Municipality Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Municipality Tender

Opening Date20 Dec 2021
Closing Date18 Jan 2022
Tender Amount₹ 9,69,58,991 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Garbage Transfer Station;Earth work excavation for removal of stumps and other deleterious materials foundations (Mechanical Means) for buildings in ordinary soils and depositing on bank for all lifts and with an initial lead 1 of 50m and up to 3m depth including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding seigniorage excluding dewatering charges etc.,

9000

-

1038240

... More
Construction of Garbage Transfer Station;Conveyance of un-useful excavated earth to a distance of 2 Km for disposal including hire charges of T & P, labour charges etc., and overheads & contractors profit complete for finished item of work.

9000

-

342000

... More
Construction of Garbage Transfer Station;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size graded hard , machine crushed trap from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, excluding seigniorage charges, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc.,and overheads & contractors profit complete for finished item of work. (APSS No. 402)

237.81

-

994759

... More
Construction of Garbage Transfer Station;Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH.

199.2

-

422794

... More
Construction of Garbage Transfer Station;Cement concrete pavement : Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, near approaches to bridge/culvert and construction joints, curing of concrete slabs for 14-days and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 of MORD

288.42

-

1641713

... More
Construction of Garbage Transfer Station;Supply and placing of the Design Mix Concrete M25 (380kg Cement) corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. (BLD-CSTN-3-14) Footings

171.5

-

1568153

... More
Construction of Garbage Transfer Station;Supply and placing of the Design Mix Concrete M25 (380kg Cement) corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. (BLD-CSTN-3-14) -Plinths Beam

60.76

-

712063

... More
Construction of Garbage Transfer Station;Supply and placing of the Design Mix Concrete M25 (380kg Cement) corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. (BLD-CSTN-3-14) -Columns

43.92

-

528705

... More
Construction of Garbage Transfer Station;Supply and placing of the Design Mix Concrete M25 (380kg Cement) corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. (BLD-CSTN-3-14) -Roof Beams

54.63

-

616226

... More
Construction of Garbage Transfer Station;Supply and placing of the Design Mix Concrete M25 (380kg Cement) corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. (BLD-CSTN-3-14) - Slabs (Ramp Slab of 200mm thick)

154.74

-

1423015

... More
Construction of Garbage Transfer Station;Supplying, fitting and placing Fe - 500 HYSD bar reinforcement complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage,where they are not welded including cost and conveyance of steel, binding wire etc., lifting charges of steel , placing in position, tying with binding wire, all tools etc., and overheads & contractors profit complete for finished item of work ( APSS No.126 )

79219.09

-

6492004

... More
Construction of Garbage Transfer Station;Masonry work in CM (1:6) prop with flyash cement solid blocks of size 290 x 225 x 140mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs and stone dust including cost and conveyance of all materials,labour chargesscaffolding and curing etc., complete with a compressivre strength not less than 50kg/sqm for walls for supersatructure walls.etc., complete for finished item of work. (APSS No. 501 & 504)

430.65

-

2818914

... More
Construction of Garbage Transfer Station;Plastering 20mm thick in two coats using screened sand with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc.,complete for External uneven surfaces of Brick wall and RCC exposed surface and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) for :- Plastering 2/c in CM(1:4) & (1:6) 20mm

1275.2

-

587204

... More
Construction of Garbage Transfer Station;Painting to new walls with 2 coats of plastic emulsion paint of approved brand (Asian/Berger/Nerolac/Saicoat/Indocem or equivalent) and shade over base coat of approved cement primer grade-1 making 3 coats in all to give even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges , overheads & contractors profit etc., complete for finished item of work as per SS 911 Internal colouring

1275.2

-

177062

... More
Construction of Garbage Transfer Station;Supply delivery and fixing of Trusses, Stanchions, Heavy Beams and Girders of approved size and design including cost and conveyance of all materials and labour for fixing etc., complete for finished item of work including all cost and conveyance of materials and all labour charges for cutting, bending to required shape welding including cost of weilding rods griding etc complete with all taxes etc., complete for finished item of work as per the approval of the Engineer-in-Charge.

