powdered materials, including cost and conveyance of all materials to work site and all operational incidental labour charges etc., complete for finished item of work as per SS

61.28

-

63.18

... More
Flooring with vitrified polished/Semi-polished floor tiles of 1st quality and make as approved by Engineer-in-charge of size not less than 600 mm x 600 mm , 8-10 mm thickness of any color finish and all shades and designs with borders and design as per the approved flooring pattern as directed by the Engineer-In -Charge set over a base coat of CM (1:8) prop. 12mm thick using screened sand over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 Kgs per Sqm. and jointed neately with white cement paste to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, white cement etc., to site (excluding cost of C.C. bed) and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge etc.,and overheads & contractors profit complete for finished item of work. (APSS No.701 & 707)

52.96

-

1238.39

... More
Supply and installation of Best tiled roofing with mangalore tiles (rustic green color)inlcuding CM.

140

-

2216.3

... More
Flooring with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) of regular colours (other than black) set over a base coat of CM (1:8) prop. 20mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 Kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement, sand, water, granite, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying granite to required slope as directed by the Engineer- in-charge, cost of overheads & contractors profit etc., complete for finished item of work . (APSS No.701 & 707)

92.8

-

3703.82

... More
Painting to new walls with 2 coats of acrylic emulsion paint of approved brand (Asian/Berger/Nerolac/Saicoat/Indocem or equivalent) and shade over base coat of approved cement primer grade-1 making 3 coats in all to give even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges , overheads & contractors profit etc., complete for finished item of work as per SS 911 Internal colouring

124.16

-

151.22

... More
supply and fixing of 6mm thk HPL inlcuding cost and conveyance of all materials to work site and fixing ccharges, overheads and constractor profits etc

4.8

-

7200

... More
Supplying and fixing stainless steel works such as railing, hand rale, grills etc., using Stainless Steel Tubes of 304 Grade as per the approved drawing including cost and conveyance of all materials to site, Labour charges for Fabrication of stainless steel works using stainless steel welding rods including buffing, polishing, lacquer finishing, to present seamless finish, overheads & contractors profit etc ., complete for finished item of work.

320

-

598.51

... More
Supply and Fixing of 25mm outer dia heavy (2.20mm thickness) grade, FRLS with IS:9537 part 3 regid PVC pipe (ISI mark) concealed in wall with all required accessories including masonary work for light, fan , common and separate plug point including all labour charges etc., complete. Makes : Sudhakar / Modi ( ISI mark).

50

-

86.82

... More
Supply and run of 2 of 36/0.3mm (2.5 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for mains inlcuding all labour charges etc., complete. Makes: Polycab /RPG / Million / Power Flex / Anchor / V-Guard.

50

-

74.59

... More
Supply and run of 2 of 140/0.3mm (10.0 Sqmm) PVC FRLS / HFFR insulated flexible Copper cable in existing pipe for mains including all labour charges etc., complete. Makes: :Polycab /RPG / Million / Power Flex / Anchor / V-Guard.

60

-

230.05

... More
Supply and fixing of 18W heavy duty LED Down lighter, suitable for Recessed / Surface mounting made of pressure diecast alluminium body with powder coating, acrylic diffuser with Driver as per IS: 15885 (Part 2/ Sec 13) : 2012 , operating voltage range of 150 to 265 Volts AC, P.F 0.9, Surge protection: 2KV, THD10% with high power LED's having efficacy of 80 lumins / watt, CCT: 3000K -5700K, minimum CRI 70, Luminaire performance complies to IS 10322 (Part 5 / Sec-3) etc., completea) LUMINAIRE MAKE : Pasolite / Cosmo / Siger/ Koncept/ Kiran/Vibrant/Leo/Lumens/Iliteb) LED MAKE : CREE / NICHIA / OSRAM / SAMSUNG / EVERLIGHT

8

-

1449

... More
Supply and fixing of 6A / 10A 3/2 Pin 2 Module Modular Socket with shutter with 6A / 10A 1 Way 1 Module Modular Switch control on a Common switch board with with 3 Module Hot Dip Galvanized Modular Metal Box covered with 3 Modular Cover Frame with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Modular Switch, Socket, Metal box & Cover frame Make:GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge.

8

-

472.69

... More
Supply of 48" (1200mm) Sweep decorative Ceiling Fan, with double ball bearings with all accessories without Regulator. Makes: Crompton HS Decora / Bajaj Regal Star / Havells Spark deco / Orient summer crown /Halonix(Zephyr) /Polycab(India Glory) /G.M. (G-Storm)

4

-

2645

... More
Labour charges for Fixing of Ceiling fan and regulator including transportation and giving connections with twin core wire etc., complete.

4

-

167.81

... More
Supply of 1 Module Modular type Electronic step type Fan Regulator with 2 Module Hot Dip Galvanized Modular Metal Box covered with 2 modular cover frame etc., complete. Makes : GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge.

4

-

624

... More
Supply and fixing of 4 Way VTPN DB suitable for accomodating 125A 4 Pole MCCB as incomer and 63A,10KA, TP MCBs-4 Nos as outgoing and with IP 43 Protection including internal connection and labour charges for surface / flush mounting etc., complete. Incommer: 125A,4P,25KA MCCB-1No. Outgoing: 63A, 10KA , TP MCB's -4 Nos DB Makes : Legrand / Schneider. MCCB Make: L&T / Schneider / Siemens / Legrand. MCB Make: Legrand-DX3 / Schneider-Acti9.

4

-

23401

... More
Supply and fixing of 7W LED COB Spot Light, suitable for Recessed mounting made of diecast alluminium body with powder coating, with Driver, operating voltage range of 150 to 265 Volts AC, CCT: 3000K - 5700K, minimum CRI70, .etc., complete Makes : Surya /C&S / Syska / Enrich / Stanjo / Polycab/ Ib LED/ Opple/R LED/Luker/ Orbit/Trinic/Panasonic b) LED MAKE : Bridge Lux / LUMILEDS / CREE / NICHIA / SAMSUNG/ Sunpo

12

-

920

... More
Earth work excavation for foundations (Manual Means) of buildings in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work including seigniorage excluding dewatering charges etc., as per SS 20 B(APSS 308)

43.32

-

238.32

... More
Conveyance of un-useful excavated earth to a distance of 2 KM for disposal including hire charges of T & P, labour charges etc., and overheads & contractors profit complete for finished item of work.

21.66

-

38.29

... More
Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

62.92

-

331.16

... More
Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 20mm size hard , machine crushed trap from approved quarry including cost and conveyance of all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402) ( (BLD-CSTN-3-5))

8.67

-

3978.18

... More
Providing Antitermite treatment as per IS 6315 (Part-2) 2001 (pre - constructional chemical treatment measures) along the internal and external verticalfaces of the columns plinth beams , basements and top surface of the basement filling below flooring bed as per the specified procedure confirming to IS 6315 (Part -2) 2001 and other relavent approved specification duly using Chlorpyriphos/lindane emulsifiable concentrate 20% with 1% concentration at 7.5 ltrs/Sqm of the vertical surface and at 5 ltrs / Sqm pf the horizontal surface of the sub structure to a depth of 500mm areound columns and 300mm deep around plinth beams basements & floorfilling area including excabvation channel along the wall and rodding etc., and cost and conveyence of all materials to the site cost of labour for spraying rodding etc., complete for finshed item of work as per approval of Engineer In Charge

259.36

-

170.42

... More
Supply and placing of the Design Mix Concrete M20 (350kg Cement) corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. (BLD-CSTN-3-14) FOOTINGS

2.49

-

8646.77

... More
PLINTH BEAMS

5.24

-

11222.28

... More
COLUMNS

4.19

-

11666.35

... More
ROOF BEAMS

5.24

-

10908.92

... More
SLAB

15

-

9742.48

... More
Supplying, fitting and placing Fe - 500 HYSD bar reinforcement complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage,where they are not welded including cost and conveyance of steel, binding wire etc., lifting charges of steel , placing in position, tying with binding wire, all tools etc., and overheads & contractors profit complete for finished item of work ( APSS No.126 )

3686.18

-

87.93

... More
Damp proof course 50mm thick with 1:2:4 cement concrete Nominal mix, using 12mm hard broken stone aggregate including cost of all materials, seigniorage charges, excluding conveyance charges of materials including the cost of machinery, labour charges, mixing, placing in position, leveling, vibrating, curing etc. complete for finished item of work. (Using concrete mixer)

18

-

200.35

... More
CR stone masonry in 2nd sort in CM (1:6) prop: (cement : sand) using hard granite stones from approved quarry including cost and conveyance of all materials like cement, sand water, granite stones, etc., from approved quarry to site and including labour for cutting stones to required size and shape, mixing of cement, mortar, construction, scaffolding charges, curing etc., and overheads & contractors profit, complete for finished item of work in foundation & basement. (APSS No. 615 & 601)

10.8

-

4355

... More
Supply & construction of Brick Masonry in CM (1:6) with 2nd class Bricks traditional size 23x11x7 2nd class with compressive of 37 Kgs / Sqcm from approved source including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504). (BLD-CSTN-5-4)

43.61

-

5981.12

... More
Plastering 12mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904)

120

-

345.33

... More
Plastering 20mm thick in two coats using screened sand with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc.,complete for External uneven surfaces of Brick wall and RCC exposed surface and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) for :- Plastering 2/c in CM(1:4) & (1:6) 20mm

120

-

468.79

... More
Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903).

120

-

493.79

... More
Flooring with vitrified polished/Semi-polished floor tiles of 1st quality and make as approved by Engineer-in-charge of size not less than 600 mm x 600 mm , 8-10 mm thickness of any color finish and all shades and designs with borders and design as per the approved flooring pattern as directed by the Engineer-In -Charge set over a base coat of CM (1:8) prop. 12mm thick using screened sand over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 Kgs per Sqm. and jointed neately with white cement paste to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, white cement etc., to site (excluding cost of C.C. bed) and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge etc.,and overheads & contractors profit complete for finished item of work. (APSS No.701 & 707)

100

-

1238.39

... More
Providing skirting to internal walls to 15 cm height with vitrified tiles 8mm thick , regular finish and normal colour, length equal to flooring tiles, set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 Kgs per Sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc.,and overheads & contractors profit complete excluding seigniorage charges etc., complete for finished item of work.(APSS No.701 &707

12

-

1240.88

... More
Dadooing to walls withglazed red or white full body ceramic wall tiles of Size 300 x 450 mm / 320 mm x 400 mm and thickness 6 mm and 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of C.M (1:5) proportion, 12mm thick and neat grey cement slurry of honey like consistency, spread at the rate of 3.3Kgs per Sqm and jointed with white cement or coloured cement to match the shade of the tiles, including cost and conveyance of all materials like cement, sand, water, tiles, coloured cement, overheads & contractors profit etc., to site, all labour charges for mixing of cement mortar, laying glazed tiles to level, curing etc., complete for finished item of work as directed by Engineer-in-charge.

5.52

-

663.99

... More
Painting to new walls with 2 coats of acrylic emulsion paint of approved brand (Asian/Berger/Nerolac/Saicoat/Indocem or equivalent) and shade over base coat of approved cement primer grade-1 making 3 coats in all to give even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges , overheads & contractors profit etc., complete for finished item of work as per SS 911 Internal colouring

390

-

151.22

... More
Painting to new walls with 2 coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 50 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Exterior Grade- 2 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls for:-External Colouring - Plastic emulsion paint - 3 Coats.

120

-

162.32

... More
supply and fixing of 6mm thk HPL inlcuding cost and conveyance of all materials to work site and fixing ccharges, overheads and constractor profits etc

5.2

-

7200

... More
Flooring with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) of regular colours (other than black) set over a base coat of CM (1:8) prop. 20mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 Kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement, sand, water, granite, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying granite to required slope as directed by the Engineer- in-charge, cost of overheads & contractors profit etc., complete for finished item of work . (APSS No.701 & 707)

15.12

-

3703.82

... More
supply and fixing of clay jali 200x200x75mm with special adhesive and metal paste line for clean and neat look as per the direction of engineer in charge

15.84

-

3285

... More
Supplying and fixing stainless steel works such as railing, hand rale, grills etc., using Stainless Steel Tubes of 304 Grade as per the approved drawing including cost and conveyance of all materials to site, Labour charges for Fabrication of stainless steel works using stainless steel welding rods including buffing, polishing, lacquer finishing, to present seamless finish, overheads & contractors profit etc ., complete for finished item of work.

200

-

598.51

... More
Supply and installation of Best tiled roofing with mangalore tiles (rustic green color)inlcuding CM.

150

-

2216.3

... More
Supplying and fixing NP bib taps of size 12.70mm dia of Indian make Seiko or equivalent including cost and conveyance of all materials, labour charges etc., complete for finished item of work in all floors.

2

-

682.01

... More
Supplying & fixing Ashirvad/Astral flow guard for equivalent CPVC Pipes with fittings in ground or on wall including cost of tees, elbows, bends, reducers, couplings, running joints, union flanges, unions etc. with necessary excavation in all types of soils except rock requiring blasting, refilling, chiselling masonry walls and making good the walls & floors to the original surface and fixing MS clamps on TW blocks on walls including cost and conveyance of all materials and labour charges complete for finished item of work. complete 22.20 mm dia CPVC SDR 11.00

10

-

110.21

... More
54 mm dia CPVC SDR 11.00

20

-

574.89

... More
Supplying and fixing PPR Ball valve as per ISI Class - I , Indian make heavy type including cost and conveyance of all materials , labour charges etc. complete for finished item of work 25mm PPR Ball valve

2

-

244.27

... More
50mm PPR Ball valve

2

-

613.52

... More
s&f 3" (76.2 mm ) Nahany Trap with Jali - UPVC/SWR Pipe fittings

2

-

135.2

... More
S&F 75 mm dia 1828.8 mm (6'-0") Single Socket PVC/SWR pipe- 6 Kg/sq.cm

10

-

373.79

... More
Constructing 904.0 mm (3’0”) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mmincluding plastering with cement mortar 1:3 prop; ½” thick both inside and outside fitted with 20” dia RCC manhole covers and frames including excavating pits up to a depth of 1524 mm (5'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification andincluding cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental andoperational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work as per Standard specification.

1

-

10262.84

... More
Supplying & fixing 150 mm x 100 mm SWG gully trap conforming to ISI 651 & 4127 with C.I Grating & Cost. Brick masonry in CM 1:6 prop. Intermediate chamber and fitted with304.8 mm x 288.6mm (12"x9") C.I Frame and hinged cover

1

-

577.16

... More
Supply of SWG Plugs conforming to IS standards for 150 mm dia

2

-

62.49

... More
Labour charges for fixing and laying the SWG Junctions/ Plugs/ Bends of any dia with airtight cement joints as per standard practice

2

-

36.36

... More
Manufacture, Supply and Delivery of R.C.C. Plain ended pipes conforming to B.I.S 458/2003,Ex -factory, excluding transportation and all taxes. (NP-2 Class - 150mm dia ).

5

-

214.73

... More
Lowering the RCC plain ended pipes carefully into the trench laying them true to alignment and gradient, jointing RCC pipes with cement joints including curing, the cost of jointing materials i.e., Cement Mortar (1:1.5), hemp yarn etc., and testing including filling with water with a water lead up to 500 Meters excluding cost of rubber rings as per BIS No.783/85.

5

-

163.61

... More
Supply and Fixing of 25mm outer dia heavy (2.20mm thickness) grade, FRLS with IS:9537 part 3 regid PVC pipe (ISI mark) concealed in wall with all required accessories including masonary work for light, fan , common and separate plug point including all labour charges etc., complete. Makes : Sudhakar / Modi ( ISI mark).

40

-

86.82

... More
Supply and run of 2 of 36/0.3mm (2.5 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for mains inlcuding all labour charges etc., complete. Makes: Polycab /RPG / Million / Power Flex / Anchor / V-Guard.

60

-

74.59

... More
Supply and run of 2 of 140/0.3mm (10.0 Sqmm) PVC FRLS / HFFR insulated flexible Copper cable in existing pipe for mains including all labour charges etc., complete. Makes: :Polycab /RPG / Million / Power Flex / Anchor / V-Guard.

50

-

230.05

... More
Supply and fixing of 18W heavy duty LED Down lighter, suitable for Recessed / Surface mounting made of pressure diecast alluminium body with powder coating, acrylic diffuser with Driver as per IS: 15885 (Part 2/ Sec 13) : 2012 , operating voltage range of 150 to 265 Volts AC, P.F 0.9, Surge protection: 2KV, THD10% with high power LED's having efficacy of 80 lumins / watt, CCT: 3000K -5700K, minimum CRI 70, Luminaire performance complies to IS 10322 (Part 5 / Sec-3) etc., completea) LUMINAIRE MAKE : Pasolite / Cosmo / Siger/ Koncept/ Kiran/Vibrant/Leo/Lumens/Iliteb) LED MAKE : CREE / NICHIA / OSRAM / SAMSUNG / EVERLIGHT

12

-

1449

... More
Supply and fixing of 6A / 10A 3/2 Pin 2 Module Modular Socket with shutter with 6A / 10A 1 Way 1 Module Modular Switch control on a Common switch board with with 3 Module Hot Dip Galvanized Modular Metal Box covered with 3 Modular Cover Frame with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Modular Switch, Socket, Metal box & Cover frame Make:GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge.

10

-

472.69

... More
Supply and fixing of 7W LED COB Spot Light, suitable for Recessed mounting made of diecast alluminium body with powder coating, with Driver, operating voltage range of 150 to 265 Volts AC, CCT: 3000K - 5700K, minimum CRI70, .etc., complete Makes : Surya /C&S / Syska / Enrich / Stanjo / Polycab/ Ib LED/ Opple/R LED/Luker/ Orbit/Trinic/Panasonic b) LED MAKE : Bridge Lux / LUMILEDS / CREE / NICHIA / SAMSUNG/ Sunpo

8

-

920

... More
Supply and fixing of 4 Way VTPN DB suitable for accomodating 125A 4 Pole MCCB as incomer and 63A,10KA, TP MCBs-4 Nos as outgoing and with IP 43 Protection including internal connection and labour charges for surface / flush mounting etc., complete. Incommer: 125A,4P,25KA MCCB-1No. Outgoing: 63A, 10KA , TP MCB's -4 Nos DB Makes : Legrand / Schneider. MCCB Make: L&T / Schneider / Siemens / Legrand. MCB Make: Legrand-DX3 / Schneider-Acti9.

