Municipality Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Municipality Tender
Civil And Construction
Opening Date14 Mar 2022
Closing Date22 Mar 2022
Tender Amount₹ 11,12,439 This is an estimated amount, exact amount may vary.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
486439Bid Award Id
ViewTender No
e-Proc.Short NIT No.669/23/E/TO/2021-22, Dt.09-03-2022, S.No.17Tender Authority
Municipality ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
CC Drains and Culverts;Collection, supply & spreading of crusher dust including stacking for pre measuerments at site of work and consolidation with hand roller or any device other than power rolling, cost of materials, labour charges for loading, unloading & stacking, watering, tamping etc., complete as per SS and as directed by the Engineer-in-charge
7.94
-
6075.69
CC Drains and Culverts;For Bed Concrete -Vibrated Plain Cement Concrete in (1:3:6) prop. Using graded HBG metal including cost and conveynace of materials to site inclding seignorage fee machine mixing concrete laying tamping,vibrating,wtaering curing and all labour charge hire and oprational charges of mechinery water lead chagres and including bailing of water etc.,complete for finished item of work
11.04
-
52986.15
CC Drains and Culverts;For Side Walls-Vibrated Plain Cement Concrete in (1:3:6) prop. Using graded HBG metal including cost and conveynace of materials to site inclding seignorage fee machine mixing concrete laying tamping,vibrating,wtaering curing and all labour charge hire and oprational charges of mechinery water lead chagres and including bailing of water etc.,complete for finished item of work
20.29
-
109198.75
CC Drains and Culverts;Plastering with cement mortar (1:3), 12 mm thick on Rcc work aas per technical specification Section 1300 & 2200 MORTH including cost and conveyance of all materials and labor charges for mixing cement mortor, laying, finshing the surface true to alignment and curing as per SS and as directed by the departmental officer incharge of the work
186.9
-
63719.82
CC Drains and Culverts;Earthwork in excavation for Drains foundations and pipe trenches surface as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH
179.5
-
42778.44
CC Drains and Culverts;Carting away the surplus excavated earth from the work site with a lead of 1.0 KM beyond initial lead including loading, unloading and conveyance and spreading the same in low laying areas etc., complete to relevant standard specifications and as directed by the officer-in-charge of the work
179.5
-
6049.15
CC Drains and Culverts;Collection, supply & spreading of crusher dust including stacking for pre measuerments at site of work and consolidation with hand roller or any device other than power rolling, cost of materials, labour charges for loading, unloading & stacking, watering, tamping etc., complete as per SS and as directed by the Engineer-in-charge
30.55
-
23376.86
CC Drains and Culverts;For Bed Concrete -Vibrated Plain Cement Concrete in (1:3:6) prop. Using graded HBG metal including cost and conveynace of materials to site inclding seignorage fee machine mixing concrete laying tamping,vibrating,wtaering curing and all labour charge hire and oprational charges of mechinery water lead chagres and including bailing of water etc.,complete for finished item of work
22.84
-
109619.89
CC Drains and Culverts;For Side Walls-Vibrated Plain Cement Concrete in (1:3:6) prop. Using graded HBG metal including cost and conveynace of materials to site inclding seignorage fee machine mixing concrete laying tamping,vibrating,wtaering curing and all labour charge hire and oprational charges of mechinery water lead chagres and including bailing of water etc.,complete for finished item of work
71.58
-
385236.4
CC Drains and Culverts;Plastering with cement mortar (1:3), 12 mm thick on Rcc work aas per technical specification Section 1300 & 2200 MORTH including cost and conveyance of all materials and labor charges for mixing cement mortor, laying, finshing the surface true to alignment and curing as per SS and as directed by the departmental officer incharge of the work
415.6
-
141690.51
CC Drains and Culverts;Vibrated reinforced cement concrete (R.C.C. grade M 30 Design Mix) using 20 mm Graded Metal (MORTH 12.8 G)using 20 mm graded HBG metal including cost and conveyance of all materials land labour charges for centering, machine mixing, laying, vibrating and curing etc. including all other incidental charges of all T&P etc. for finished item of work as per MoRTH apecifications 1500, 1700, 2100 and 2702 and as directed by the depermental engineers in charge. RBR-FNDN-4-C-(i
7.02
-
39053.24
CC Drains and Culverts;Supply and delivery of Steel Reinforcement H.Y.S.D.confirming to I.S.S. including cost & conveyance of all materials , cost of binding wire and its fabrication charges, placing in position tying grills etc., complete as per relevant standard specifications and as directed by the engineer-in-charge of the work
561.6
-
45354.82
CC Drains and Culverts;Providing concrete for plain concrete M 20 grade in open foundations using 20 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc. RBR-FNDN-4
4.8
-
23662.75
CC Drains and Culverts;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.
7.8
-
46495.41
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements