Municipality Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Municipality Tender
Opening Date29 Aug 2020
Closing Date14 Sep 2020
Tender Amount₹ 24,55,099 This is an estimated amount, exact amount may vary.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
348392Bid Award Id
ViewTender No
943/2015/E1Tender Authority
Municipality ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Construction of Two Additional Class Rooms G1, Raising of Compound Wall, New Toilets at Patel Munici;Supply and placing of the design mix concrete corresponding to IS -456 using WEIGH BATCHER/MIXER using 20 mm size graded machine crushed hard granite metal (coarse agggregate) from approved quarry including cost and conveyance of all materials like cement,fine aggregate(sand),coarse aggregate ,water etc to site and including seigniorage charges ,sales and other taxes on all materials including all operational ,incidental and labour charges such as weigh batching ,machine mixing ,laying concrete ,curing etc complete but excluding cost of steel and its fabrication charges for finished item of work (APSS NO 402) with minimum cement content as per IS Code from standard suppliers approved by the deparment including pumping , centering,shuttering,laying concrete ,vibrating,curing etc M30 design mix unit 1.00cum Column Footings
23
-
199971
... More
Construction of Two Additional Class Rooms G1, Raising of Compound Wall, New Toilets at Patel Munici;Supply and placing of the design mix concrete corresponding to IS -456 using WEIGH BATCHER/MIXER using 20 mm size graded machine crushed hard granite metal (coarse agggregate) from approved quarry including cost and conveyance of all materials like cement,fine aggregate(sand),coarse aggregate ,water etc to site and including seigniorage charges ,sales and other taxes on all materials including all operational ,incidental and labour charges such as weigh batching ,machine mixing ,laying concrete ,curing etc complete but excluding cost of steel and its fabrication charges for finished item of work (APSS NO 402) with minimum cement content as per IS Code from standard suppliers approved by the deparment including pumping , centering,shuttering,laying concrete ,vibrating,curing etc M30 design mix unit 1.00cum Columns Pedestas up to Plinth Beam bottom
2
-
18327
... More
Construction of Two Additional Class Rooms G1, Raising of Compound Wall, New Toilets at Patel Munici;Supply and placing of the design mix concrete corresponding to IS -456 using WEIGH BATCHER/MIXER using 20 mm size graded machine crushed hard granite metal (coarse agggregate) from approved quarry including cost and conveyance of all materials like cement,fine aggregate(sand),coarse aggregate ,water etc to site and including seigniorage charges ,sales and other taxes on all materials including all operational ,incidental and labour charges such as weigh batching ,machine mixing ,laying concrete ,curing etc complete but excluding cost of steel and its fabrication charges for finished item of work (APSS NO 402) with minimum cement content as per IS Code from standard suppliers approved by the deparment including pumping , centering,shuttering,laying concrete ,vibrating,curing etc M30 design mix unit 1.00cum Plinth Beam
4
-
43830
... More
Construction of Two Additional Class Rooms G1, Raising of Compound Wall, New Toilets at Patel Munici;Supply and placing of the design mix concrete corresponding to IS -456 using WEIGH BATCHER/MIXER using 20 mm size graded machine crushed hard granite metal (coarse agggregate) from approved quarry including cost and conveyance of all materials like cement,fine aggregate(sand),coarse aggregate ,water etc to site and including seigniorage charges ,sales and other taxes on all materials including all operational ,incidental and labour charges such as weigh batching ,machine mixing ,laying concrete ,curing etc complete but excluding cost of steel and its fabrication charges for finished item of work (APSS NO 402) with minimum cement content as per IS Code from standard suppliers approved by the deparment including pumping , centering,shuttering,laying concrete ,vibrating,curing etc M30 design mix unit 1.00cum Columns Up to Slab Bottom
3
-
31318
... More
Construction of Two Additional Class Rooms G1, Raising of Compound Wall, New Toilets at Patel Munici;Supply and placing of the design mix concrete corresponding to IS -456 using WEIGH BATCHER/MIXER using 20 mm size graded machine crushed hard granite metal (coarse agggregate) from approved quarry including cost and conveyance of all materials like cement,fine aggregate(sand),coarse aggregate ,water etc to site and including seigniorage charges ,sales and other taxes on all materials including all operational ,incidental and labour charges such as weigh batching ,machine mixing ,laying concrete ,curing etc complete but excluding cost of steel and its fabrication charges for finished item of work (APSS NO 402) with minimum cement content as per IS Code from standard suppliers approved by the deparment including pumping , centering,shuttering,laying concrete ,vibrating,curing etc M30 design mix unit 1.00cum Lintels &Sunshades