1

-

23401

... More
Supply of 48" (1200mm) Sweep decorative Ceiling Fan, with double ball bearings with all accessories without Regulator. Makes: Crompton HS Decora / Bajaj Regal Star / Havells Spark deco / Orient summer crown /Halonix(Zephyr) /Polycab(India Glory) /G.M. (G-Storm)

4

-

2645

... More
Labour charges for Fixing of Ceiling fan and regulator including transportation and giving connections with twin core wire etc., complete.

4

-

167.81

... More
Supply of 1 Module Modular type Electronic step type Fan Regulator with 2 Module Hot Dip Galvanized Modular Metal Box covered with 2 modular cover frame etc., complete. Makes : GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge.

4

-

624

... More
Supply of 12" (300mm) Light duty exhaust fan with wire guard etc complete etc., complete. Makes : Crompton / Bajaj Bahar WG / Havells Ventil Air-DB / Orient hill air.

2

-

1668

... More
Labour charges for fixing of Exhaust fan in wall with necessary connections etc., complete ( for hole already made available).

2

-

396.68

... More
Earth work excavation for foundations (Manual Means) of buildings in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work including seigniorage excluding dewatering charges etc., as per SS 20 B(APSS 308)

12.69

-

238.32

... More
Conveyance of un-useful excavated earth to a distance of 2 KM for disposal including hire charges of T & P, labour charges etc., and overheads & contractors profit complete for finished item of work.

6.35

-

38.29

... More
Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

52.86

-

331.16

... More
Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 20mm size hard , machine crushed trap from approved quarry including cost and conveyance of all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402) ( (BLD-CSTN-3-5))

6.57

-

3978.18

... More
Pre construction Anti termite is a process in which chemical toxic to subterrean termites is apply/ inject into soil during early stage of building Construction 2. Treatement of soil Beneath the building and around the foundations conduct and chemical use as per BIS - IS 6313 (Part -2) 2013 code specification & CIB RC registered termiticide which creates a continuous chemical barrier beneath the building which kills or repels terminates & impervious to tremite entry 3. Imidacloprid 30.5% SC (IS 63131) dissolve 2.1 Ml/1 liter of water and apply emulsion/solution @ 7.5 Litres/Square meter (Sqm) of internal, external vertical surface of the colums , plinth beams (Back filling) walls and floor junction, external perimeters, along reatining wall @ 5.0 Liters/Sqm of the horizontal surface of basement top surface of the basement filling below flooring bed (Plinth) & @ 2.0 Litres/ Line meter at expansion joints. The substructure of a depth of 500mm around coulmns & 300mm deep around plinth beams, basements & floor filling area including excavation channel along the wall & rodding etc. cost & Conveyance of all materials to the site, cost of labour for sparying, rodding etc. complete for furnished item of work as per the approval of the Engineer-in-charge.

48

-

170.42

... More
Supplying, fitting and placing Fe - 500 HYSD bar reinforcement complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage,where they are not welded including cost and conveyance of steel, binding wire etc., lifting charges of steel , placing in position, tying with binding wire, all tools etc., and overheads & contractors profit complete for finished item of work( APSS No.126 )

1164.48

-

87.93

... More
Supply and placing of the Design Mix Concrete M20 (350kg Cement) corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. (BLD-CSTN-3-14) For Footing

1.2

-

8646.77

... More
For Columns

1.8

-

11666.35

... More
For Lintel

1.06

-

12323.31

... More
For Plinth Beam

2.45

-

11222.28

... More
For Roof Beam

1.22

-

10908.92

... More
For Roof slab

4.13

-

9742.48

... More
CR stone masonry in 2nd sort in CM (1:6) prop: (cement : sand) using hard granite stones from approved quarry including cost and conveyance of all materials like cement, sand water, granite stones, etc., from approved quarry to site and including labour for cutting stones to required size and shape, mixing of cement, mortar, construction, scaffolding charges, curing etc., and overheads & contractors profit, complete for finished item of work in foundation & basement. (APSS No. 615 & 601)

10.08

-

4355

... More
Supply & construction of Brick Masonry in CM (1:6) with 2nd class Bricks traditional size 23x11x7 2nd class with compressive of 37 Kgs / Sqcm from approved source including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504). (BLD-CSTN-5-4)

13.75

-

5981.12

... More
Plastering 12mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904)

82.4

-

345.33

... More
Plastering 20mm thick in two coats using screened sand with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc.,complete for External uneven surfaces of Brick wall and RCC exposed surface and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) for :- Plastering 2/c in CM(1:4) & (1:6) 20mm

33.6

-

468.79

... More
Flooring with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) of regular colours (other than black) set over a base coat of CM (1:8) prop. 20mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 Kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement, sand, water, granite, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying granite to required slope as directed by the Engineer- in-charge, cost of overheads & contractors profit etc., complete for finished item of work . (APSS No.701 & 707)

110.4

-

3703.82

... More
Plastering 25mm to 40mm thick base plastering 12mm to 20 mm in CM (1:3) and top finishing 12mm thick with CM (1:2) to bring the required ornamentation including fine rendering with neat cement cost and conveyanceof all materials, labour charges, all incidental and operational charges curing, lifting, scafolding charges etc. for external surface as per approved drawings and as directed during execution including preparation and fixing precast pillars, kudam,palakai, vedika. Lathalu in Uttara Eludhakam, pothikas, nasigudu. pupha puskala adihishtanam, wherever necessary and including overheads and contractors profit, excluding GST on all materials etc.Complete for finished item of work(as per silpi SSR 19-20) (1st class ornamentation work

134.56

-

1237.6

... More
Painting to new walls with 2 coats of acrylic emulsion paint of approved brand (Asian/Berger/Nerolac/Saicoat/Indocem or equivalent) and shade over base coat of approved cement primer grade-1 making 3 coats in all to give even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges , overheads & contractors profit etc., complete for finished item of work as per SS 911 Internal colouring

134.56

-

151.22

... More
Supply and Fixing of 25mm outer dia heavy (2.20mm thickness) grade, FRLS with IS:9537 part 3 regid PVC pipe (ISI mark) concealed in wall with all required accessories including masonary work for light, fan , common and separate plug point including all labour charges etc., complete. Makes : Sudhakar / Modi ( ISI mark).

25

-

86.82

... More
Supply and run of 2 of 36/0.3mm (2.5 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for mains inlcuding all labour charges etc., complete. Makes: Polycab /RPG / Million / Power Flex / Anchor / V-Guard.

25

-

74.59

... More
Supply and run of 2 of 140/0.3mm (10.0 Sqmm) PVC FRLS / HFFR insulated flexible Copper cable in existing pipe for mains including all labour charges etc., complete. Makes: :Polycab /RPG / Million / Power Flex / Anchor / V-Guard.

30

-

230.05

... More
Supply and fixing of 18W heavy duty LED Down lighter, suitable for Recessed / Surface mounting made of pressure diecast alluminium body with powder coating, acrylic diffuser with Driver as per IS: 15885 (Part 2/ Sec 13) : 2012 , operating voltage range of 150 to 265 Volts AC, P.F 0.9, Surge protection: 2KV, THD10% with high power LED's having efficacy of 80 lumins / watt, CCT: 3000K -5700K, minimum CRI 70, Luminaire performance complies to IS 10322 (Part 5 / Sec-3) etc., completea) LUMINAIRE MAKE : Pasolite / Cosmo / Siger/ Koncept/ Kiran/Vibrant/Leo/Lumens/Iliteb) LED MAKE : CREE / NICHIA / OSRAM / SAMSUNG / EVERLIGHT

4

-

1449

... More
Supply and fixing of 6A / 10A 3/2 Pin 2 Module Modular Socket with shutter with 6A / 10A 1 Way 1 Module Modular Switch control on a Common switch board with with 3 Module Hot Dip Galvanized Modular Metal Box covered with 3 Modular Cover Frame with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Modular Switch, Socket, Metal box & Cover frame Make:GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge.

2

-

472.69

... More
Supply and fixing of 7W LED COB Spot Light, suitable for Recessed mounting made of diecast alluminium body with powder coating, with Driver, operating voltage range of 150 to 265 Volts AC, CCT: 3000K - 5700K, minimum CRI70, .etc., complete Makes : Surya /C&S / Syska / Enrich / Stanjo / Polycab/ Ib LED/ Opple/R LED/Luker/ Orbit/Trinic/Panasonic b) LED MAKE : Bridge Lux / LUMILEDS / CREE / NICHIA / SAMSUNG/ Sunpo

10

-

920

... More
Earth work excavation for foundations (Manual Means) of buildings in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work including seigniorage excluding dewatering charges etc., as per SS 20 B(APSS 308)

19.56

-

238.32

... More
Conveyance of un-useful excavated earth to a distance of 2 KM for disposal including hire charges of T & P, labour charges etc., and overheads & contractors profit complete for finished item of work.

9.78

-

38.29

... More
Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

3.29

-

331.16

... More
Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 20mm size hard , machine crushed trap from approved quarry including cost and conveyance of all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402) ( (BLD-CSTN-3-5))

1.54

-

3978.18

... More
Supply and placing of the Design Mix Concrete M20 (350kg Cement) corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. (BLD-CSTN-3-14) Footings

2.61

-

8646.77

... More
Plinth beam

2.59

-

11222.28

... More
Columns

3.87

-

11666.35

... More
Roof beams

0.9

-

10908.92

... More
Slab

0.18

-

9742.48

... More
Supplying, fitting and placing Fe - 500 HYSD bar reinforcement complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage,where they are not welded including cost and conveyance of steel, binding wire etc., lifting charges of steel , placing in position, tying with binding wire, all tools etc., and overheads & contractors profit complete for finished item of work ( APSS No.126 )

1343.12

-

87.93

... More
Pre construction Anti termite is a process in which chemical toxic to subterrean termites is apply/ inject into soil during early stage of building Construction 2. Treatement of soil Beneath the building and around the foundations conduct and chemical use as per BIS - IS 6313 (Part -2) 2013 code specification & CIB RC registered termiticide which creates a continuous chemical barrier beneath the building which kills or repels terminates & impervious to tremite entry 3. Imidacloprid 30.5% SC (IS 63131) dissolve 2.1 Ml/1 liter of water and apply emulsion/solution @ 7.5 Litres/Square meter (Sqm) of internal, external vertical surface of the colums , plinth beams (Back filling) walls and floor junction, external perimeters, along reatining wall @ 5.0 Liters/Sqm of the horizontal surface of basement top surface of the basement filling below flooring bed (Plinth) & @ 2.0 Litres/ Line meter at expansion joints. The substructure of a depth of 500mm around coulmns & 300mm deep around plinth beams, basements & floor filling area including excavation channel along the wall & rodding etc. cost & Conveyance of all materials to the site, cost of labour for sparying, rodding etc. complete for furnished item of work as per the approval of the Engineer-in-charge.

17.75

-

170.42

... More
CR stone masonry in 2nd sort in CM (1:6) prop: (cement : sand) using hard granite stones from approved quarry including cost and conveyance of all materials like cement, sand water, granite stones, etc., from approved quarry to site and including labour for cutting stones to required size and shape, mixing of cement, mortar, construction, scaffolding charges, curing etc., and overheads & contractors profit, complete for finished item of work in foundation & basement. (APSS No. 615 & 601)

2.27

-

4355

... More
Supply & construction of Brick Masonry in CM (1:6) with 2nd class Bricks traditional size 23x11x7 2nd class with compressive of 37 Kgs / Sqcm from approved source including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504). (BLD-CSTN-5-4)

3.62

-

5981.12

... More
Plastering 25mm to 40mm thick base plastering 12mm to 20 mm in CM (1:3) and top finishing 12mm thick with CM (1:2) to bring the required ornamentation including fine rendering with neat cement cost and conveyanceof all materials, labour charges, all incidental and operational charges curing, lifting, scafolding charges etc. for external surface as per approved drawings and as directed during execution including preparation and fixing precast pillars, kudam,palakai, vedika. Lathalu in Uttara Eludhakam, pothikas, nasigudu. pupha puskala adihishtanam, wherever necessary and including overheads and contractors profit, excluding GST on all materials etc.Complete for finished item of work(as per silpi SSR 19-20) (1st class ornamentation work

28.2

-

1237.6

... More
Plastering 20mm thick in two coats using screened sand with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc.,complete for External uneven surfaces of Brick wall and RCC exposed surface and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) for :- Plastering 2/c in CM(1:4) & (1:6) 20mm

42.47

-

468.79

... More
Supply and fabricating steel works like Window Grills, Compound Wall Grills, Iron Doors, Windows including cost of welding rods, power charges, including cost of fixing in position including all cost and conveyance of materials and all labour charges for cutting, bending to required shape welding including cost of weilding rods griding etc complete with all taxes etc., complete for finished item of work as per the approval of the Engineer-in-Charge.

1512

-

106.35

... More
Painting with Priming Coat to given an even shade after throughly brushing the surface to remove all dirt and remains of losse powdered materials, including cost and conveyance of all materials to work site and all operational incidental labour charges etc., complete for finished item of work as per SS

33.2

-

59.31

... More
Painting with Synthetic Enamel paints -one coat - for New wood work, old wood work & New Iron work to given an even shade after throughly brushing the surface to remove all dirt and remains of losse powdered materials, including cost and conveyance of all materials to work site and all operational incidental labour charges etc., complete for finished item of work as per SS

33.2

-

63.18

... More
Supply and installation of Best tiled roofing with mangalore tiles (BLUE color)inlcuding CM.

12

-

2216.3

... More
Providing and applying synthetic plaster putty or plaster of paris putty or lime punning of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for Internal walls

70.67

-

200.02

... More
Painting to new walls with 2 coats of acrylic emulsion paint of approved brand (Asian/Berger/Nerolac/Saicoat/Indocem or equivalent) and shade over base coat of approved cement primer grade-1 making 3 coats in all to give even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges , overheads & contractors profit etc., complete for finished item of work as per SS 911 Internal colouring

70.67

-

151.22

... More
Supply and Fixing of 25mm outer dia heavy (2.20mm thickness) grade, FRLS with IS:9537 part 3 regid PVC pipe (ISI mark) concealed in wall with all required accessories including masonary work for light, fan , common and separate plug point including all labour charges etc., complete. Makes : Sudhakar / Modi ( ISI mark).

25

-

86.82

... More
Supply and run of 2 of 36/0.3mm (2.5 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for mains inlcuding all labour charges etc., complete. Makes: Polycab /RPG / Million / Power Flex / Anchor / V-Guard.

25

-

74.59

... More
Supply and run of 2 of 140/0.3mm (10.0 Sqmm) PVC FRLS / HFFR insulated flexible Copper cable in existing pipe for mains including all labour charges etc., complete. Makes: :Polycab /RPG / Million / Power Flex / Anchor / V-Guard.

30

-

230.05

... More
Supply and fixing of 18W heavy duty LED Down lighter, suitable for Recessed / Surface mounting made of pressure diecast alluminium body with powder coating, acrylic diffuser with Driver as per IS: 15885 (Part 2/ Sec 13) : 2012 , operating voltage range of 150 to 265 Volts AC, P.F 0.9, Surge protection: 2KV, THD10% with high power LED's having efficacy of 80 lumins / watt, CCT: 3000K -5700K, minimum CRI 70, Luminaire performance complies to IS 10322 (Part 5 / Sec-3) etc., completea) LUMINAIRE MAKE : Pasolite / Cosmo / Siger/ Koncept/ Kiran/Vibrant/Leo/Lumens/Iliteb) LED MAKE : CREE / NICHIA / OSRAM / SAMSUNG / EVERLIGHT

8

-

1449

... More
Supply and fixing of 6A / 10A 3/2 Pin 2 Module Modular Socket with shutter with 6A / 10A 1 Way 1 Module Modular Switch control on a Common switch board with with 3 Module Hot Dip Galvanized Modular Metal Box covered with 3 Modular Cover Frame with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Modular Switch, Socket, Metal box & Cover frame Make:GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge.

1

-

472.69

... More
Supply and fixing of 7W LED COB Spot Light, suitable for Recessed mounting made of diecast alluminium body with powder coating, with Driver, operating voltage range of 150 to 265 Volts AC, CCT: 3000K - 5700K, minimum CRI70, .etc., complete Makes : Surya /C&S / Syska / Enrich / Stanjo / Polycab/ Ib LED/ Opple/R LED/Luker/ Orbit/Trinic/Panasonic b) LED MAKE : Bridge Lux / LUMILEDS / CREE / NICHIA / SAMSUNG/ Sunpo

14

-

920

... More
Earth work excavation for foundations (Manual Means) of buildings in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work including seigniorage excluding dewatering charges etc., as per SS 20 B(APSS 308)

288.29

-

238.32

... More
Earth work excavation for foundations (Mechnical Means) of buildings in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work including seigniorage excluding dewatering charges etc., as per SS 20 B(APSS 308)

1153.17

-

115.36

... More
Providing Sand filling below foundation, behind abutment and return walls in layers including cost of all materials, machinery, labour, watering, ramming etc., complete with initial lead upto 50 m and initial lift upto 3 m.