12000

-

1452120

... More
Construction of Garbage Transfer Station;Roofing: - Roofing will be provided with 0.8 mm thick galvanized/prepainted G.I. profiled sheets fixed to the purlins with 14size self drilling screws withn eoprene washer. Side laps are stitched with self tapping / drilling screws. End laps are to be sealed with 25x3mm Butyl tape. The sheets are provided withanticapillarygrove.

391

-

337617

... More
Construction of Garbage Transfer Station;Cast in Situ Cement Concrete M20 Kerb - Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408 MORTH

495

-

144609

... More
Construction of Garbage Transfer Station;Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

2571

-

851412

... More
Construction of Garbage Transfer Station;Cost of Equipment (Stationary Compactors 2 Nos, 1 No of Hook Loader Trucks, 2 nos of 20cu.M. Containers & 2 nos of Weigh Bridge of capacity 40 Tons

-

-

-

... More
Construction of Garbage Transfer Station;Supply, delivery and Installation of 2 nos of STATIC or Stationary Compactors with sealing system, hopper, Compaction housing, Campaction chamber,Crusher block, Tip cart ,Energy saving and intelligent control system, power drive unit, coupling claws, push pull, advanced drainage system. TYPICAL SPECIFICATIONS OF THE ITEM: Compaction Chamber Volume -3 cum ,Compaction cycle time- 41 seconds, Theoretical volumetric capacity-26m3/h, Normal pressure-26Mpa, Max pressure-30Mpa, Normal compaction force-320kN, Max compaction force-370kN, Power-11KW, Distance into container-500mm, Voltage-440V, Compaction Ratio-0.6 - 0.65t/m3, Tip Cart Volume-4m3 etc. complete for finished item of work with one year warranty and as directed and approved by the Engineer-in-Charge and exclusive of all taxes.

2

-

18983050

... More
Construction of Garbage Transfer Station;Supply, delivery and Installation of Hook Loader Trucks consisting of Tipping Frame, Off ? loading frame, Bottom Frame, Hook Mast, Bottom Frame, Hook with container safety lock with a capacity of 200 kN, Hook Height of 1570 mm and be mounted on a truck chassis of 28 T GVM (6X2) of TATA / ASHOK LEYLAND/ EICHER or equivalent make with Non Sleeper Driver Cabin fitted with PTO and Hydraulic Pump having Kerb weight not less than 6200 kg and wheel base not less than 4800 mm. BS ? VI Emission norms and ARAI Approved with one year warranty . The rate is inclusive of all permits & exclusive of all taxes.and as directed and approved by the Engineer-in-Charge etc.

1

-

6100000

... More
Construction of Garbage Transfer Station;Supply and delivery of 2nos of 20cu.M. Containers with Guillotine and advanced drainage and sealing system having a reinforced bottom, walls and roof with main reinforcement as well as longitudinal reinforcement at each side to avoid deformation of the container during compaction and with round shaped corners making discharging of the contents smoother and at a lower tipping angle. The front of the container shall have a V-shaped structure with a hook eye and shall bear the forces during on and off-rolling of the container on the hook loader system. The Container shall have two heavy duty solid rollers at the rear side.The guillotine shall have optimized hydraulic system to balance the stroke of both cylinder at the same time.The rate is and exclusive of all taxes.and as directed by the Engineer-in-Charge

2

-

2110000

... More
Construction of Garbage Transfer Station;Supply and integration of 2 No's of Weigh Bridge 40 Ton each, 9mx3m,2 No's Boom Barrier,2 No's RFID Reader,50 No's RFID Tags, All Hardware and Software Deployment for integration of RFID systems and Weigh bridges, all charges including software & exculsive of all taxes and as directed and approved by the Engineer-in-Charge etc

