Municipality Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Municipality Tender

Works
Civil And Construction
Bridge Construction
Opening Date3 Jan 2025
Closing Date7 Jan 2025
Tender Amount₹ 1,79,286 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Laying V.C.C. (1:4:8) mix using 40mm size HBG metal from approved quarry including mixing by machine and depositing the premium inposition vibrating and watering for curing including cost and conveyance of all materials and all labour charges etc complete as per SS and as directed by the Engineer-in-charge.

1.8

5215

9388.55

... More
Laying Vibrated Reinforced cement concrete M 30 Nominal mix using graded HBG metal including cost and conveyance of all materials land labour charges for centering, machine mixing, laying, vibrating and curing etc. including all other incidental charges of all T&P etc. for finished item of work for culvert Bottem

1.8

5800

10440.31

... More
Laying Vibrated Reinforced cement concrete M 30 Nominal mix using graded HBG metal including cost and conveyance of all materials land labour charges for centering, machine mixing, laying, vibrating and curing etc. including all other incidental charges of all T&P etc. for finished item of work for RCC Precast slabs

2.28

6294

14339.95

... More
Laying Vibrated Reinforced cement concrete M 30 Nominal mix using graded HBG metal including cost and conveyance of all materials land labour charges for centering, machine mixing, laying, vibrating and curing etc. including all other incidental charges of all T&P etc. for finished item of work For Culvert Side walls

4.2

6024

25304.96

... More
Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded. BLD-CSTN-2-18

993.37

90

89532.89

... More
Laying Vibrated cement concrete M 30 Nominal mix using 20mm graded HBG machine crushed graded metal from approved quarry including cost and conveyance of all materials land labour charges for centering, machine mixing, laying, vibrating and curing etc. including all other incidental charges for finished item of work as per ss and as directed by the depermental engineers in charge.

3.5

6369

22291.78

... More
Laying V.C.C. (1:2:4) mix using 20mm size HBG metal from approved quarry including mixing by machine and depositing the premium inposition vibrating and watering for curing including cost and conveyance of all materials and all labour charges etc complete as per SS and as directed by the Engineer-in-charge.

0.5

5771

2885.72



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.