82.01

-

597.3

... More
Plain Cement Concrete (1:3:6) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 20mm size nominal aggregate machine crushed hard granite metal (coarse aggregate) from approved quarry from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, excluding seigniorage charges, sales & other taxes on all materials and including all charges for mixing, laying concrete, curing etc., complete for finished item of work. (APSS No. 402) for:-Hand Mix-PCC (1:3:6) NOMINAL MIX

129.9

-

3978.18

... More
Supply and placing of the Design Mix Concrete M20 (350kg Cement) corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. (BLD-CSTN-3-14) For Footing

128.63

-

8646.77

... More
For Columns

67.2

-

11666.35

... More
For Plinth Beam

78.4

-

11222.28

... More
Supplying, fitting and placing Fe - 500 HYSD bar reinforcement complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage,where they are not welded including cost and conveyance of steel, binding wire etc., lifting charges of steel , placing in position, tying with binding wire, all tools etc., and overheads & contractors profit complete for finished item of work ( APSS No.126 )

13711.85

-

87.93

... More
Supply & construction of Brick Masonry in CM (1:6) with 2nd class Bricks traditional size 23x11x7 2nd class with compressive of 37 Kgs / Sqcm from approved source including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504). (BLD-CSTN-5-4)

511.34

-

5981.12

... More
CR stone masonry in 2nd sort in CM (1:6) prop: (cement : sand) using hard granite stones from approved quarry including cost and conveyance of all materials like cement, sand water, granite stones, etc., from approved quarry to site and including labour for cutting stones to required size and shape, mixing of cement, mortar, construction, scaffolding charges, curing etc., and overheads & contractors profit, complete for finished item of work in foundation & basement. (APSS No. 615 & 601)

153.4

-

4355

... More
Plastering 20mm thick in two coats using screened sand with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc.,complete for External uneven surfaces of Brick wall and RCC exposed surface and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) for :- Plastering 2/c in CM(1:4) & (1:6) 20mm

6340

-

468.79

... More
Painting to new walls with 2 coats of acrylic emulsion paint of approved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for external walls for:-External Colouring - acrylic emulsion paint - 3 Coats

6340

-

162.32

... More
Supply and fabricating steel works like Window Grills, Compound Wall Grills, Iron Doors, Windows including cost of welding rods, power charges, including cost of fixing in position including all cost and conveyance of materials and all labour charges for cutting, bending to required shape welding including cost of weilding rods griding etc complete with all taxes etc., complete for finished item of work as per the approval of the Engineer-in-Charge.

15850

-

106.35

... More
Painting with Synthetic Enamel paints -one coat - for New wood work, old wood work & New Iron work to given an even shade after throughly brushing the surface to remove all dirt and remains of losse powdered materials, including cost and conveyance of all materials to work site and all operational incidental labour charges etc., complete for finished item of work as per SS

475.5

-

63.18

... More
Earth work excavation for foundations (Manual Means) of building foundations, footings, walls, sump, compound wall in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting etc., as per GFC drawings issued by the Employer and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308)

67

-

238.32

... More
Filling with Sand in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

416.5

-

597.3

... More
Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. as per GFC drawings issued by the Employer to site, including sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed of 0.1m layer ramming finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402)

49.98

-

3978.18

... More
Flooring with precast concrete blocks for paving of M-35 grade and thickness not less than 60 mm for light traffic areas conforming to IS 15658:2006 in all shapes and designs as per the manufacturer's specification including Labour charges for laying & fixing of precast concrete blocks for paving of all grades, any thickness, all sizes & shapes including all labour charges for loading & unloading, laying to desired lines and levels complete excluding cost of cement, sand, water, electricity etc and all operational, incidental, labour charges etc., complete for finished item of work as per (APSS No.709)

4165

-

635.61

... More
Cast in Situ Cement Concrete M20 Kerb - Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408 MORTH

1666

-

297.27

... More
Earth work excavation for foundations (Manual Means) of buildings in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work including seigniorage excluding dewatering charges etc., as per SS 20 B(APSS 308)

34.13

-

238.32

... More
Earth work excavation for foundations (Mechnical Means) of buildings in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work including seigniorage excluding dewatering charges etc., as per SS 20 B(APSS 308)

79.64

-

115.36

... More
Conveyance of un-useful excavated earth to a distance of 2 KM for disposal including hire charges of T & P, labour charges etc., and overheads & contractors profit complete for finished item of work.

56.88

-

38.29

... More
Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

76.14

-

331.16

... More
Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 20mm size hard , machine crushed trap from approved quarry including cost and conveyance of all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402) ( (BLD-CSTN-3-5))

21.49

-

3978.18

... More
Pre construction Anti termite is a process in which chemical toxic to subterrean termites is apply/ inject into soil during early stage of building Construction 2. Treatement of soil Beneath the building and around the foundations conduct and chemical use as per BIS - IS 6313 (Part -2) 2013 code specification & CIB RC registered termiticide which creates a continuous chemical barrier beneath the building which kills or repels terminates & impervious to tremite entry 3. Imidacloprid 30.5% SC (IS 63131) dissolve 2.1 Ml/1 liter of water and apply emulsion/solution @ 7.5 Litres/Square meter (Sqm) of internal, external vertical surface of the colums , plinth beams (Back filling) walls and floor junction, external perimeters, along reatining wall @ 5.0 Liters/Sqm of the horizontal surface of basement top surface of the basement filling below flooring bed (Plinth) & @ 2.0 Litres/ Line meter at expansion joints. The substructure of a depth of 500mm around coulmns & 300mm deep around plinth beams, basements & floor filling area including excavation channel along the wall & rodding etc. cost & Conveyance of all materials to the site, cost of labour for sparying, rodding etc. complete for furnished item of work as per the approval of the Engineer-in-charge.

402.9

-

170.42

... More
Supply and placing of the Design Mix Concrete M20 (350kg Cement) corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. (BLD-CSTN-3-14) FOOTINGS

9.88

-

8646.77

... More
PLINTH BEAMS

9.18

-

11222.28

... More
COLUMNS

5.59

-

11666.35

... More
ROOF BEAMS

11.19

-

10908.92

... More
LINTEL BEAMS

1.76

-

12323.31

... More
SLAB

19.35

-

9742.48

... More
Supplying, fitting and placing Fe - 500 HYSD bar reinforcement complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage,where they are not welded including cost and conveyance of steel, binding wire etc., lifting charges of steel , placing in position, tying with binding wire, all tools etc., and overheads & contractors profit complete for finished item of work ( APSS No.126 )

6487.06

-

87.93

... More
Damp proof course 50mm thick with 1:2:4 cement concrete Nominal mix, using 12mm hard broken stone aggregate including cost of all materials, seigniorage charges, excluding conveyance charges of materials including the cost of machinery, labour charges, mixing, placing in position, leveling, vibrating, curing etc. complete for finished item of work. (Using concrete mixer)

13.2

-

200.35

... More
CR stone masonry in 2nd sort in CM (1:6) prop: (cement : sand) using hard granite stones from approved quarry including cost and conveyance of all materials like cement, sand water, granite stones, etc., from approved quarry to site and including labour for cutting stones to required size and shape, mixing of cement, mortar, construction, scaffolding charges, curing etc., and overheads & contractors profit, complete for finished item of work in foundation & basement. (APSS No. 615 & 601)

7.92

-

4355

... More
Supply & construction of Brick Masonry in CM (1:6) with 2nd class Bricks traditional size 23x11x7 2nd class with compressive of 37 Kgs / Sqcm from approved source including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504). (BLD-CSTN-5-4)

62.78

-

5981.12

... More
Plastering 12mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904)

352.75

-

345.33

... More
Plastering 20mm thick in two coats using screened sand with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc.,complete for External uneven surfaces of Brick wall and RCC exposed surface and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) for :- Plastering 2/c in CM(1:4) & (1:6) 20mm

202.25

-

468.79

... More
Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903).

150

-

493.79

... More
Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick including neat cement slurry of honey like consistancy spread at the rate of 3.3kg per Sqm and filling the joints with white cement mixed with pigment of matching shade to match the shade of tiles over a bed of C.C. or R.C.C. slab, including cost and conveyance of all materials like cement, sand, water, ceramic tiles, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer-in-charge curing etc., complete and cost of overheads and contractor profit for finished item of work. (APSS No.707 & 701)

37.68

-

943.15

... More
Dadooing to walls withglazed red or white full body ceramic wall tiles of Size 300 x 450 mm / 320 mm x 400 mm and thickness 6 mm and 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of C.M (1:5) proportion, 12mm thick and neat grey cement slurry of honey like consistency, spread at the rate of 3.3Kgs per Sqm and jointed with white cement or coloured cement to match the shade of the tiles, including cost and conveyance of all materials like cement, sand, water, tiles, coloured cement, overheads & contractors profit etc., to site, all labour charges for mixing of cement mortar, laying glazed tiles to level, curing etc., complete for finished item of work as directed by Engineer-in-charge.

37.68

-

663.99

... More
Flooring with vitrified polished/Semi-polished floor tiles of 1st quality and make as approved by Engineer-in-charge of size not less than 600 mm x 600 mm , 8-10 mm thickness of any color finish and all shades and designs with borders and design as per the approved flooring pattern as directed by the Engineer-In -Charge set over a base coat of CM (1:8) prop. 12mm thick using screened sand over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 Kgs per Sqm. and jointed neately with white cement paste to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, white cement etc., to site (excluding cost of C.C. bed) and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge etc.,and overheads & contractors profit complete for finished item of work. (APSS No.701 & 707)

78.24

-

1238.39

... More
Providing skirting to internal walls to 15 cm height with vitrified tiles 8mm thick , regular finish and normal colour, length equal to flooring tiles, set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 Kgs per Sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc.,and overheads & contractors profit complete excluding seigniorage charges etc., complete for finished item of work.(APSS No.701 &707)

12.75

-

1240.88

... More
Supply and fabricating steel works like Window Grills, Compound Wall Grills, Iron Doors, Windows including cost of welding rods, power charges, including cost of fixing in position including all cost and conveyance of materials and all labour charges for cutting, bending to required shape welding including cost of weilding rods griding etc complete with all taxes etc., complete for finished item of work as per the approval of the Engineer-in-Charge.

240

-

106.35

... More
Painting with Priming Coat to given an even shade after throughly brushing the surface to remove all dirt and remains of losse powdered materials, including cost and conveyance of all materials to work site and all operational incidental labour charges etc., complete for finished item of work as per SS

14.49

-

59.31

... More
Painting with Synthetic Enamel paints -one coat - for New wood work, old wood work & New Iron work to given an even shade after throughly brushing the surface to remove all dirt and remains of losse powdered materials, including cost and conveyance of all materials to work site and all operational incidental labour charges etc., complete for finished item of work as per SS

14.49

-

63.18

... More
Supplying and fixing FOLDABLE SHUTTER DOOR using Medium Teak wood Door Frame section of 125*75 MM is fixed to wall using MS Z Hold fast 300 MM long. including Door top arch with tinted glass of 5MM thickness , Medium Teak wood door shutters - 35 mmthick as per drawing including cost of Brass fixtures such as 12 Nos. Butt hinges 125mm long, 4 No tower bolt of 200x10mm dia, 1 No. Aldrops - 300 mm long, 1No. Latche-300mm long, 6 Nos. handles of 150 mm size & 1 Nos. Heavy duty door stoppers including fixing the fixtures to door with required no. of screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc., complete for finished item of work. (Door size 1.5 X 2.7m)

17.85

-

14266.49

... More
Supply & applying Melamine Polish Glossy/ Matt finish to the wood works duly cleaning the surface and applying emery paper, Sand the wood with 180 No., emery paper and then with 320 No., emery paper, clean & wipe off loose dust, applying suitable knifing paste filler / wood filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper, apply two component wood sealer, air dry for 24 hrs, Sand with 320 No emery paper, applying one coat of approved spraying thinner (for spraying)/ applying one coat of approved brushing thinner or general purpose thinner (for brushing) and apply (either with spray or brush) two coats of approved brand melamine including cost & labour charges, emery papers, cost of thinner & melamine polish of approved brands such as Jenson & Nicholson, Asian Paints, Berger Paints or equivalent etc., complete for finished item of work

35.7

-

1257.51

... More
Providing and fixing factory made uPVC white colour sliding glazed doorcomprising of uPVC multi-chambered frame with in-built roller track andsash extruded profiles duly reinforced with 1.60 ± 0.2 mm thick galvanizedmild steel section made from roll forming process of required length (shape & size according to uPVC profile), appropriate dimension uPVCextruded glazing beads, uPVC extruded interlock and uPVC extrudedInline sash adaptor (if required), EPDM gasket, wool pile, zinc alloy(white powder coated) handle with key on one side of extreme panels along with zinc plated mild steel multi point locking having transmissiongear with keeps, zinc alloy (white powder coated) cresent lock (ifrequired), stainless steel (SS 304 grade) body with adjustable doublenylon rollers (weight bearing capacity to be 120 kg), G.I fasteners 100 x 8 mm size for fixing frame to finished wall and necessary stainless steelscrews etc. Profile of frame & sash shall be mitred cut and fusion weldedat all corners, including drilling of holes for fixing hardware's and drainageof water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled with weather proof silicon sealent over backerrod of required size and of approved quality, all complete as per approveddrawing & direction of Engineerin-Charge inclusive of cost of Single / double glass panes,wire mesh and silicon sealent . Note: For uPVC frame and sash extruded profiles minus 5% tolerancein dimension i.e. in depth & width of profile shall be acceptable. Variationin profile dimension in higher side shall be accepted but no extra payment on this account shall be made. BMT-N.85

11.25

-

7948.51

... More
Three track three panels sliding door with fly proof S.S wire mesh (Two Nos. glazed & one no. wire mesh panels) made of(big series) frame 116 x 45 mm & sash 46 x 82 mm both having wall thickness of 2.3 ± 0.2 mm and single glazing bead / double glazing bead of appropriate dimension. (Area of door above 2.00 Sqm upto 5.00 Sqm)

-

-

-

... More
Providing & fixing internal prelaminated PVC door frame of size 100 x 45 mm with a wall thickness of 5mm, made of extruded 5 mm Prelam PVC foam sheet, mitred cut at two corners and joined with two Nos. of 150mm long brackets of 15 x 15 mm MS square tube, two vertical door profiles reinforced with 40 x 20 MS Tube of 19 guage throughout the frame and the door frame fixed to the wall using 65/100mm long MS screws through the frame by using PVC fasteners with a minimum of 3 Nos of screws provided for each vertical member and two Nos. for horizontal, etc complete as per drawing and direction of Engineer in Charge

43.4

-

624.88

... More
Providing and fixing 35mm thick BRAND FACTORY MADE SOLID SINGLE SIDE PRELAM PANEL PVC DOOR SHUTTER consisting of frame made out of MS. Tubes of 19gauge thickness and size of 19mmX19mm for stiles, and 15mmX15mm for top and bottom rails. The MS. Frame shall have a coat of steel primers of approved make and manufacture. MS. Frame covered with 5mm thick heat moulded single side Prelam Pac ‘C’ channel of size 30mmX50mm to form stiles.5mm thick& 75mm wide single side prelim Pac sheets shall be for the top, bottom and lock rails. Panelling of 5mm thick one side Pac sheet to be fitted in the MS. Frame and sealed to the front (prelam side) stiles and rails (which should have a 5mm 45 bent portion as beading) and attached to the back(white/ivory) stiles and rails which should have a 10mm 900 bent portion as beading ) using 2Nos. 15mm wide X 5mm thick Pac sheet beading inside the 90 bent beading. All stiles, rails and beadings are to be joined to the panel using solvent cement etc. an additional 5mm thick Pac strip of 20mm width to be stuck on the interior side of the ‘C” channel using Pac solvent cement adhesive and 10mm(5mmX2) thick, 20mm wide cross Pac sheet to be fitted as gap insert for top and bottom rail etc. complete as per direction of Engineer –in-Charge, manufacture specification and drawing.

14.7

-

1598.24

... More
Providing and applying synthetic plaster putty or plaster of paris putty or lime punning of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for Internal walls

352.75

-

200.02

... More
Supply and installation of Best tiled roofing with mangalore tiles (rustic green color)inlcuding CM.

4

-

2216.3

... More
Painting to new walls with 2 coats of acrylic emulsion paint of approved brand (Asian/Berger/Nerolac/Saicoat/Indocem or equivalent) and shade over base coat of approved cement primer grade-1 making 3 coats in all to give even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges , overheads & contractors profit etc., complete for finished item of work as per SS 911 Internal colouring

352.75

-

151.22

... More
Painting to new walls with 2 coats of Acrylic emulsion paint of approved brand (Asian/Berger/Nerolac/Saicoat/Indocem or equivalent) and shade over base coat of approved cement primer grade-1 making 3 coats in all to give even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges , overheads & contractors profit etc., complete for finished item of work as per SS 911 External colouring

202.25

-

162.32

... More
Plastering 25mm to 40mm thick base plastering 12mm to 20 mm in CM (1:3) and top finishing 12mm thick with CM (1:2) to bring the required ornamentation including fine rendering with neat cement cost and conveyanceof all materials, labour charges, all incidental and operational charges curing, lifting, scafolding charges etc. for external surface as per approved drawings and as directed during execution including preparation and fixing precast pillars, kudam,palakai, vedika. Lathalu in Uttara Eludhakam, pothikas, nasigudu. pupha puskala adihishtanam, wherever necessary and including overheads and contractors profit, excluding GST on all materials etc.Complete for finished item of work(as per silpi SSR 19-20) (1st class ornamentation work

8.64

-

1237.6

... More
Providing and fixing of top hung Ventilators made of pre-painted steel (Base steel as per IS 513 of 0.80 mm thick galvanized as per IS 277 with Zinc of 120 GSM), finish painted with a polyester paint of 60-65 microns thick and section for outer frame of 80 x 45 mm, centre mullion of 80 x 60 mm, section for shutter of 52 x 25 mm x 0.6 mm thick, outer frame and mullions to have rebate for glazed shutter with a provision for guard bars/grills and the sections cut to length metre joined with corner bracket, centre mullion fixed with mullion cap, 1 No. of High grade nylon latch handle, window stopper, 2 Nos. of with MS Powder coated /SS ball bearing butt Hinges provided per shutter and windows fitted with 4 mm thick plain float glass with rubber gaskets including fixing the frames in concrete/masonry wall by means of self expanding screws, Including 10 mm Square guard bars with 6” (152.4mm) pitch etc., complete for finished item of work.

