Municipality Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Municipality Tender

Civil And Construction
Civil Works Others
Opening Date11 Feb 2022
Closing Date25 Feb 2022
Tender Amount₹ 7,10,781 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Compound wall;Collection, supply,spreading of crusher stone dust and rolling with hand roller, watering, consolidated charges, all labour charges, spreading charges etc., complete as per SS and as Directed by Departmental officer incharge of the work for road base. RBR - FNDN - 2 / i

3.46

-

2670.88

... More
Construction of Compound wall;Plain cement concrete (1:4:8) using 40mm HBG crudhed metal from approved quarry including cost and conveyance of all materials and labour charges as per engineering in charges

2.66

-

10003.75

... More
Construction of Compound wall;Supply and placing of the design mix concrete corresponding to IS -456 using WEIGH BATCHER/MIXER using 20 mm size graded machine crushed hard granite metal (coarse agggregate) from approved quarry including cost and conveyance of all materials like cement,fine aggregate(sand),coarse aggregate ,water etc to site and including seigniorage charges ,sales and other taxes on all materials including all operational ,incidental and labour charges such as weigh batching ,machine mixing ,laying concrete ,curing etc complete but excluding cost of steel and its fabrication charges for finished item of work (APSS NO 402) with minimum cement content as per IS Code from standard suppliers approved by the deparment including pumping , centering,shuttering,laying concrete ,vibrating,curing etc M30 design mix unit 1.00cum

-

-

-

... More
Construction of Compound wall;VRCC M 30 for piles

6.26

-

51061.76

... More
Construction of Compound wall;VRCC M 30 for compound wall Columns

2.76

-

32201.55

... More
Construction of Compound wall;VRCC M 30 for compound wall Plinthe beam

5.9

-

71114

... More
Construction of Compound wall;Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded - BLD - CSTN - 2 / 18.

1481.58

-

114348.34

... More
Construction of Compound wall;Masonry work in CM (1:6) prop with Flyash Cement solid blocks of size 290 x 225 x 140 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and conveyance of all materials, labour charges, seiniorage charges, scaffolding and curing etc., cpomplete with a compresive streangth not lessthan 50 kg/sqm for walls for Superstructure Walls.

35.2

-

232473.82

... More
Construction of Compound wall;Providing plstering with inCm(1:5) mix of 12mm thick including cost and conveyance of all materials, seigniourage,sales tax labour charge and all operational & incidental charges etc., complete as per ss for finished item of work and as directed by the Engineer-in-charge.

255

-

85789.65

... More
Construction of Compound wall;Supply & application of one coat water based cement primer of exterior grade II and two coats of acrylic exterior emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams/litre for exterior walls including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work in all floors.

340

-

85666.4

... More
Construction of Compound wall;Manufacture,supply,delivery of MS grill gates,window ornamental safety grill ,made with MS flats,MS angles,MS squares etc including welding,finishing,applying red oxide paint as primary coat etc complete unit 1.00 kgs

120

-

12217.2

... More
Construction of Compound wall;Painting with Synthetic Enamel paints - One Coat - for Old Iron Work

22.05

-

2083.95

... More
Construction of Compound wall;Manufacture,supply,Fixing of Galvanized steel including cost and Fabrication charges completed as per dwaings and technical specification work including cost of welding roads power charges and fixing in poistion etc.

400

-

46248

... More
Construction of Compound wall;Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade as per drawings and Technical specification clause 1701 MORD/ 801 MORTH

2

-

6000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.