1
-
10492
... More
Construction of Two Additional Class Rooms G1, Raising of Compound Wall, New Toilets at Patel Munici;Supply and placing of the design mix concrete corresponding to IS -456 using WEIGH BATCHER/MIXER using 20 mm size graded machine crushed hard granite metal (coarse agggregate) from approved quarry including cost and conveyance of all materials like cement,fine aggregate(sand),coarse aggregate ,water etc to site and including seigniorage charges ,sales and other taxes on all materials including all operational ,incidental and labour charges such as weigh batching ,machine mixing ,laying concrete ,curing etc complete but excluding cost of steel and its fabrication charges for finished item of work (APSS NO 402) with minimum cement content as per IS Code from standard suppliers approved by the deparment including pumping , centering,shuttering,laying concrete ,vibrating,curing etc M30 design mix unit 1.00cum Sunshades
1
-
12536
... More
Construction of Two Additional Class Rooms G1, Raising of Compound Wall, New Toilets at Patel Munici;Supply and placing of the design mix concrete corresponding to IS -456 using WEIGH BATCHER/MIXER using 20 mm size graded machine crushed hard granite metal (coarse agggregate) from approved quarry including cost and conveyance of all materials like cement,fine aggregate(sand),coarse aggregate ,water etc to site and including seigniorage charges ,sales and other taxes on all materials including all operational ,incidental and labour charges such as weigh batching ,machine mixing ,laying concrete ,curing etc complete but excluding cost of steel and its fabrication charges for finished item of work (APSS NO 402) with minimum cement content as per IS Code from standard suppliers approved by the deparment including pumping , centering,shuttering,laying concrete ,vibrating,curing etc M30 design mix unit 1.00cum Roof Beams
5
-
47342
... More
Construction of Two Additional Class Rooms G1, Raising of Compound Wall, New Toilets at Patel Munici;Supply and placing of the design mix concrete corresponding to IS -456 using WEIGH BATCHER/MIXER using 20 mm size graded machine crushed hard granite metal (coarse agggregate) from approved quarry including cost and conveyance of all materials like cement,fine aggregate(sand),coarse aggregate ,water etc to site and including seigniorage charges ,sales and other taxes on all materials including all operational ,incidental and labour charges such as weigh batching ,machine mixing ,laying concrete ,curing etc complete but excluding cost of steel and its fabrication charges for finished item of work (APSS NO 402) with minimum cement content as per IS Code from standard suppliers approved by the deparment including pumping , centering,shuttering,laying concrete ,vibrating,curing etc M30 design mix unit 1.00cum Roof Slab 125 mm thick
68
-
78511
... More
Construction of Two Additional Class Rooms G1, Raising of Compound Wall, New Toilets at Patel Munici;Supply and placing of the design mix concrete corresponding to IS -456 using WEIGH BATCHER/MIXER using 20 mm size graded machine crushed hard granite metal (coarse agggregate) from approved quarry including cost and conveyance of all materials like cement,fine aggregate(sand),coarse aggregate ,water etc to site and including seigniorage charges ,sales and other taxes on all materials including all operational ,incidental and labour charges such as weigh batching ,machine mixing ,laying concrete ,curing etc complete but excluding cost of steel and its fabrication charges for finished item of work (APSS NO 402) with minimum cement content as per IS Code from standard suppliers approved by the deparment including pumping , centering,shuttering,laying concrete ,vibrating,curing etc M30 design mix unit 1.00cum Stair case waist slabs 200 mm thick
14
-
22684
... More
Construction of Two Additional Class Rooms G1, Raising of Compound Wall, New Toilets at Patel Munici;Supply and placing of the design mix concrete corresponding to IS -456 using WEIGH BATCHER/MIXER using 20 mm size graded machine crushed hard granite metal (coarse agggregate) from approved quarry including cost and conveyance of all materials like cement,fine aggregate(sand),coarse aggregate ,water etc to site and including seigniorage charges ,sales and other taxes on all materials including all operational ,incidental and labour charges such as weigh batching ,machine mixing ,laying concrete ,curing etc complete but excluding cost of steel and its fabrication charges for finished item of work (APSS NO 402) with minimum cement content as per IS Code from standard suppliers approved by the deparment including pumping , centering,shuttering,laying concrete ,vibrating,curing etc M30 design mix unit 1.00cum For First Floor Columns Up to Slab Bottom