2.4

-

6305.63

... More
Supplying & Fixing Orissa Pan white glazed W.C 1st quality ISI marked conforming to IS:2556-Part-3-1981 with "P" or "S" trap Hindware/ Parryware/ Neycer - ISI Mark: 580 mm x 440 mm including Brick masonry seat for Orissa pan/ Indian W.C. using 2nd class bricks as per standard practice, PVC low level system with internal components & short bend: 10 Litres capacity Single Flush, 15 mm PVC connection with brass union nut C.P coated and 15mm CP finish brass stop valve. Complete for finished item of work. Make:Neycer/Parryware/Jaquar/CERA/Hindustan Sanitaryware

2

-

3589.1

... More
Supply, Installation and commissioning approved make floor mounted close coupled EWC suit CASCADE model 'P' or 'S' trap with dual flush porcelain cistern fixed on EWC with all internal parts of dual flush cistern, ultra solid seat cover of approvedmake with rubber buffer and cap 15 mm angle stop cock 450 mm long PVC inter connection pipe wall flanges all of approved make etc. complete for finished item of work in all respects: Special Colour - Grade - III

4

-

9834.51

... More
Supplying & Fixing Indian makeFlat Back Wash Hand Basin1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain,32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block: 630 x 450 mm - Double C.P. Pillar cock

5

-

3036.93

... More
Supplying and fixing NP bib taps of size 12.70mm dia of Indian make Seiko or equivalent including cost and conveyance of all materials, labour charges etc., complete for finished item of work in all floors.

6

-

682.01

... More
Providing & Placing on Terrace(at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks

1000

-

6.82

... More
Supplying & fixing Ashirvad/Astral flow guard for equivalent CPVC Pipes with fittings in ground or on wall including cost of tees, elbows, bends, reducers, couplings, running joints, union flanges, unions etc. with necessary excavation in all types of soils except rock requiring blasting, refilling, chiselling masonry walls and making good the walls & floors to the original surface and fixing MS clamps on TW blocks on walls including cost and conveyance of all materials and labour charges complete for finished item of work.complete 15.90 mm dia CPVC SDR 11.00

40

-

72.71

... More
22.20 mm dia CPVC SDR 11.00

50

-

110.21

... More
54 mm dia CPVC SDR 11.00

50

-

574.89

... More
Supplying and fixing PPR Ball valve as per ISI Class - I , Indian make heavy type including cost and conveyance of all materials , labour charges etc. complete for finished item of work 25mm PPR Ball valve

2

-

244.27

... More
32mm PPR Ball valve

1

-

257.91

... More
50mm PPR Ball valve

1

-

613.52

... More
S & F 3" (76.2 mm ) Nahany Trap with Jali - UPVC/SWR Pipe fittings

6

-

135.2

... More
S&F 110 mm dia 3 MDouble Socket PVC/SWR pipe - 6 Kg/sq.cm

28

-

1004.36

... More
S&F 75 mm dia 1828.8 mm (6'-0") Single Socket PVC/SWR pipe- 6 Kg/sq.cm

40

-

373.79

... More
Constructing 904.0 mm (3’0”) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mmincluding plastering with cement mortar 1:3 prop; ½” thick both inside and outside fitted with 20” dia RCC manhole covers and frames including excavating pits up to a depth of 1524 mm (5'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification andincluding cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental andoperational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work as per Standard specification.

5

-

10262.84

... More
Supplying & fixing 150 mm x 100 mm SWG gully trapsconforming to ISI 651 & 4127 with C.I Grating & Cost. Brick masonry in CM 1:6 prop. Intermediate chamber and fitted with304.8 mm x 288.6mm (12"x9") C.I Frame and hinged cover

4

-

577.16

... More
Supply of SWG Plugs conforming to IS standards for 150 mm dia

6

-

62.49

... More
Labour charges for fixing and laying the SWG Junctions/ Plugs/ Bends of any dia with airtight cement joints as per standard practice

6

-

36.36

... More
Lowering the RCC plain ended pipes carefully into the trench laying them true to alignment and gradient, jointing RCC pipes with cement joints including curing, the cost of jointing materials i.e., Cement Mortar (1:1.5), hemp yarn etc., and testing including filling with water with a water lead up to 500 Meters excluding cost of rubber rings as per BIS No.783/85.

45

-

163.61

... More
Manufacture, Supply and Delivery of R.C.C. Plain ended pipes conforming to B.I.S 458/2003,Ex -factory, excluding transportation and all taxes. (NP-2 Class - 150mm dia ).

45

-

214.73

... More
Supply and Fixing of 25mm outer dia heavy (2.20mm thickness) grade, FRLS with IS:9537 part 3 regid PVC pipe (ISI mark) concealed in wall with all required accessories including masonary work for light, fan , common and separate plug point including all labour charges etc., complete. Makes : Sudhakar / Modi ( ISI mark).

200

-

86.82

... More
Supply and fixing of 6A / 10A 3/2 Pin 2 Module Modular Socket with shutter with 6A / 10A 1 Way 1 Module Modular Switch control on a Common switch board with with 3 Module Hot Dip Galvanized Modular Metal Box covered with 3 Modular Cover Frame with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Modular Switch, Socket, Metal box & Cover frame Make:GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge.

16

-

472.69

... More
Supply and Fixing of 20A 2 Module Modular Socket with shutter and 16A / 20A 1 Way 1 Module Modular Switch duly recessed in wall with 3 Module Hot Dip Galvanized Modular Metal Box size covered with 3 Modular Cover Frame including earth connections and all labour charges etc., complete.[ Power plug ]Modular Switch,socket,metal box & Cover frame Make:GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge.

6

-

655.5

... More
Supply and run of 2 of 36/0.3mm (2.5 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for mains inlcuding all labour charges etc., complete. Makes: Polycab /RPG / Million / Power Flex / Anchor / V-Guard.

240

-

74.59

... More
Supply and run of 2 of 140/0.3mm (10.0 Sqmm) PVC FRLS / HFFR insulated flexible Copper cable in existing pipe for mains including all labour charges etc., complete. Makes: :Polycab /RPG / Million / Power Flex / Anchor / V-Guard.

100

-

230.05

... More
Fixing of 20W/18W led tube light luminaire on wall / Ceiling with / TW /PVC round blocks with all accessories including giving connections and all labour charges etc., complete.

16

-

147.59

... More
Supply and transportation of 20W, 2000 lumins, 1200mm length, T8 LED tube light fitting with extruded alluminium housing, input voltage AC 165 - 260 Volts with 0.9 PF with driver and frosted cover etc., complete with 3 years warranty. Luminaire Make : Phillips / Osram / GE / Crompton /VIN / Bajaj / Havells / Halonix.

16

-

792

... More
Supply and fixing of 18W heavy duty LED Down lighter, suitable for Recessed / Surface mounting made of pressure diecast alluminium body with powder coating, acrylic diffuser with Driver as per IS: 15885 (Part 2/ Sec 13) : 2012 , operating voltage range of 150 to 265 Volts AC, P.F 0.9, Surge protection: 2KV, THD10% with high power LED's having efficacy of 80 lumins / watt, CCT: 3000K -5700K, minimum CRI 70, Luminaire performance complies to IS 10322 (Part 5 / Sec-3) etc., completea) LUMINAIRE MAKE : Pasolite / Cosmo / Siger/ Koncept/ Kiran/Vibrant/Leo/Lumens/Iliteb) LED MAKE : CREE / NICHIA / OSRAM / SAMSUNG / EVERLIGHT

2

-

1449

... More
Supply of 12" (300mm) Light duty exhaust fan with wire guard etc complete etc., complete. Makes : Crompton / Bajaj Bahar WG / Havells Ventil Air-DB / Orient hill air.

3

-

1668

... More
Labour charges for fixing of Exhaust fan in wall with necessary connections etc., complete ( for hole already made available).

3

-

396.68

... More
Supply and fixing of 4 Way VTPN DB suitable for accomodating 125A 4 Pole MCCB as incomer and 63A,10KA, TP MCBs-4 Nos as outgoing and with IP 43 Protection including internal connection and labour charges for surface / flush mounting etc., complete. Incommer: 125A,4P,25KA MCCB-1No. Outgoing: 63A, 10KA , TP MCB's -4 Nos DB Makes : Legrand / Schneider. MCCB Make: L&T / Schneider / Siemens / Legrand. MCB Make: Legrand-DX3 / Schneider-Acti9.

1

-

23401

... More
Supply of 48" (1200mm) Sweep decorative Ceiling Fan, with double ball bearings with all accessories without Regulator. Makes: Crompton HS Decora / Bajaj Regal Star / Havells Spark deco / Orient summer crown /Halonix(Zephyr) /Polycab(India Glory) /G.M. (G-Storm)

4

-

2645

... More
Labour charges for Fixing of Ceiling fan and regulator including transportation and giving connections with twin core wire etc., complete.

4

-

167.81

... More
Supply and fixing of 7W LED COB Spot Light, suitable for Recessed mounting made of diecast alluminium body with powder coating, with Driver, operating voltage range of 150 to 265 Volts AC, CCT: 3000K - 5700K, minimum CRI70, .etc., complete Makes : Surya /C&S / Syska / Enrich / Stanjo / Polycab/ Ib LED/ Opple/R LED/Luker/ Orbit/Trinic/Panasonic b) LED MAKE : Bridge Lux / LUMILEDS / CREE / NICHIA / SAMSUNG/ Sunpo

6

-

920

... More
Supply of 1 Module Modular type Electronic step type Fan Regulator with 2 Module Hot Dip Galvanized Modular Metal Box covered with 2 modular cover frame etc., complete.Makes : GM Four-Five / Legrand Arteor / SchneiderZen celo / MK Blenge.

4

-

624

... More
Providing independent earthing by excavating a trench to a depth of 2.1 M in all soils, as per size specified in the Data, using 40mm dia 'B' class GI pipe of 2.5 Mtrs length with necessary accessories with hume pipe ring duly providing staggered holes including filling with equal proportion of Salt and Charcoal in layers and all labour charges etc., complete for small quarters.

1

-

3821.56

... More
Earth work excavation for foundations (Manual Means) of buildings in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work including seigniorage excluding dewatering charges etc., as per SS 20 B(APSS 308)

49.72

-

238.32

... More
Earth work excavation for foundations (Mechnical Means) of buildings in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work including seigniorage excluding dewatering charges etc., as per SS 20 B(APSS 308)

87.89

-

115.36

... More
Conveyance of un-useful excavated earth to a distance of 2 KM for disposal including hire charges of T & P, labour charges etc., and overheads & contractors profit complete for finished item of work.

82.86

-

38.29

... More
Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

151.84

-

331.16

... More
Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 20mm size hard , machine crushed trap from approved quarry including cost and conveyance of all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402) ( (BLD-CSTN-3-5))

24.77

-

3978.18

... More
Pre construction Anti termite is a process in which chemical toxic to subterrean termites is apply/ inject into soil during early stage of building Construction 2. Treatement of soil Beneath the building and around the foundations conduct and chemical use as per BIS - IS 6313 (Part -2) 2013 code specification & CIB RC registered termiticide which creates a continuous chemical barrier beneath the building which kills or repels terminates & impervious to tremite entry 3. Imidacloprid 30.5% SC (IS 63131) dissolve 2.1 Ml/1 liter of water and apply emulsion/solution @ 7.5 Litres/Square meter (Sqm) of internal, external vertical surface of the colums , plinth beams (Back filling) walls and floor junction, external perimeters, along reatining wall @ 5.0 Liters/Sqm of the horizontal surface of basement top surface of the basement filling below flooring bed (Plinth) & @ 2.0 Litres/ Line meter at expansion joints. The substructure of a depth of 500mm around coulmns & 300mm deep around plinth beams, basements & floor filling area including excavation channel along the wall & rodding etc. cost & Conveyance of all materials to the site, cost of labour for sparying, rodding etc. complete for furnished item of work as per the approval of the Engineer-in-charge.

244.83

-

170.42

... More
Supplying, fitting and placing Fe - 500 HYSD bar reinforcement complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage,where they are not welded including cost and conveyance of steel, binding wire etc., lifting charges of steel , placing in position, tying with binding wire, all tools etc., and overheads & contractors profit complete for finished item of work ( APSS No.126 )

10255.72

-

87.93

... More
Supply and placing of the Design Mix Concrete M20 (350kg Cement) corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. (BLD-CSTN-3-14)For Footing

15.71

-

8646.77

... More
For Columns

12.3

-

11666.35

... More
For Lintel

3.14

-

12323.31

... More
For Plinth Beam

7.23

-

11222.28

... More
For Roof Beam

22.32

-

10908.92

... More
For Roof Slab

33.5

-

9742.48

... More
Damp proof course 50mm thick with 1:2:4 cement concrete Nominal mix, using 12mm hard broken stone aggregate including cost of all materials, seigniorage charges, excluding conveyance charges of materials including the cost of machinery, labour charges, mixing, placing in position, leveling, vibrating, curing etc. complete for finished item of work. (Using concrete mixer)

36

-

200.35

... More
CR stone masonry in 2nd sort in CM (1:6) prop: (cement : sand) using hard granite stones from approved quarry including cost and conveyance of all materials like cement, sand water, granite stones, etc., from approved quarry to site and including labour for cutting stones to required size and shape, mixing of cement, mortar, construction, scaffolding charges, curing etc., and overheads & contractors profit, complete for finished item of work in foundation & basement. (APSS No. 615 & 601)

14.9

-

473.6

... More
Supply & construction of Brick Masonry in CM (1:6) with 2nd class Bricks traditional size 23x11x7 2nd class with compressive of 37 Kgs / Sqcm from approved source including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504). (BLD-CSTN-5-4)

95.81

-

5981.12

... More
Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903).

350

-

493.79

... More
Providing and fixing factory made uPVC white colour sliding glazed Windows comprising of uPVC multi-chambered frame with in-built roller track andsash extruded profiles duly reinforced with 1.60 ± 0.2 mm thick galvanizedmild steel section made from roll forming process of required length (shape & size according to uPVC profile), appropriate dimension uPVCextruded glazing beads, uPVC extruded interlock and uPVC extrudedInline sash adaptor (if required), EPDM gasket, wool pile, zinc alloy(white powder coated) handle with key on one side of extreme panels along with zinc plated mild steel multi point locking having transmissiongear with keeps, zinc alloy (white powder coated) cresent lock (ifrequired), stainless steel (SS 304 grade) body with adjustable doublenylon rollers (weight bearing capacity to be 120 kg), G.I fasteners 100 x 8 mm size for fixing frame to finished wall and necessary stainless steelscrews etc. Profile of frame & sash shall be mitred cut and fusion weldedat all corners, including drilling of holes for fixing hardware's and drainageof water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled with weather proof silicon sealent over backerrod of required size and of approved quality, all complete as per approveddrawing & direction of Engineerin-Charge inclusive of cost of Single / double glass panes,wire mesh and silicon sealent . Note: For uPVC frame and sash extruded profiles minus 5% tolerancein dimension i.e. in depth & width of profile shall be acceptable. Variationin profile dimension in higher side shall be accepted but no extra payment on this account shall be made. BMT-N.85

17.01

-

7948.51

... More
Three track three panels sliding door with fly proof S.S wire mesh (Two Nos. glazed & one no. wire mesh panels) made of(big series) frame 116 x 45 mm & sash 46 x 82 mm both having wall thickness of 2.3 ± 0.2 mm and single glazing bead / double glazing bead of appropriate dimension. (Area of door above 2.00 Sqm upto 5.00 Sqm)

-

-

-

... More
Supplying and fixing FOLDABLE SHUTTER DOOR using Medium Teak wood Door Frame section of 125*75 MM is fixed to wall using MS Z Hold fast 300 MM long. including Door top arch with tinted glass of 5MM thickness , Medium Teak wood door shutters - 35 mmthick as per drawing including cost of Brass fixtures such as 12 Nos. Butt hinges 125mm long, 4 No tower bolt of 200x10mm dia, 1 No. Aldrops - 300 mm long, 1No. Latche-300mm long, 6 Nos. handles of 150 mm size & 1 Nos. Heavy duty door stoppers including fixing the fixtures to door with required no. of screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc., complete for finished item of work. (Door size 1.5 X 2.7m)

6.72

-

14266.49

... More
Supply & applying Melamine Polish Glossy/ Matt finish to the wood works duly cleaning the surface and applying emery paper, Sand the wood with 180 No., emery paper and then with 320 No., emery paper, clean & wipe off loose dust, applying suitable knifing paste filler / wood filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper, apply two component wood sealer, air dry for 24 hrs, Sand with 320 No emery paper, applying one coat of approved spraying thinner (for spraying)/ applying one coat of approved brushing thinner or general purpose thinner (for brushing) and apply (either with spray or brush) two coats of approved brand melamine including cost & labour charges, emery papers, cost of thinner & melamine polish of approved brands such as Jenson & Nicholson, Asian Paints, Berger Paints or equivalent etc., complete for finished item of work

13.44

-

1257.51

... More
Supply and installation of Best tiled roofing with mangalore tiles (blue color)inlcuding CM.

40

-

2216.3

... More
Plastering 12mm thick single coat in CM(1:5) 12 mm thick using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904)

468.99

-

345.33

... More
Plastering 20mm thick in two coats using screened sand with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc.,complete for External uneven surfaces of Brick wall and RCC exposed surface and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) for :- Plastering 2/c in CM(1:4) & (1:6) 20mm

162.99

-

468.79

... More
Plastering 25mm to 40mm thick base plastering 12mm to 20 mm in CM (1:3) and top finishing 12mm thick with CM (1:2) to bring the required ornamentation including fine rendering with neat cement cost and conveyanceof all materials, labour charges, all incidental and operational charges curing, lifting, scafolding charges etc. for external surface as per approved drawings and as directed during execution including preparation and fixing precast pillars, kudam,palakai, vedika. Lathalu in Uttara Eludhakam, pothikas, nasigudu. pupha puskala adihishtanam, wherever necessary and including overheads and contractors profit, excluding GST on all materials etc.Complete for finished item of work(as per silpi SSR 19-20) (1st class ornamentation work

128

-

1237.6

... More
Flooring with vitrified polished/Semi-polished floor tiles of 1st quality and make as approved by Engineer-in-charge of size not less than 600 mm x 600 mm , 8-10 mm thickness of any color finish and all shades and designs with borders and design as per the approved flooring pattern as directed by the Engineer-In -Charge set over a base coat of CM (1:8) prop. 12mm thick using screened sand over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 Kgs per Sqm. and jointed neately with white cement paste to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, white cement etc., to site (excluding cost of C.C. bed) and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge etc.,and overheads & contractors profit complete for finished item of work. (APSS No.701 & 707)

240

-

1238.39

... More
Providing skirting to internal walls to 15cm height/risers of steps with Soluble salt Porcelain Vitrified Tiles Screen printed and polished of size 600 x600mm and thickness between 8-9mm 1st quality set over base coat of CM (1:5) 12mm thick with cement slurry of honey like consistency spread at the rate of 3.30 Kgs per Sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete for finished item of work,

8.25

-

1240.88

... More
Providing and applying synthetic plaster putty or plaster of paris putty or lime punning of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for Internal walls

468.99

-

200.02

... More
Painting to new walls with 2 coats of acrylic emulsion paint of approved brand (Asian/Berger/Nerolac/Saicoat/Indocem or equivalent) and shade over base coat of approved cement primer grade-1 making 3 coats in all to give even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges , overheads & contractors profit etc., complete for finished item of work as per SS 911 Internal colouring

468.99

-

151.22

... More
Painting to new walls with 2 coats of Acrylic emulsion paint of approved brand (Asian/Berger/Nerolac/Saicoat/Indocem or equivalent) and shade over base coat of approved cement primer grade-1 making 3 coats in all to give even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges , overheads & contractors profit etc., complete for finished item of work as per SS 911 External colouring

162.99

-

162.32

... More
Providing and fixing of top hung Ventilators made of pre-painted steel (Base steel as per IS 513 of 0.80 mm thick galvanized as per IS 277 with Zinc of 120 GSM), finish painted with a polyester paint of 60-65 microns thick and section for outer frame of 80 x 45 mm, centre mullion of 80 x 60 mm, section for shutter of 52 x 25 mm x 0.6 mm thick, outer frame and mullions to have rebate for glazed shutter with a provision for guard bars/grills and the sections cut to length metre joined with corner bracket, centre mullion fixed with mullion cap, 1 No. of High grade nylon latch handle, window stopper, 2 Nos. of with MS Powder coated /SS ball bearing butt Hinges provided per shutter and windows fitted with 4 mm thick plain float glass with rubber gaskets including fixing the frames in concrete/masonry wall by means of self expanding screws, Including 10 mm Square guard bars with 6” (152.4mm) pitch etc., complete for finished item of work.