1

-

4050000

... More
Construction of Garbage Transfer Station;Operations and Maintenance of Garbage Transfer Station for Five years

-

-

-

... More
Construction of Garbage Transfer Station;Engaging of original equipment manufacturer(OEM ) Certified / approved / trained Technician (ITI Qualified) to perform all kinds of Preriodic, Preventive Maintenance & repairs of all equipment part of Scientific Garbage Transfer Station etc... as directed by ULB authorties

365

-

271626

... More
Construction of Garbage Transfer Station;Engaging of 2 nos of OEM certified / approved / trained operator for operation of 2 units of Stationery Compactors etc... as directed by ULB authorties

365

-

534959

... More
Construction of Garbage Transfer Station;Engaging of qualified Weigh Bridge Operator for operation of 2 units of Stationery Compactors etc... as directed by ULB authorties

365

-

238451

... More
Construction of Garbage Transfer Station;Engaging of Skilled and Experienced Driver with Heavy Vehicle operating License & OEM Certified / Authorized / Trained to operate Hook Loader for driving Truck fitted with Hook Loader and Container from Scientific Garbage Transfer Station at Pulivendula and transport garbage to wet and dry waste processing centers for 2 Trips/day

365

-

263333

... More
Construction of Garbage Transfer Station;Engaging of trained and experienced security guards at Pulivendula Transfer station to be worked round the clock in 3 shifts for Scientific Garbage Transfer Station area

365

-

406398

... More
Construction of Garbage Transfer Station;Engaging of house keeping staff for Brooming Mopping (Wet & dry), windows cleaning along glass, toilets and washing and any other specific works as instructed by the ULB Authorities at Pulivendula Transfer station for cleaning of Scientific Garbage Transfer Station area.providing plumbing services with replacement of faulty or broken items including lights, fans & CCTV cameras etc...

365

-

406398

... More
Construction of Garbage Transfer Station;Supply and utilize OEM authorized recommended daily and periodically replaceable spares like Hoses, O-Rings, Fuse sockets,Bearings, Buttons, Switches, Relays and consumables like Filters, Seal Kits, Gaskets, strips, slides, Hydraulic oil replacement and providing OEM trained manpower for operation of Static Compactors? As directed by ULB Authorities

12

-

3749160

... More
Construction of Garbage Transfer Station;FMC Charges for Supply & utilize OEM recommended filters, seals and all other lubricants including but not limited to Engine, Brake & gear oils, Grease, Brake Pads, Brake Liners etc; Supply of Tyres, Tubes & Flaps (including day to day punctures) And Supply of fuel & DEF oil for a daily maximum usage of 100 km and a total of 3000 km per month for transportation of Garbage from Transfer Station to Dumpyard / Processing site... As directed by ULB Authorities

12

-

108000

... More
Construction of Garbage Transfer Station;Providing fuel for truck fitted with Hook Loader that carry closed Garbage container from Scientific Garbage Transfer Station at Pulivendula to transport garbage to wet and dry waste processing centers where a total distance of 20 kms of journey is travelled and a total of 2 trips per day is transported at an average fuel mileage of 2 km/l and fuel base price calculated at Rs.94.43/L = 7300 lit per Years . As directed by ULB Authorities

7300

-

689339

... More
Construction of Garbage Transfer Station;POWER 3000 Units per Month

36000

-

324000

... More
Construction of Garbage Transfer Station;-- do -- 2nd Year; 5% excess of 1st year

1

-

7341247

... More
Construction of Garbage Transfer Station;-- do -- 3rd Year; 5% excess of 2nd year

1

-

7708309

... More
Construction of Garbage Transfer Station;-- do -- 4th Year; 5% excess of 3rd year

1

-

8093725

... More
Construction of Garbage Transfer Station;-- do -- 5th Year; 5% excess of 4th year

1

-

8498411



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.