4.8

-

6305.63

... More
Supply and fabricating steel works like Window Grills, Compound Wall Grills, Iron Doors, Windows including cost of welding rods, power charges, including cost of fixing in position including all cost and conveyance of materials and all labour charges for cutting, bending to required shape welding including cost of weilding rods griding etc complete with all taxes etc., complete for finished item of work as per the approval of the Engineer-in-Charge.

278.15

-

106.35

... More
Painting with Priming Coat to given an even shade after throughly brushing the surface to remove all dirt and remains of losse powdered materials, including cost and conveyance of all materials to work site and all operational incidental labour charges etc., complete for finished item of work as per SS

46.02

-

59.31

... More
Painting with Synthetic Enamel paints -one coat - for New wood work, old wood work & New Iron work to given an even shade after throughly brushing the surface to remove all dirt and remains of losse powdered materials, including cost and conveyance of all materials to work site and all operational incidental labour charges etc., complete for finished item of work as per SS

46.02

-

63.18

... More
Supplying and fixing stainless steel works such as railing, hand rale, grills etc., using Stainless Steel Tubes of 304 Grade as per the approved drawing including cost and conveyance of all materials to site, Labour charges for Fabrication of stainless steel works using stainless steel welding rods including buffing, polishing, lacquer finishing, to present seamless finish, overheads & contractors profit etc ., complete for finished item of work.

100

-

598.51

... More
Supply and Fixing of 25mm outer dia heavy (2.20mm thickness) grade, FRLS with IS:9537 part 3 regid PVC pipe (ISI mark) concealed in wall with all required accessories including masonary work for light, fan , common and separate plug point including all labour charges etc., complete. Makes : Sudhakar / Modi ( ISI mark).

75

-

86.82

... More
Supply and run of 2 of 36/0.3mm (2.5 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for mains inlcuding all labour charges etc., complete. Makes: Polycab /RPG / Million / Power Flex / Anchor / V-Guard.

75

-

74.59

... More
Supply and run of 2 of 140/0.3mm (10.0 Sqmm) PVC FRLS / HFFR insulated flexible Copper cable in existing pipe for mains including all labour charges etc., complete. Makes: :Polycab /RPG / Million / Power Flex / Anchor / V-Guard.

100

-

230.05

... More
Supply and transportation of 20W, 2000 lumins, 1200mm length, T8 LED tube light fitting with extruded alluminium housing, input voltage AC 165 - 260 Volts with 0.9 PF with driver and frosted cover etc., complete with 3 years warranty. Luminaire Make : Phillips / Osram / GE / Crompton /VIN / Bajaj / Havells / Halonix.

10

-

792

... More
Fixing of 20W LED tube light luminaire on wall / Ceiling with all accessories including giving connections and all labour charges etc., complete.

10

-

147.59

... More
Supply of 48" (1200mm) Sweep 5 Star rated Ceiling Fan without Regulator. Makes : Crompton High Speed Decora / Orient Summer Crown

10

-

2645

... More
Supply of 1 Module Modular type Electronic step type Fan Regulator with 2 Module Hot Dip Galvanized Modular Metal Box covered with 2 modular cover frame etc., complete. Makes : GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge.

10

-

624

... More
Labour charges for Fixing of Ceiling fan and regulator including transportation and giving connections with twin core wire etc., complete.

10

-

167.81

... More
Supply and Fixing of 20A 2 Module Modular Socket with shutter and 16A / 20A 1 Way 1 Module Modular Switch duly recessed in wall with 3 Module Hot Dip Galvanized Modular Metal Box size covered with 3 Modular Cover Frame including earth connections and all labour charges etc., complete.[ Power plug ] Modular Switch,socket,metal box & Cover frame Make:GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge.

4

-

655.5

... More
Wiring with 2 runs of 14/0.3mm (1.0 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe with 6A / 10A 1 Way 1 Module Modular Switch control and 6A / 10A 3/2 Pin 2 Module Modular Socket with shutter fixing on Separate board with 3 Module Hot Dip Galvanized Modular Metal Box covered with 3 Modular Cover Frame including all labour charges etc., complete.Copper wire make:Polycab /RPG / Million / Power Flex / Anchor / V-Guard.Modular Switch, Socket, Metal box & Cover frame Make:GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge.

100

-

230.05

... More
Supply and fixing of 4 Way VTPN DB suitable for accomodating 125A 4 Pole MCCB as incomer and 63A,10KA, TP MCBs-4 Nos as outgoing and with IP 43 Protection including internal connection and labour charges for surface / flush mounting etc., complete. Incommer: 125A,4P,25KA MCCB-1No. Outgoing: 63A, 10KA , TP MCB's -4 Nos DB Makes : Legrand / Schneider. MCCB Make: L&T / Schneider / Siemens / Legrand. MCB Make: Legrand-DX3 / Schneider-Acti9.

1

-

23401

... More
Providing independent earthing by excavating a trench to a depth of 2.1 M in all soils, as per size specified in the Data, using 40mm dia 'B' class GI pipe of 2.5 Mtrs length with necessary accessories with hume pipe ring duly providing staggered holes including filling with equal proportion of Salt and Charcoal in layers and all labour charges etc., complete for small quarters.

1

-

3821.56

... More
Supply of 25 Sqmm 3.5 Core XLPE insulated, 1100V grade armoured alluminium cable as per specification confirming to IS:7098 (Part - I). Makes : Polycab / KEI / RPG / Finolex / Orbit / Havells / Paragon / V-Guard / Fortune Art / Gloster/ Suncab / Finecab

100

-

231

... More
Earth work excavation of Trench in hard ground soil, laying of U.G cables upto 50 Sq,mm on sand cushion covering the cable with bricks and back filling of Trench duly providing route indicator embedded in C.C including cost and conveyance of materials and labour charges etc., complete.

100

-

238.32

... More
Earth work excavation for foundations (Manual Means) of buildings in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work including seigniorage excluding dewatering charges etc., as per SS 20 B(APSS 308)

19.56

-

238.32

... More
Conveyance of un-useful excavated earth to a distance of 2 KM for disposal including hire charges of T & P, labour charges etc., and overheads & contractors profit complete for finished item of work.

9.78

-

38.29

... More
Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

3.29

-

331.16

... More
Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 20mm size hard , machine crushed trap from approved quarry including cost and conveyance of all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402) ( (BLD-CSTN-3-5))

1.54

-

3978.18

... More
Supply and placing of the Design Mix Concrete M20 (350kg Cement) corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. (BLD-CSTN-3-14) Footings

2.61

-

8646.77

... More
Plinth beam

2.59

-

11222.28

... More
Columns

3.87

-

11666.35

... More
Roof beams

0.9

-

10908.92

... More
Slab

0.18

-

9742.48

... More
Supplying, fitting and placing Fe - 500 HYSD bar reinforcement complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage,where they are not welded including cost and conveyance of steel, binding wire etc., lifting charges of steel , placing in position, tying with binding wire, all tools etc., and overheads & contractors profit complete for finished item of work ( APSS No.126 )

1221.22

-

87.93

... More
Pre construction Anti termite is a process in which chemical toxic to subterrean termites is apply/ inject into soil during early stage of building Construction 2. Treatement of soil Beneath the building and around the foundations conduct and chemical use as per BIS - IS 6313 (Part -2) 2013 code specification & CIB RC registered termiticide which creates a continuous chemical barrier beneath the building which kills or repels terminates & impervious to tremite entry 3. Imidacloprid 30.5% SC (IS 63131) dissolve 2.1 Ml/1 liter of water and apply emulsion/solution @ 7.5 Litres/Square meter (Sqm) of internal, external vertical surface of the colums , plinth beams (Back filling) walls and floor junction, external perimeters, along reatining wall @ 5.0 Liters/Sqm of the horizontal surface of basement top surface of the basement filling below flooring bed (Plinth) & @ 2.0 Litres/ Line meter at expansion joints. The substructure of a depth of 500mm around coulmns & 300mm deep around plinth beams, basements & floor filling area including excavation channel along the wall & rodding etc. cost & Conveyance of all materials to the site, cost of labour for sparying, rodding etc. complete for furnished item of work as per the approval of the Engineer-in-charge.

17.75

-

170.42

... More
CR stone masonry in 2nd sort in CM (1:6) prop: (cement : sand) using hard granite stones from approved quarry including cost and conveyance of all materials like cement, sand water, granite stones, etc., from approved quarry to site and including labour for cutting stones to required size and shape, mixing of cement, mortar, construction, scaffolding charges, curing etc., and overheads & contractors profit, complete for finished item of work in foundation & basement. (APSS No. 615 & 601)

2.16

-

4355

... More
Supply & construction of Brick Masonry in CM (1:6) with 2nd class Bricks traditional size 23x11x7 2nd class with compressive of 37 Kgs / Sqcm from approved source including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504). (BLD-CSTN-5-4)

3.62

-

5981.12

... More
Plastering 25mm to 40mm thick base plastering 12mm to 20 mm in CM (1:3) and top finishing 12mm thick with CM (1:2) to bring the required ornamentation including fine rendering with neat cement cost and conveyanceof all materials, labour charges, all incidental and operational charges curing, lifting, scafolding charges etc. for external surface as per approved drawings and as directed during execution including preparation and fixing precast pillars, kudam,palakai, vedika. Lathalu in Uttara Eludhakam, pothikas, nasigudu. pupha puskala adihishtanam, wherever necessary and including overheads and contractors profit, excluding GST on all materials etc.Complete for finished item of work(as per silpi SSR 19-20) (1st class ornamentation work

28.2

-

1237.6

... More
Plastering 20mm thick in two coats using screened sand with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc.,complete for External uneven surfaces of Brick wall and RCC exposed surface and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) for :- Plastering 2/c in CM(1:4) & (1:6) 20mm

42.47

-

412.61

... More
Supply and fabricating steel works like Window Grills, Compound Wall Grills, Iron Doors, Windows including cost of welding rods, power charges, including cost of fixing in position including all cost and conveyance of materials and all labour charges for cutting, bending to required shape welding including cost of weilding rods griding etc complete with all taxes etc., complete for finished item of work as per the approval of the Engineer-in-Charge.

1512

-

106.35

... More
Painting with Priming Coat to given an even shade after throughly brushing the surface to remove all dirt and remains of losse powdered materials, including cost and conveyance of all materials to work site and all operational incidental labour charges etc., complete for finished item of work as per SS

33.2

-

59.31

... More
Painting with Synthetic Enamel paints -one coat - for New wood work, old wood work & New Iron work to given an even shade after throughly brushing the surface to remove all dirt and remains of losse powdered materials, including cost and conveyance of all materials to work site and all operational incidental labour charges etc., complete for finished item of work as per SS

33.2

-

63.18

... More
Supply and installation of Best tiled roofing with mangalore tiles (BLUE color)inlcuding CM.

12

-

2216.3

... More
Providing and applying synthetic plaster putty or plaster of paris putty or lime punning of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for Internal walls

70.67

-

200.02

... More
Painting to new walls with 2 coats of acrylic emulsion paint of approved brand (Asian/Berger/Nerolac/Saicoat/Indocem or equivalent) and shade over base coat of approved cement primer grade-1 making 3 coats in all to give even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges , overheads & contractors profit etc., complete for finished item of work as per SS 911 Internal colouring

70.67

-

151.22

... More
Supply and Fixing of 25mm outer dia heavy (2.20mm thickness) grade, FRLS with IS:9537 part 3 regid PVC pipe (ISI mark) concealed in wall with all required accessories including masonary work for light, fan , common and separate plug point including all labour charges etc., complete. Makes : Sudhakar / Modi ( ISI mark).

25

-

86.82

... More
Supply and run of 2 of 36/0.3mm (2.5 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for mains inlcuding all labour charges etc., complete. Makes: Polycab /RPG / Million / Power Flex / Anchor / V-Guard.

25

-

74.59

... More
Supply and run of 2 of 140/0.3mm (10.0 Sqmm) PVC FRLS / HFFR insulated flexible Copper cable in existing pipe for mains including all labour charges etc., complete. Makes: :Polycab /RPG / Million / Power Flex / Anchor / V-Guard.

30

-

230.05

... More
Supply and fixing of 18W heavy duty LED Down lighter, suitable for Recessed / Surface mounting made of pressure diecast alluminium body with powder coating, acrylic diffuser with Driver as per IS: 15885 (Part 2/ Sec 13) : 2012 , operating voltage range of 150 to 265 Volts AC, P.F 0.9, Surge protection: 2KV, THD10% with high power LED's having efficacy of 80 lumins / watt, CCT: 3000K -5700K, minimum CRI 70, Luminaire performance complies to IS 10322 (Part 5 / Sec-3) etc., completea) LUMINAIRE MAKE : Pasolite / Cosmo / Siger/ Koncept/ Kiran/Vibrant/Leo/Lumens/Iliteb) LED MAKE : CREE / NICHIA / OSRAM / SAMSUNG / EVERLIGHT

8

-

1449

... More
Supply and fixing of 6A / 10A 3/2 Pin 2 Module Modular Socket with shutter with 6A / 10A 1 Way 1 Module Modular Switch control on a Common switch board with with 3 Module Hot Dip Galvanized Modular Metal Box covered with 3 Modular Cover Frame with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Modular Switch, Socket, Metal box & Cover frame Make:GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge.

1

-

472.69

... More
Supply and fixing of 7W LED COB Spot Light, suitable for Recessed mounting made of diecast alluminium body with powder coating, with Driver, operating voltage range of 150 to 265 Volts AC, CCT: 3000K - 5700K, minimum CRI70, .etc., complete Makes : Surya /C&S / Syska / Enrich / Stanjo / Polycab/ Ib LED/ Opple/R LED/Luker/ Orbit/Trinic/Panasonic b) LED MAKE : Bridge Lux / LUMILEDS / CREE / NICHIA / SAMSUNG/ Sunpo

14

-

920

... More
Earth work excavation for foundations (Manual Means) of buildings in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work including seigniorage excluding dewatering charges etc., as per SS 20 B(APSS 308)

38.48

-

238.32

... More
Earth work excavation for foundations (Mechnical Means) of buildings in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work including seigniorage excluding dewatering charges etc., as per SS 20 B(APSS 308)

153.93

-

115.36

... More
Providing Sand filling below foundation, behind abutment and return walls in layers including cost of all materials, machinery, labour, watering, ramming etc., complete with initial lead upto 50 m and initial lift upto 3 m.

10.92

-

331.16

... More
Plain Cement Concrete (1:3:6) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 20mm size nominal aggregate machine crushed hard granite metal (coarse aggregate) from approved quarry from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, excluding seigniorage charges, sales & other taxes on all materials and including all charges for mixing, laying concrete, curing etc., complete for finished item of work. (APSS No. 402) for:-Hand Mix-PCC (1:3:6) NOMINAL MIX

18.94

-

3978.18

... More
Supply and placing of the Design Mix Concrete M20 (350kg Cement) corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. (BLD-CSTN-3-14) For Footing

17.25

-

8646.77

... More
For Columns

15.34

-

11666.35

... More
For Plinth Beam

13.72

-

11222.28

... More
Supplying, fitting and placing Fe - 500 HYSD bar reinforcement complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage,where they are not welded including cost and conveyance of steel, binding wire etc., lifting charges of steel , placing in position, tying with binding wire, all tools etc., and overheads & contractors profit complete for finished item of work( APSS No.126 )

2315.31

-

87.93

... More
Supply & construction of Brick Masonry in CM (1:6) with 2nd class Bricks traditional size 23x11x7 2nd class with compressive of 37 Kgs / Sqcm from approved source including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504). (BLD-CSTN-5-4)

68.59

-

5981.12

... More
CR stone masonry in 2nd sort in CM (1:6) prop: (cement : sand) using hard granite stones from approved quarry including cost and conveyance of all materials like cement, sand water, granite stones, etc., from approved quarry to site and including labour for cutting stones to required size and shape, mixing of cement, mortar, construction, scaffolding charges, curing etc., and overheads & contractors profit, complete for finished item of work in foundation & basement. (APSS No. 615 & 601)

20.58

-

4355

... More
Plastering 20mm thick in two coats using screened sand with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc.,complete for External uneven surfaces of Brick wall and RCC exposed surface and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) for :- Plastering 2/c in CM(1:4) & (1:6) 20mm

840

-

412.61

... More
Painting to new walls with 2 coats of acrylic emulsion paint of approved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for external walls for:-External Colouring - acrylic emulsion paint - 3 Coats

840

-

162.32

... More
Supply and fabricating steel works like Window Grills, Compound Wall Grills, Iron Doors, Windows including cost of welding rods, power charges, including cost of fixing in position including all cost and conveyance of materials and all labour charges for cutting, bending to required shape welding including cost of weilding rods griding etc complete with all taxes etc., complete for finished item of work as per the approval of the Engineer-in-Charge.

3150

-

106.35

... More
Painting with Synthetic Enamel paints -one coat - for New wood work, old wood work & New Iron work to given an even shade after throughly brushing the surface to remove all dirt and remains of losse powdered materials, including cost and conveyance of all materials to work site and all operational incidental labour charges etc., complete for finished item of work as per SS

63

-

63.18

... More
Earth work excavation for foundations (Manual Means) of building foundations, footings, walls, sump, compound wall in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting etc., as per GFC drawings issued by the Employer and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308)

40.24

-

238.32

... More
Filling with carted Sand in trenches,sides of foundations and basement with initial lead1 in layers not exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and all peraitonal,incidental ,labour charges,hire charges of T&P etc., and overheads & contractors profit complete for fnished item of work(APSS NO.309&310)

251.5

-

597.3

... More
Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. as per GFC drawings issued by the Employer to site, including sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed of 0.1m layer ramming finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402)

30.18

-

3978.18

... More
Flooring with precast concrete blocks for paving of M-35 grade and thickness not less than 60 mm for light traffic areas conforming to IS 15658:2006 in all shapes and designs as per the manufacturer's specification including Labour charges for laying & fixing of precast concrete blocks for paving of all grades, any thickness, all sizes & shapes including all labour charges for loading & unloading, laying to desired lines and levels complete excluding cost of cement, sand, water, electricity etc and all operational, incidental, labour charges etc., complete for finished item of work as per (APSS No.709)

2515

-

635.61

... More
Supply and fixing C.C. (Pre casted) not less than M30 strength, C.C. Kerbs of size 600 X 400 X 110 mm thick with bottom thickness of 110 mm upto height of 350 mm and top width of 60 mm thick chamfering at starts at 350 mm height to 400mm (As per drawing) can be laid existing CC Bed jointing with C.M(1:3) including cost and conveyance of all materials & labour charges including transportation etc., complete for finished item of work.

1006

-

297.27

... More
Earth work excavation for foundations (Manual Means) of buildings in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work including seigniorage excluding dewatering charges etc., as per SS 20 B(APSS 308)

25.47

-

238.32

... More
Earth work excavation for foundations (Mechnical Means) of buildings in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work including seigniorage excluding dewatering charges etc., as per SS 20 B(APSS 308)

59.43

-

115.36

... More
Conveyance of un-useful excavated earth to a distance of 2 KM for disposal including hire charges of T & P, labour charges etc., and overheads & contractors profit complete for finished item of work.

42.45

-

38.29

... More
Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

107.03

-

331.16

... More
Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 20mm size hard , machine crushed trap from approved quarry including cost and conveyance of all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402) ( (BLD-CSTN-3-5))

18.78

-

3978.18

... More
Pre construction Anti termite is a process in which chemical toxic to subterrean termites is apply/ inject into soil during early stage of building Construction 2. Treatement of soil Beneath the building and around the foundations conduct and chemical use as per BIS - IS 6313 (Part -2) 2013 code specification & CIB RC registered termiticide which creates a continuous chemical barrier beneath the building which kills or repels terminates & impervious to tremite entry 3. Imidacloprid 30.5% SC (IS 63131) dissolve 2.1 Ml/1 liter of water and apply emulsion/solution @ 7.5 Litres/Square meter (Sqm) of internal, external vertical surface of the colums , plinth beams (Back filling) walls and floor junction, external perimeters, along reatining wall @ 5.0 Liters/Sqm of the horizontal surface of basement top surface of the basement filling below flooring bed (Plinth) & @ 2.0 Litres/ Line meter at expansion joints. The substructure of a depth of 500mm around coulmns & 300mm deep around plinth beams, basements & floor filling area including excavation channel along the wall & rodding etc. cost & Conveyance of all materials to the site, cost of labour for sparying, rodding etc. complete for furnished item of work as per the approval of the Engineer-in-charge.

138.72

-

170.42

... More
Supply and placing of the Design Mix Concrete M20 (350kg Cement) corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. (BLD-CSTN-3-14) FOOTINGS

3.58

-

8646.77

... More
PLINTH BEAMS

10.07

-

11222.28

... More
COLUMNS

5

-

11666.35

... More
ROOF BEAMS

10.65

-

10908.92

... More
LINTEL BEAMS

1.39

-

12323.31

... More
SLAB

12.75

-

9742.48

... More
Supplying, fitting and placing Fe - 500 HYSD bar reinforcement complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage,where they are not welded including cost and conveyance of steel, binding wire etc., lifting charges of steel , placing in position, tying with binding wire, all tools etc., and overheads & contractors profit complete for finished item of work( APSS No.126 )

5073.93

-

87.93

... More
Damp proof course 50mm thick with 1:2:4 cement concrete Nominal mix, using 12mm hard broken stone aggregate including cost of all materials, seigniorage charges, excluding conveyance charges of materials including the cost of machinery, labour charges, mixing, placing in position, leveling, vibrating, curing etc. complete for finished item of work. (Using concrete mixer)

9.6

-

200.35

... More
CR stone masonry in 2nd sort in CM (1:6) prop: (cement : sand) using hard granite stones from approved quarry including cost and conveyance of all materials like cement, sand water, granite stones, etc., from approved quarry to site and including labour for cutting stones to required size and shape, mixing of cement, mortar, construction, scaffolding charges, curing etc., and overheads & contractors profit, complete for finished item of work in foundation & basement. (APSS No. 615 & 601)

5.76

-

4355

... More
Supply & construction of Brick Masonry in CM (1:6) with 2nd class Bricks traditional size 23x11x7 2nd class with compressive of 37 Kgs / Sqcm from approved source including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504). (BLD-CSTN-5-4)

66.59

-

5981.12

... More
Plastering 12mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904)

215.75

-

345.33

... More
Plastering 20mm thick in two coats using screened sand with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc.,complete for External uneven surfaces of Brick wall and RCC exposed surface and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) for :- Plastering 2/c in CM(1:4) & (1:6) 20mm

167.82

-

468.79

... More
Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903).

102

-

493.79

... More
Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick including neat cement slurry of honey like consistancy spread at the rate of 3.3kg per Sqm and filling the joints with white cement mixed with pigment of matching shade to match the shade of tiles over a bed of C.C. or R.C.C. slab, including cost and conveyance of all materials like cement, sand, water, ceramic tiles, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer-in-charge curing etc., complete and cost of overheads and contractor profit for finished item of work. (APSS No.707 & 701)

17.4

-

943.15

... More
Dadooing to walls withglazed red or white full body ceramic wall tiles of Size 300 x 450 mm / 320 mm x 400 mm and thickness 6 mm and 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of C.M (1:5) proportion, 12mm thick and neat grey cement slurry of honey like consistency, spread at the rate of 3.3Kgs per Sqm and jointed with white cement or coloured cement to match the shade of the tiles, including cost and conveyance of all materials like cement, sand, water, tiles, coloured cement, overheads & contractors profit etc., to site, all labour charges for mixing of cement mortar, laying glazed tiles to level, curing etc., complete for finished item of work as directed by Engineer-in-charge.

29.4

-

663.99

... More
Flooring with vitrified polished/Semi-polished floor tiles of 1st quality and make as approved by Engineer-in-charge of size not less than 600 mm x 600 mm , 8-10 mm thickness of any color finish and all shades and designs with borders and design as per the approved flooring pattern as directed by the Engineer-In -Charge set over a base coat of CM (1:8) prop. 12mm thick using screened sand over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 Kgs per Sqm. and jointed neately with white cement paste to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, white cement etc., to site (excluding cost of C.C. bed) and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge etc.,and overheads & contractors profit complete for finished item of work. (APSS No.701 & 707)

90.3

-

1238.39

... More
Providing skirting to internal walls to 15 cm height with vitrified tiles 8mm thick , regular finish and normal colour, length equal to flooring tiles, set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 Kgs per Sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc.,and overheads & contractors profit complete excluding seigniorage charges etc., complete for finished item of work.(APSS No.701 &707)

7

-

1240.88

... More
Supply and fabricating steel works like Window Grills, Compound Wall Grills, Iron Doors, Windows including cost of welding rods, power charges, including cost of fixing in position including all cost and conveyance of materials and all labour charges for cutting, bending to required shape welding including cost of weilding rods griding etc complete with all taxes etc., complete for finished item of work as per the approval of the Engineer-in-Charge.

37.5

-

106.35

... More
Painting with Priming Coat to given an even shade after throughly brushing the surface to remove all dirt and remains of losse powdered materials, including cost and conveyance of all materials to work site and all operational incidental labour charges etc., complete for finished item of work as per SS

13.8

-

59.31

... More
Painting with Synthetic Enamel paints -one coat - for New wood work, old wood work & New Iron work to given an even shade after throughly brushing the surface to remove all dirt and remains of losse powdered materials, including cost and conveyance of all materials to work site and all operational incidental labour charges etc., complete for finished item of work as per SS

13.8

-

63.18

... More
Supplying and fixing FOLDABLE SHUTTER DOOR using Medium Teak wood Door Frame section of 125*75 MM is fixed to wall using MS Z Hold fast 300 MM long. including Door top arch with tinted glass of 5MM thickness , Medium Teak wood door shutters - 35 mmthick as per drawing including cost of Brass fixtures such as 12 Nos. Butt hinges 125mm long, 4 No tower bolt of 200x10mm dia, 1 No. Aldrops - 300 mm long, 1No. Latche-300mm long, 6 Nos. handles of 150 mm size & 1 Nos. Heavy duty door stoppers including fixing the fixtures to door with required no. of screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc., complete for finished item of work. (Door size 1.5 X 2.7m)

15.33

-

14266.49

... More
Supply & applying Melamine Polish Glossy/ Matt finish to the wood works duly cleaning the surface and applying emery paper, Sand the wood with 180 No., emery paper and then with 320 No., emery paper, clean & wipe off loose dust, applying suitable knifing paste filler / wood filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper, apply two component wood sealer, air dry for 24 hrs, Sand with 320 No emery paper, applying one coat of approved spraying thinner (for spraying)/ applying one coat of approved brushing thinner or general purpose thinner (for brushing) and apply (either with spray or brush) two coats of approved brand melamine including cost & labour charges, emery papers, cost of thinner & melamine polish of approved brands such as Jenson & Nicholson, Asian Paints, Berger Paints or equivalent etc., complete for finished item of work

15.33

-

1257.51

... More
Providing and fixing factory made uPVC white colour sliding glazed doorcomprising of uPVC multi-chambered frame with in-built roller track andsash extruded profiles duly reinforced with 1.60 ± 0.2 mm thick galvanizedmild steel section made from roll forming process of required length (shape & size according to uPVC profile), appropriate dimension uPVCextruded glazing beads, uPVC extruded interlock and uPVC extrudedInline sash adaptor (if required), EPDM gasket, wool pile, zinc alloy(white powder coated) handle with key on one side of extreme panels along with zinc plated mild steel multi point locking having transmissiongear with keeps, zinc alloy (white powder coated) cresent lock (ifrequired), stainless steel (SS 304 grade) body with adjustable doublenylon rollers (weight bearing capacity to be 120 kg), G.I fasteners 100 x 8 mm size for fixing frame to finished wall and necessary stainless steelscrews etc. Profile of frame & sash shall be mitred cut and fusion weldedat all corners, including drilling of holes for fixing hardware's and drainageof water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled with weather proof silicon sealent over backerrod of required size and of approved quality, all complete as per approveddrawing & direction of Engineerin-Charge inclusive of cost of Single / double glass panes,wire mesh and silicon sealent . Note: For uPVC frame and sash extruded profiles minus 5% tolerancein dimension i.e. in depth & width of profile shall be acceptable. Variationin profile dimension in higher side shall be accepted but no extra payment on this account shall be made. BMT-N.85

-

-

-

... More
Three track three panels sliding door with fly proof S.S wire mesh (Two Nos. glazed & one no. wire mesh panels) made of(big series) frame 116 x 45 mm & sash 46 x 82 mm both having wall thickness of 2.3 ± 0.2 mm and single glazing bead / double glazing bead of appropriate dimension. (Area of door above 2.00 Sqm upto 5.00 Sqm)

1.8

-

7948.51

... More
Providing & fixing internal prelaminated PVC door frame of size 100 x 45 mm with a wall thickness of 5mm, made of extruded 5 mm Prelam PVC foam sheet, mitred cut at two corners and joined with two Nos. of 150mm long brackets of 15 x 15 mm MS square tube, two vertical door profiles reinforced with 40 x 20 MS Tube of 19 guage throughout the frame and the door frame fixed to the wall using 65/100mm long MS screws through the frame by using PVC fasteners with a minimum of 3 Nos of screws provided for each vertical member and two Nos. for horizontal, etc complete as per drawing and direction of Engineer in Charge

18

-

624.88

... More
Providing and fixing 35mm thick BRAND FACTORY MADE SOLID SINGLE SIDE PRELAM PANEL PVC DOOR SHUTTER consisting of frame made out of MS. Tubes of 19gauge thickness and size of 19mmX19mm for stiles, and 15mmX15mm for top and bottom rails. The MS. Frame shall have a coat of steel primers of approved make and manufacture. MS. Frame covered with 5mm thick heat moulded single side Prelam Pac ‘C’ channel of size 30mmX50mm to form stiles.5mm thick& 75mm wide single side prelim Pac sheets shall be for the top, bottom and lock rails. Panelling of 5mm thick one side Pac sheet to be fitted in the MS. Frame and sealed to the front (prelam side) stiles and rails (which should have a 5mm 45 bent portion as beading) and attached to the back(white/ivory) stiles and rails which should have a 10mm 900 bent portion as beading ) using 2Nos. 15mm wide X 5mm thick Pac sheet beading inside the 90 bent beading. All stiles, rails and beadings are to be joined to the panel using solvent cement etc. an additional 5mm thick Pac strip of 20mm width to be stuck on the interior side of the ‘C” channel using Pac solvent cement adhesive and 10mm(5mmX2) thick, 20mm wide cross Pac sheet to be fitted as gap insert for top and bottom rail etc. complete as per direction of Engineer –in-Charge, manufacture specification and drawing.

4.73

-

1598.24

... More
Providing and applying synthetic plaster putty or plaster of paris putty or lime punning of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for Internal walls

215.75

-

200.02

... More
Supply and installation of Best tiled roofing with mangalore tiles (rustic green color)inlcuding CM.

42.94

-

2216.3

... More
Painting to new walls with 2 coats of acrylic emulsion paint of approved brand (Asian/Berger/Nerolac/Saicoat/Indocem or equivalent) and shade over base coat of approved cement primer grade-1 making 3 coats in all to give even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges , overheads & contractors profit etc., complete for finished item of work as per SS 911 Internal colouring

215.75

-

151.22

... More
Painting to new walls with 2 coats of Acrylic emulsion paint of approved brand (Asian/Berger/Nerolac/Saicoat/Indocem or equivalent) and shade over base coat of approved cement primer grade-1 making 3 coats in all to give even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges , overheads & contractors profit etc., complete for finished item of work as per SS 911 External colouring

167.82

-

162.32

... More
Plastering 25mm to 40mm thick base plastering 12mm to 20 mm in CM (1:3) and top finishing 12mm thick with CM (1:2) to bring the required ornamentation including fine rendering with neat cement cost and conveyanceof all materials, labour charges, all incidental and operational charges curing, lifting, scafolding charges etc. for external surface as per approved drawings and as directed during execution including preparation and fixing precast pillars, kudam,palakai, vedika. Lathalu in Uttara Eludhakam, pothikas, nasigudu. pupha puskala adihishtanam, wherever necessary and including overheads and contractors profit, excluding GST on all materials etc.Complete for finished item of work(as per silpi SSR 19-20) (1st class ornamentation work)

9.6

-

1237.6

... More
Providing and fixing of top hung Ventilators made of pre-painted steel (Base steel as per IS 513 of 0.80 mm thick galvanized as per IS 277 with Zinc of 120 GSM), finish painted with a polyester paint of 60-65 microns thick and section for outer frame of 80 x 45 mm, centre mullion of 80 x 60 mm, section for shutter of 52 x 25 mm x 0.6 mm thick, outer frame and mullions to have rebate for glazed shutter with a provision for guard bars/grills and the sections cut to length metre joined with corner bracket, centre mullion fixed with mullion cap, 1 No. of High grade nylon latch handle, window stopper, 2 Nos. of with MS Powder coated /SS ball bearing butt Hinges provided per shutter and windows fitted with 4 mm thick plain float glass with rubber gaskets including fixing the frames in concrete/masonry wall by means of self expanding screws, Including 10 mm Square guard bars with 6” (152.4mm) pitch etc., complete for finished item of work.

0.6

-

6305.63

... More
supply and fixing of clay jali 200x200x75mm with special adhesive and metal paste line for clean and neat look as per the direction of engineer in charge

21.6

-

3285

... More
supply and fixing of 6mm thk HPL inlcuding cost and conveyance of all materials to work site and fixing ccharges, overheads and constractor profits etc

3.6

-

7200

... More
Flooring with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) of regular colours (other than black) set over a base coat of CM (1:8) prop. 20mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 Kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement, sand, water, granite, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying granite to required slope as directed by the Engineer- in-charge, cost of overheads & contractors profit etc., complete for finished item of work . (APSS No.701 & 707)

3.69

-

3703.82

... More
Supplying & Fixing Orissa Pan white glazed W.C 1st quality ISI marked conforming to IS:2556-Part-3-1981 with "P" or "S" trap Hindware/ Parryware/ Neycer - ISI Mark: 580 mm x 440 mm including Brick masonry seat for Orissa pan/ Indian W.C. using 2nd class bricks as per standard practice, PVC low level system with internal components & short bend: 10 Litres capacity Single Flush, 15 mm PVC connection with brass union nut C.P coated and 15mm CP finish brass stop valve. Complete for finished item of work. Make:Neycer/Parryware/Jaquar/CERA/Hindustan Sanitaryware

3

-

3589.1

... More
Supplying & Fixing Indian makeFlat Back Wash Hand Basin1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain,32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block: 630 x 450 mm - Double C.P. Pillar cock

5

-

3036.93

... More
Supplying and fixing NP bib taps of size 12.70mm dia of Indian make Seiko or equivalent including cost and conveyance of all materials, labour charges etc., complete for finished item of work in all floors.

16

-

682.01

... More
Providing & Placing on Terrace(at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks

1000

-

6.82

... More
Supplying & fixing Ashirvad/Astral flow guard for equivalent CPVC Pipes with fittings in ground or on wall including cost of tees, elbows, bends, reducers, couplings, running joints, union flanges, unions etc. with necessary excavation in all types of soils except rock requiring blasting, refilling, chiselling masonry walls and making good the walls & floors to the original surface and fixing MS clamps on TW blocks on walls including cost and conveyance of all materials and labour charges complete for finished item of work complete 15.90 mm dia CPVC SDR 11.00

40

-

72.71

... More
22.20 mm dia CPVC SDR 11.00

50

-

110.21

... More
54 mm dia CPVC SDR 11.00

50

-

574.89

... More
Supplying and fixing PPR Ball valve as per ISI Class - I , Indian make heavy type including cost and conveyance of all materials , labour charges etc. complete for finished item of work 25mm PPR Ball valve

2

-

244.27

... More
32mm PPR Ball valve

1

-

257.91

... More
50mm PPR Ball valve

1

-

613.52

... More
S & F 3" (76.2 mm ) Nahany Trap with Jali - UPVC/SWR Pipe fittings

6

-

135.2

... More
S&F 110 mm dia 3 MDouble Socket PVC/SWR pipe - 6 Kg/sq.cm

20

-

1004.36

... More
S&F 75 mm dia 1828.8 mm (6'-0") Single Socket PVC/SWR pipe- 6 Kg/sq.cm

15

-

373.79

... More
Constructing 904.0 mm (3’0”) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mmincluding plastering with cement mortar 1:3 prop; ½” thick both inside and outside fitted with 20” dia RCC manhole covers and frames including excavating pits up to a depth of 1524 mm (5'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification andincluding cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental andoperational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work as per Standard specification.

5

-

10262.84

... More
Supplying & fixing 150 mm x 100 mm SWG gully trapsconforming to ISI 651 & 4127 with C.I Grating & Cost. Brick masonry in CM 1:6 prop. Intermediate chamber and fitted with304.8 mm x 288.6mm (12"x9") C.I Frame and hinged cover

4

-

577.16

... More
Supply of SWG Plugs conforming to IS standards for 150 mm dia

6

-

62.49

... More
Labour charges for fixing and laying the SWG Junctions/ Plugs/ Bends of any dia with airtight cement joints as per standard practice

6

-

36.36

... More
Lowering the RCC plain ended pipes carefully into the trench laying them true to alignment and gradient, jointing RCC pipes with cement joints including curing, the cost of jointing materials i.e., Cement Mortar (1:1.5), hemp yarn etc., and testing including filling with water with a water lead up to 500 Meters excluding cost of rubber rings as per BIS No.783/85.

45

-

163.61

... More
Manufacture, Supply and Delivery of R.C.C. Plain ended pipes conforming to B.I.S 458/2003,Ex -factory, excluding transportation and all taxes. (NP-2 Class - 150mm dia ).

45

-

214.73

... More
Supply and Fixing of 25mm outer dia heavy (2.20mm thickness) grade, FRLS with IS:9537 part 3 regid PVC pipe (ISI mark) concealed in wall with all required accessories including masonary work for light, fan , common and separate plug point including all labour charges etc., complete. Makes : Sudhakar / Modi ( ISI mark).

68

-

86.82

... More
Supply and fixing of 6A / 10A 3/2 Pin 2 Module Modular Socket with shutter with 6A / 10A 1 Way 1 Module Modular Switch control on a Common switch board with with 3 Module Hot Dip Galvanized Modular Metal Box covered with 3 Modular Cover Frame with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Modular Switch, Socket, Metal box & Cover frame Make:GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge.

10

-

472.69

... More
Supply and Fixing of 20A 2 Module Modular Socket with shutter and 16A / 20A 1 Way 1 Module Modular Switch duly recessed in wall with 3 Module Hot Dip Galvanized Modular Metal Box size covered with 3 Modular Cover Frame including earth connections and all labour charges etc., complete.[ Power plug ] Modular Switch,socket,metal box & Cover frame Make:GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge.

2

-

655.5

... More
Supply and run of 2 of 36/0.3mm (2.5 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for mains inlcuding all labour charges etc., complete. Makes: Polycab /RPG / Million / Power Flex / Anchor / V-Guard.

136

-

74.59

... More
Supply and run of 2 of 140/0.3mm (10.0 Sqmm) PVC FRLS / HFFR insulated flexible Copper cable in existing pipe for mains including all labour charges etc., complete. Makes: :Polycab /RPG / Million / Power Flex / Anchor / V-Guard.

68

-

230.05

... More
Fixing of 20W/18W led tube light luminaire on wall / Ceiling with / TW /PVC round blocks with all accessories including giving connections and all labour charges etc., complete.

16

-

147.59

... More
Supply and transportation of 20W, 2000 lumins, 1200mm length, T8 LED tube light fitting with extruded alluminium housing, input voltage AC 165 - 260 Volts with 0.9 PF with driver and frosted cover etc., complete with 3 years warranty. Luminaire Make : Phillips / Osram / GE / Crompton /VIN / Bajaj / Havells / Halonix.

16

-

792

... More
Supply and fixing of 18W heavy duty LED Down lighter, suitable for Recessed / Surface mounting made of pressure diecast alluminium body with powder coating, acrylic diffuser with Driver as per IS: 15885 (Part 2/ Sec 13) : 2012 , operating voltage range of 150 to 265 Volts AC, P.F 0.9, Surge protection: 2KV, THD10% with high power LED's having efficacy of 80 lumins / watt, CCT: 3000K -5700K, minimum CRI 70, Luminaire performance complies to IS 10322 (Part 5 / Sec-3) etc., completea) LUMINAIRE MAKE : Pasolite / Cosmo / Siger/ Koncept/ Kiran/Vibrant/Leo/Lumens/Iliteb) LED MAKE : CREE / NICHIA / OSRAM / SAMSUNG / EVERLIGHT

8

-

1449

... More
Supply of 12" (300mm) Light duty exhaust fan with wire guard etc complete etc., complete. Makes : Crompton / Bajaj Bahar WG / Havells Ventil Air-DB / Orient hill air.

2

-

1668

... More
Labour charges for fixing of Exhaust fan in wall with necessary connections etc., complete ( for hole already made available).

2

-

396.68

... More
Supply and fixing of 4 Way VTPN DB suitable for accomodating 125A 4 Pole MCCB as incomer and 63A,10KA, TP MCBs-4 Nos as outgoing and with IP 43 Protection including internal connection and labour charges for surface / flush mounting etc., complete. Incommer: 125A,4P,25KA MCCB-1No. Outgoing: 63A, 10KA , TP MCB's -4 Nos DB Makes : Legrand / Schneider. MCCB Make: L&T / Schneider / Siemens / Legrand. MCB Make: Legrand-DX3 / Schneider-Acti9.

1

-

23401

... More
Supply of 48" (1200mm) Sweep decorative Ceiling Fan, with double ball bearings with all accessories without Regulator. Makes: Crompton HS Decora / Bajaj Regal Star / Havells Spark deco / Orient summer crown /Halonix(Zephyr) /Polycab(India Glory) /G.M. (G-Storm)

3

-

2645

... More
Labour charges for Fixing of Ceiling fan and regulator including transportation and giving connections with twin core wire etc., complete.

3

-

167.81

... More
Supply and fixing of 7W LED COB Spot Light, suitable for Recessed mounting made of diecast alluminium body with powder coating, with Driver, operating voltage range of 150 to 265 Volts AC, CCT: 3000K - 5700K, minimum CRI70, .etc., complete Makes : Surya /C&S / Syska / Enrich / Stanjo / Polycab/ Ib LED/ Opple/R LED/Luker/ Orbit/Trinic/Panasonic b) LED MAKE : Bridge Lux / LUMILEDS / CREE / NICHIA / SAMSUNG/ Sunpo

6

-

920

... More
Supply of 1 Module Modular type Electronic step type Fan Regulator with 2 Module Hot Dip Galvanized Modular Metal Box covered with 2 modular cover frame etc., complete. Makes : GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge.

3

-

624

... More
Providing independent earthing by excavating a trench to a depth of 2.1 M in all soils, as per size specified in the Data, using 40mm dia 'B' class GI pipe of 2.5 Mtrs length with necessary accessories with hume pipe ring duly providing staggered holes including filling with equal proportion of Salt and Charcoal in layers and all labour charges etc., complete for small quarters.

1

-

3821.56

... More
Earth work excavation for foundations (Manual Means) of buildings in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work including seigniorage excluding dewatering charges etc., as per SS 20 B(APSS 308)

27.78

-

238.32

... More
Earth work excavation for foundations (Mechnical Means) of buildings in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work including seigniorage excluding dewatering charges etc., as per SS 20 B(APSS 308)

64.81

-

115.36

... More
Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

184.23

-

331.16

... More
Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 20mm size hard , machine crushed trap from approved quarry including cost and conveyance of all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402) ( (BLD-CSTN-3-5))

22.05

-

3978.18

... More
Pre construction Anti termite is a process in which chemical toxic to subterrean termites is apply/ inject into soil during early stage of building Construction 2. Treatement of soil Beneath the building and around the foundations conduct and chemical use as per BIS - IS 6313 (Part -2) 2013 code specification & CIB RC registered termiticide which creates a continuous chemical barrier beneath the building which kills or repels terminates & impervious to tremite entry 3. Imidacloprid 30.5% SC (IS 63131) dissolve 2.1 Ml/1 liter of water and apply emulsion/solution @ 7.5 Litres/Square meter (Sqm) of internal, external vertical surface of the colums , plinth beams (Back filling) walls and floor junction, external perimeters, along reatining wall @ 5.0 Liters/Sqm of the horizontal surface of basement top surface of the basement filling below flooring bed (Plinth) & @ 2.0 Litres/ Line meter at expansion joints. The substructure of a depth of 500mm around coulmns & 300mm deep around plinth beams, basements & floor filling area including excavation channel along the wall & rodding etc. cost & Conveyance of all materials to the site, cost of labour for sparying, rodding etc. complete for furnished item of work as per the approval of the Engineer-in-charge.

242.05

-

170.42

... More
Supply and placing of the Design Mix Concrete M20 (350kg Cement) corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. (BLD-CSTN-3-14) FOOTINGS

6.91

-

8646.77

... More
PLINTH BEAMS

8.19

-

11222.28

... More
COLUMNS

5.91

-

11666.35

... More
ROOF BEAMS

17.9

-

10908.92

... More
LINTEL BEAMS

1.27

-

12323.31

... More
SLAB

28.05

-

9742.48

... More
Supplying, fitting and placing Fe - 500 HYSD bar reinforcement complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage,where they are not welded including cost and conveyance of steel, binding wire etc., lifting charges of steel , placing in position, tying with binding wire, all tools etc., and overheads & contractors profit complete for finished item of work ( APSS No.126 )

7808.87

-

87.93

... More
Damp proof course 50mm thick with 1:2:4 cement concrete Nominal mix, using 12mm hard broken stone aggregate including cost of all materials, seigniorage charges, excluding conveyance charges of materials including the cost of machinery, labour charges, mixing, placing in position, leveling, vibrating, curing etc. complete for finished item of work. (Using concrete mixer)

22.5

-

200.35

... More
CR stone masonry in 2nd sort in CM (1:6) prop: (cement : sand) using hard granite stones from approved quarry including cost and conveyance of all materials like cement, sand water, granite stones, etc., from approved quarry to site and including labour for cutting stones to required size and shape, mixing of cement, mortar, construction, scaffolding charges, curing etc., and overheads & contractors profit, complete for finished item of work in foundation & basement. (APSS No. 615 & 601)

16.88

-

4355

... More
Supply & construction of Brick Masonry in CM (1:6) with 2nd class Bricks traditional size 23x11x7 2nd class with compressive of 37 Kgs / Sqcm from approved source including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504). (BLD-CSTN-5-4)

41.18

-

5981.12

... More
Plastering 12mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904)

347.8

-

298.15

... More
Plastering 25mm to 40mm thick base plastering 12mm to 20 mm in CM (1:3) and top finishing 12mm thick with CM (1:2) to bring the required ornamentation including fine rendering with neat cement cost and conveyanceof all materials, labour charges, all incidental and operational charges curing, lifting, scafolding charges etc. for external surface as per approved drawings and as directed during execution including preparation and fixing precast pillars, kudam,palakai, vedika. Lathalu in Uttara Eludhakam, pothikas, nasigudu. pupha puskala adihishtanam, wherever necessary and including overheads and contractors profit, excluding GST on all materials etc.Complete for finished item of work(as per silpi SSR 19-20) (1st class ornamentation work

25.8

-

1237.6

... More
Plastering 20mm thick in two coats using screened sand with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc.,complete for External uneven surfaces of Brick wall and RCC exposed surface and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) for :- Plastering 2/c in CM(1:4) & (1:6) 20mm

251.4

-

412.61

... More
Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903).

175

-

493.79

... More
Supplying and fixing FOLDABLE SHUTTER DOOR using Medium Teak wood Door Frame section of 125*75 MM is fixed to wall using MS Z Hold fast 300 MM long. including Door top arch with tinted glass of 5MM thickness , Medium Teak wood door shutters - 35 mmthick as per drawing including cost of Brass fixtures such as 12 Nos. Butt hinges 125mm long, 4 No tower bolt of 200x10mm dia, 1 No. Aldrops - 300 mm long, 1No. Latche-300mm long, 6 Nos. handles of 150 mm size & 1 Nos. Heavy duty door stoppers including fixing the fixtures to door with required no. of screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc., complete for finished item of work. (Door size 1.5 X 2.7m)

3.15

-

14266.49

... More
Providing and fixing factory made uPVC white colour sliding glazed doorcomprising of uPVC multi-chambered frame with in-built roller track andsash extruded profiles duly reinforced with 1.60 ± 0.2 mm thick galvanizedmild steel section made from roll forming process of required length (shape & size according to uPVC profile), appropriate dimension uPVCextruded glazing beads, uPVC extruded interlock and uPVC extrudedInline sash adaptor (if required), EPDM gasket, wool pile, zinc alloy(white powder coated) handle with key on one side of extreme panels along with zinc plated mild steel multi point locking having transmissiongear with keeps, zinc alloy (white powder coated) cresent lock (ifrequired), stainless steel (SS 304 grade) body with adjustable doublenylon rollers (weight bearing capacity to be 120 kg), G.I fasteners 100 x 8 mm size for fixing frame to finished wall and necessary stainless steelscrews etc. Profile of frame & sash shall be mitred cut and fusion weldedat all corners, including drilling of holes for fixing hardware's and drainageof water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled with weather proof silicon sealent over backerrod of required size and of approved quality, all complete as per approveddrawing & direction of Engineerin-Charge inclusive of cost of Single / double glass panes,wire mesh and silicon sealent . Note: For uPVC frame and sash extruded profiles minus 5% tolerancein dimension i.e. in depth & width of profile shall be acceptable. Variationin profile dimension in higher side shall be accepted but no extra payment on this account shall be made. BMT-N.85

33.6

-

7948.51

... More
Three track three panels sliding door with fly proof S.S wire mesh (Two Nos. glazed & one no. wire mesh panels) made of(big series) frame 116 x 45 mm & sash 46 x 82 mm both having wall thickness of 2.3 ± 0.2 mm and single glazing bead / double glazing bead of appropriate dimension. (Area of door above 2.00 Sqm upto 5.00 Sqm) BMT-N.85.B

-

-

-

... More
Supply and fabricating steel works like Window Grills, Compound Wall Grills, Iron Doors, Windows including cost of welding rods, power charges, including cost of fixing in position including all cost and conveyance of materials and all labour charges for cutting, bending to required shape welding including cost of weilding rods griding etc complete with all taxes etc., complete for finished item of work as per the approval of the Engineer-in-Charge.

450

-

106.35

... More
Painting with Priming Coat to given an even shade after throughly brushing the surface to remove all dirt and remains of losse powdered materials, including cost and conveyance of all materials to work site and all operational incidental labour charges etc., complete for finished item of work as per SS

34.6

-

59.31

... More
Painting with Synthetic Enamel paints -one coat - for New wood work, old wood work & New Iron work to given an even shade after throughly brushing the surface to remove all dirt and remains of losse powdered materials, including cost and conveyance of all materials to work site and all operational incidental labour charges etc., complete for finished item of work as per SS

34.6

-

63.18

... More
Supply & applying Melamine Polish Glossy/ Matt finish to the wood works duly cleaning the surface and applying emery paper, Sand the wood with 180 No., emery paper and then with 320 No., emery paper, clean & wipe off loose dust, applying suitable knifing paste filler / wood filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper, apply two component wood sealer, air dry for 24 hrs, Sand with 320 No emery paper, applying one coat of approved spraying thinner (for spraying)/ applying one coat of approved brushing thinner or general purpose thinner (for brushing) and apply (either with spray or brush) two coats of approved brand melamine including cost & labour charges, emery papers, cost of thinner & melamine polish of approved brands such as Jenson & Nicholson, Asian Paints, Berger Paints or equivalent etc., complete for finished item of work

7.2

-

1257.51

... More
Providing and applying synthetic plaster putty or plaster of paris putty or lime punning of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for Internal walls

347.8

-

200.02

... More
Dadooing to walls withglazed red or white full body ceramic wall tiles of Size 300 x 450 mm / 320 mm x 400 mm and thickness 6 mm and 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of C.M (1:5) proportion, 12mm thick and neat grey cement slurry of honey like consistency, spread at the rate of 3.3Kgs per Sqm and jointed with white cement or coloured cement to match the shade of the tiles, including cost and conveyance of all materials like cement, sand, water, tiles, coloured cement, overheads & contractors profit etc., to site, all labour charges for mixing of cement mortar, laying glazed tiles to level, curing etc., complete for finished item of work as directed by Engineer-in-charge.

24

-

586.44

... More
Painting to new walls with 2 coats of acrylic emulsion paint of approved brand (Asian/Berger/Nerolac/Saicoat/Indocem or equivalent) and shade over base coat of approved cement primer grade-1 making 3 coats in all to give even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges , overheads & contractors profit etc., complete for finished item of work as per SS 911 Internal colouring

347.8

-

151.22

... More
Painting to new walls with 2 coats of Acrylic emulsion paint of approved brand (Asian/Berger/Nerolac/Saicoat/Indocem or equivalent) and shade over base coat of approved cement primer grade-1 making 3 coats in all to give even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges , overheads & contractors profit etc., complete for finished item of work as per SS 911 External colouring

277.2

-

162.32

... More
Flooring with vitrified polished/Semi-polished floor tiles of 1st quality and make as approved by Engineer-in-charge of size not less than 600 mm x 600 mm , 8-10 mm thickness of any color finish and all shades and designs with borders and design as per the approved flooring pattern as directed by the Engineer-In -Charge set over a base coat of CM (1:8) prop. 12mm thick using screened sand over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 Kgs per Sqm. and jointed neately with white cement paste to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, white cement etc., to site (excluding cost of C.C. bed) and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge etc.,and overheads & contractors profit complete for finished item of work. (APSS No.701 & 707)

186.7

-

1238.39

... More
Providing skirting to internal walls to 15 cm height with vitrified tiles 8mm thick , regular finish and normal colour, length equal to flooring tiles, set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 Kgs per Sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc.,and overheads & contractors profit complete excluding seigniorage charges etc., complete for finished item of work.(APSS No.701 &707)

7.5

-

1240.88

... More
Supplying and fixing stainless steel works such as railing, hand rale, grills etc., using Stainless Steel Tubes of 304 Grade as per the approved drawing including cost and conveyance of all materials to site, Labour charges for Fabrication of stainless steel works using stainless steel welding rods including buffing, polishing, lacquer finishing, to present seamless finish, overheads & contractors profit etc ., complete for finished item of work.

50

-

598.51

... More
Supply and Fixing of 25mm outer dia heavy (2.20mm thickness) grade, FRLS with IS:9537 part 3 regid PVC pipe (ISI mark) concealed in wall with all required accessories including masonary work for light, fan , common and separate plug point including all labour charges etc., complete. Makes : Sudhakar / Modi ( ISI mark).

200

-

86.82

... More
Supply and fixing of 6A / 10A 3/2 Pin 2 Module Modular Socket with shutter with 6A / 10A 1 Way 1 Module Modular Switch control on a Common switch board with with 3 Module Hot Dip Galvanized Modular Metal Box covered with 3 Modular Cover Frame with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Modular Switch, Socket, Metal box & Cover frame Make:GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge.

10

-

472.69

... More
Supply and Fixing of 20A 2 Module Modular Socket with shutter and 16A / 20A 1 Way 1 Module Modular Switch duly recessed in wall with 3 Module Hot Dip Galvanized Modular Metal Box size covered with 3 Modular Cover Frame including earth connections and all labour charges etc., complete.[ Power plug ] Modular Switch,socket,metal box & Cover frame Make:GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge.

8

-

655.5

... More
Supply and run of 2 of 36/0.3mm (2.5 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for mains inlcuding all labour charges etc., complete. Makes: Polycab /RPG / Million / Power Flex / Anchor / V-Guard.

400

-

74.59

... More
Supply and run of 2 of 140/0.3mm (10.0 Sqmm) PVC FRLS / HFFR insulated flexible Copper cable in existing pipe for mains including all labour charges etc., complete. Makes: :Polycab /RPG / Million / Power Flex / Anchor / V-Guard.

200

-

230.05

... More
Fixing of 20W/18W led tube light luminaire on wall / Ceiling with / TW /PVC round blocks with all accessories including giving connections and all labour charges etc., complete.

12

-

147.59

... More
Supply and transportation of 20W, 2000 lumins, 1200mm length, T8 LED tube light fitting with extruded alluminium housing, input voltage AC 165 - 260 Volts with 0.9 PF with driver and frosted cover etc., complete with 3 years warranty. Luminaire Make : Phillips / Osram / GE / Crompton /VIN / Bajaj / Havells / Halonix.

12

-

792

... More
Supply and fixing of 18W heavy duty LED Down lighter, suitable for Recessed / Surface mounting made of pressure diecast alluminium body with powder coating, acrylic diffuser with Driver as per IS: 15885 (Part 2/ Sec 13) : 2012 , operating voltage range of 150 to 265 Volts AC, P.F 0.9, Surge protection: 2KV, THD10% with high power LED's having efficacy of 80 lumins / watt, CCT: 3000K -5700K, minimum CRI 70, Luminaire performance complies to IS 10322 (Part 5 / Sec-3) etc., completea) LUMINAIRE MAKE : Pasolite / Cosmo / Siger/ Koncept/ Kiran/Vibrant/Leo/Lumens/Iliteb) LED MAKE : CREE / NICHIA / OSRAM / SAMSUNG / EVERLIGHT

8

-

1449

... More
Supply and fixing of 4 Way VTPN DB suitable for accomodating 125A 4 Pole MCCB as incomer and 63A,10KA, TP MCBs-4 Nos as outgoing and with IP 43 Protection including internal connection and labour charges for surface / flush mounting etc., complete. Incommer: 125A,4P,25KA MCCB-1No. Outgoing: 63A, 10KA , TP MCB's -4 Nos DB Makes : Legrand / Schneider. MCCB Make: L&T / Schneider / Siemens / Legrand. MCB Make: Legrand-DX3 / Schneider-Acti9.

1

-

23401

... More
Supply of 56" (1400mm) Sweep 5 star rated BLDC (Brush less Direct Current) Ceiling Fan with double ball bearings, input voltage 230V AC converted to 24 V DC, power input not more than 32W , air delivery not less than 240 cubic meter/min with remote and without Regulator. Makes : Atomberg(Gorilla GV2 )/ Halonix(Plasma) /Havells(Efficiencia)

14

-

3945

... More
Labour charges for Fixing of Ceiling fan and regulator including transportation and giving connections with twin core wire etc., complete.

14

-

167.81

... More
Supply and fixing of 7W LED COB Spot Light, suitable for Recessed mounting made of diecast alluminium body with powder coating, with Driver, operating voltage range of 150 to 265 Volts AC, CCT: 3000K - 5700K, minimum CRI70, .etc., complete Makes : Surya /C&S / Syska / Enrich / Stanjo / Polycab/ Ib LED/ Opple/R LED/Luker/ Orbit/Trinic/Panasonic b) LED MAKE : Bridge Lux / LUMILEDS / CREE / NICHIA / SAMSUNG/ Sunpo

24

-

920

... More
Supply of 1 Module Modular type Electronic step type Fan Regulator with 2 Module Hot Dip Galvanized Modular Metal Box covered with 2 modular cover frame etc., complete. Makes : GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge.

14

-

624

... More
Providing independent earthing by excavating a trench to a depth of 2.1 M in all soils, as per size specified in the Data, using 40mm dia 'B' class GI pipe of 2.5 Mtrs length with necessary accessories with hume pipe ring duly providing staggered holes including filling with equal proportion of Salt and Charcoal in layers and all labour charges etc., complete for small quarters.

1

-

3821.56

... More
Earth work excavation for foundations (Manual Means) of buildings in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work including seigniorage excluding dewatering charges etc., as per SS 20 B(APSS 308)

6.55

-

238.32

... More
Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

0.77

-

331.16

... More
Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 20mm size hard , machine crushed trap from approved quarry including cost and conveyance of all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402) ( (BLD-CSTN-3-5))

0.44

-

3978.18

... More
Supply and placing of the Design Mix Concrete M20 (350kg Cement) corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. (BLD-CSTN-3-14)Footings

0.61

-

8646.77

... More
Plinth beam

0.43

-

11222.28

... More
Columns

2.34

-

11666.35

... More
Roof beams

0.72

-

10908.92

... More
Slab

2.24

-

9742.48

... More
Supplying, fitting and placing Fe - 500 HYSD bar reinforcement complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage,where they are not welded including cost and conveyance of steel, binding wire etc., lifting charges of steel , placing in position, tying with binding wire, all tools etc., and overheads & contractors profit complete for finished item of work ( APSS No.126 )

965.85

-

87.93

... More
CR stone masonry in 2nd sort in CM (1:6) prop: (cement : sand) using hard granite stones from approved quarry including cost and conveyance of all materials like cement, sand water, granite stones, etc., from approved quarry to site and including labour for cutting stones to required size and shape, mixing of cement, mortar, construction, scaffolding charges, curing etc., and overheads & contractors profit, complete for finished item of work in foundation & basement. (APSS No. 615 & 601)

1.67

-

4355

... More
Supply & construction of Brick Masonry in CM (1:6) with 2nd class Bricks traditional size 23x11x7 2nd class with compressive of 37 Kgs / Sqcm from approved source including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504). (BLD-CSTN-5-4)

5.43

-

5981.12

... More
Plastering 25mm to 40mm thick base plastering 12mm to 20 mm in CM (1:3) and top finishing 12mm thick with CM (1:2) to bring the required ornamentation including fine rendering with neat cement cost and conveyanceof all materials, labour charges, all incidental and operational charges curing, lifting, scafolding charges etc. for external surface as per approved drawings and as directed during execution including preparation and fixing precast pillars, kudam,palakai, vedika. Lathalu in Uttara Eludhakam, pothikas, nasigudu. pupha puskala adihishtanam, wherever necessary and including overheads and contractors profit, excluding GST on all materials etc.Complete for finished item of work(as per silpi SSR 19-20) (1st class ornamentation work

32.24

-

1237.6

... More
Plastering 20mm thick in two coats using screened sand with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc.,complete for External uneven surfaces of Brick wall and RCC exposed surface and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) for :- Plastering 2/c in CM(1:4) & (1:6) 20mm

85.14

-

412.61

... More
Supply and fabricating steel works like Window Grills, Compound Wall Grills, Iron Doors, Windows including cost of welding rods, power charges, including cost of fixing in position including all cost and conveyance of materials and all labour charges for cutting, bending to required shape welding including cost of weilding rods griding etc complete with all taxes etc., complete for finished item of work as per the approval of the Engineer-in-Charge.

1360

-

106.35

... More
Painting with Priming Coat to given an even shade after throughly brushing the surface to remove all dirt and remains of losse powdered materials, including cost and conveyance of all materials to work site and all operational incidental labour charges etc., complete for finished item of work as per SS

28

-

59.31

... More
Painting with Synthetic Enamel paints -one coat - for New wood work, old wood work & New Iron work to given an even shade after throughly brushing the surface to remove all dirt and remains of losse powdered materials, including cost and conveyance of all materials to work site and all operational incidental labour charges etc., complete for finished item of work as per SS

28

-

63.18

... More
Providing and applying synthetic plaster putty or plaster of paris putty or lime punning of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for Internal walls

117.38

-

200.02

... More
Painting to new walls with 2 coats of acrylic emulsion paint of approved brand (Asian/Berger/Nerolac/Saicoat/Indocem or equivalent) and shade over base coat of approved cement primer grade-1 making 3 coats in all to give even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges , overheads & contractors profit etc., complete for finished item of work as per SS 911 Internal colouring

117.38

-

151.22

... More
Supply and Fixing of 25mm outer dia heavy (2.20mm thickness) grade, FRLS with IS:9537 part 3 regid PVC pipe (ISI mark) concealed in wall with all required accessories including masonary work for light, fan , common and separate plug point including all labour charges etc., complete. Makes : Sudhakar / Modi ( ISI mark).

15

-

86.82

... More
Supply and Fixing of 20A 2 Module Modular Socket with shutter and 16A / 20A 1 Way 1 Module Modular Switch duly recessed in wall with 3 Module Hot Dip Galvanized Modular Metal Box size covered with 3 Modular Cover Frame including earth connections and all labour charges etc., complete.[ Power plug ] Modular Switch,socket,metal box & Cover frame Make:GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge.

1

-

655.5

... More
Supply and run of 2 of 36/0.3mm (2.5 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for mains inlcuding all labour charges etc., complete. Makes: Polycab /RPG / Million / Power Flex / Anchor / V-Guard.

20

-

74.59

... More
Supply and run of 2 of 140/0.3mm (10.0 Sqmm) PVC FRLS / HFFR insulated flexible Copper cable in existing pipe for mains including all labour charges etc., complete. Makes: :Polycab /RPG / Million / Power Flex / Anchor / V-Guard.

30

-

230.05

... More
Supply and fixing of 18W heavy duty LED Down lighter, suitable for Recessed / Surface mounting made of pressure diecast alluminium body with powder coating, acrylic diffuser with Driver as per IS: 15885 (Part 2/ Sec 13) : 2012 , operating voltage range of 150 to 265 Volts AC, P.F 0.9, Surge protection: 2KV, THD10% with high power LED's having efficacy of 80 lumins / watt, CCT: 3000K -5700K, minimum CRI 70, Luminaire performance complies to IS 10322 (Part 5 / Sec-3) etc., completea) LUMINAIRE MAKE : Pasolite / Cosmo / Siger/ Koncept/ Kiran/Vibrant/Leo/Lumens/Iliteb) LED MAKE : CREE / NICHIA / OSRAM / SAMSUNG / EVERLIGHT

4

-

1449

... More
Supply and fixing of 7W LED COB Spot Light, suitable for Recessed mounting made of diecast alluminium body with powder coating, with Driver, operating voltage range of 150 to 265 Volts AC, CCT: 3000K - 5700K, minimum CRI70, .etc., complete Makes : Surya /C&S / Syska / Enrich / Stanjo / Polycab/ Ib LED/ Opple/R LED/Luker/ Orbit/Trinic/Panasonic b) LED MAKE : Bridge Lux / LUMILEDS / CREE / NICHIA / SAMSUNG/ Sunpo

14

-

920

... More
Earth work excavation for foundations (Manual Means) of buildings in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work including seigniorage excluding dewatering charges etc., as per SS 20 B(APSS 308)

58.47

-

238.32

... More
Earth work excavation for foundations (Mechnical Means) of buildings in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work including seigniorage excluding dewatering charges etc., as per SS 20 B(APSS 308)

233.87

-

115.36

... More
Providing Sand filling below foundation, behind abutment and return walls in layers including cost of all materials, machinery, labour, watering, ramming etc., complete with initial lead upto 50 m and initial lift upto 3 m.

16.61

-

331.16

... More
Plain Cement Concrete (1:3:6) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 20mm size nominal aggregate machine crushed hard granite metal (coarse aggregate) from approved quarry from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, excluding seigniorage charges, sales & other taxes on all materials and including all charges for mixing, laying concrete, curing etc., complete for finished item of work. (APSS No. 402) for:-Hand Mix-PCC (1:3:6) NOMINAL MIX

28.79

-

3978.18

... More
Supply and placing of the Design Mix Concrete M20 (350kg Cement) corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. (BLD-CSTN-3-14) For Footing

26.16

-

8646.77

... More
For Columns

13.67

-

11666.35

... More
For Plinth Beam

15.95

-

11222.28

... More
Supplying, fitting and placing Fe - 500 HYSD bar reinforcement complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage,where they are not welded including cost and conveyance of steel, binding wire etc., lifting charges of steel , placing in position, tying with binding wire, all tools etc., and overheads & contractors profit complete for finished item of work ( APSS No.126 )

2789

-

87.93

... More
Supply & construction of Brick Masonry in CM (1:6) with 2nd class Bricks traditional size 23x11x7 2nd class with compressive of 37 Kgs / Sqcm from approved source including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504). (BLD-CSTN-5-4)

104.01

-

5981.12

... More
CR stone masonry in 2nd sort in CM (1:6) prop: (cement : sand) using hard granite stones from approved quarry including cost and conveyance of all materials like cement, sand water, granite stones, etc., from approved quarry to site and including labour for cutting stones to required size and shape, mixing of cement, mortar, construction, scaffolding charges, curing etc., and overheads & contractors profit, complete for finished item of work in foundation & basement. (APSS No. 615 & 601)

31.2

-

4355

... More
Plastering 20mm thick in two coats using screened sand with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc.,complete for External uneven surfaces of Brick wall and RCC exposed surface and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) for :- Plastering 2/c in CM(1:4) & (1:6) 20mm

1280

-

412.61

... More
Painting to new walls with 2 coats of acrylic emulsion paint of approved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for external walls for:-External Colouring - acrylic emulsion paint - 3 Coats

1280

-

162.32

... More
Supply and fabricating steel works like Window Grills, Compound Wall Grills, Iron Doors, Windows including cost of welding rods, power charges, including cost of fixing in position including all cost and conveyance of materials and all labour charges for cutting, bending to required shape welding including cost of weilding rods griding etc complete with all taxes etc., complete for finished item of work as per the approval of the Engineer-in-Charge.

4800

-

106.35

... More
Painting with Synthetic Enamel paints -one coat - for New wood work, old wood work & New Iron work to given an even shade after throughly brushing the surface to remove all dirt and remains of losse powdered materials, including cost and conveyance of all materials to work site and all operational incidental labour charges etc., complete for finished item of work as per SS

96

-

63.18

... More
Earth work excavation for foundations (Manual Means) of building foundations, footings, walls, sump, compound wall in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting etc., as per GFC drawings issued by the Employer and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308)

17

-

238.32

... More
Filling with Sand in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

105

-

597.3

... More
Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. as per GFC drawings issued by the Employer to site, including sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed of 0.1m layer ramming finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402)

12.6

-

3978.18

... More
Flooring with precast concrete blocks for paving of M-35 grade and thickness not less than 60 mm for light traffic areas conforming to IS 15658:2006 in all shapes and designs as per the manufacturer's specification including Labour charges for laying & fixing of precast concrete blocks for paving of all grades, any thickness, all sizes & shapes including all labour charges for loading & unloading, laying to desired lines and levels complete excluding cost of cement, sand, water, electricity etc and all operational, incidental, labour charges etc., complete for finished item of work as per (APSS No.709)

1050

-

635.61

... More
Cast in Situ Cement Concrete M20 Kerb - Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408 MORTH

420

-

297.27



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.