2
-
21381
... More
Construction of Two Additional Class Rooms G1, Raising of Compound Wall, New Toilets at Patel Munici;Supply and placing of the design mix concrete corresponding to IS -456 using WEIGH BATCHER/MIXER using 20 mm size graded machine crushed hard granite metal (coarse agggregate) from approved quarry including cost and conveyance of all materials like cement,fine aggregate(sand),coarse aggregate ,water etc to site and including seigniorage charges ,sales and other taxes on all materials including all operational ,incidental and labour charges such as weigh batching ,machine mixing ,laying concrete ,curing etc complete but excluding cost of steel and its fabrication charges for finished item of work (APSS NO 402) with minimum cement content as per IS Code from standard suppliers approved by the deparment including pumping , centering,shuttering,laying concrete ,vibrating,curing etc M30 design mix unit 1.00cum For First Floor Lintels &Sunshades
1
-
10743
... More
Construction of Two Additional Class Rooms G1, Raising of Compound Wall, New Toilets at Patel Munici;Supply and placing of the design mix concrete corresponding to IS -456 using WEIGH BATCHER/MIXER using 20 mm size graded machine crushed hard granite metal (coarse agggregate) from approved quarry including cost and conveyance of all materials like cement,fine aggregate(sand),coarse aggregate ,water etc to site and including seigniorage charges ,sales and other taxes on all materials including all operational ,incidental and labour charges such as weigh batching ,machine mixing ,laying concrete ,curing etc complete but excluding cost of steel and its fabrication charges for finished item of work (APSS NO 402) with minimum cement content as per IS Code from standard suppliers approved by the deparment including pumping , centering,shuttering,laying concrete ,vibrating,curing etc M30 design mix unit 1.00cum For First Floor Sunshades
1
-
12898
... More
Construction of Two Additional Class Rooms G1, Raising of Compound Wall, New Toilets at Patel Munici;Supply and placing of the design mix concrete corresponding to IS -456 using WEIGH BATCHER/MIXER using 20 mm size graded machine crushed hard granite metal (coarse agggregate) from approved quarry including cost and conveyance of all materials like cement,fine aggregate(sand),coarse aggregate ,water etc to site and including seigniorage charges ,sales and other taxes on all materials including all operational ,incidental and labour charges such as weigh batching ,machine mixing ,laying concrete ,curing etc complete but excluding cost of steel and its fabrication charges for finished item of work (APSS NO 402) with minimum cement content as per IS Code from standard suppliers approved by the deparment including pumping , centering,shuttering,laying concrete ,vibrating,curing etc M30 design mix unit 1.00cum For First Floor Roof Beams
5
-
48035
... More
Construction of Two Additional Class Rooms G1, Raising of Compound Wall, New Toilets at Patel Munici;Supply and placing of the design mix concrete corresponding to IS -456 using WEIGH BATCHER/MIXER using 20 mm size graded machine crushed hard granite metal (coarse agggregate) from approved quarry including cost and conveyance of all materials like cement,fine aggregate(sand),coarse aggregate ,water etc to site and including seigniorage charges ,sales and other taxes on all materials including all operational ,incidental and labour charges such as weigh batching ,machine mixing ,laying concrete ,curing etc complete but excluding cost of steel and its fabrication charges for finished item of work (APSS NO 402) with minimum cement content as per IS Code from standard suppliers approved by the deparment including pumping , centering,shuttering,laying concrete ,vibrating,curing etc M30 design mix unit 1.00cum For First Floor Roof Slab 125 mm thick
79
-
118205
... More
Construction of Two Additional Class Rooms G1, Raising of Compound Wall, New Toilets at Patel Munici;Supply and placing of the design mix concrete corresponding to IS -456 using WEIGH BATCHER/MIXER using 20 mm size graded machine crushed hard granite metal (coarse agggregate) from approved quarry including cost and conveyance of all materials like cement,fine aggregate(sand),coarse aggregate ,water etc to site and including seigniorage charges ,sales and other taxes on all materials including all operational ,incidental and labour charges such as weigh batching ,machine mixing ,laying concrete ,curing etc complete but excluding cost of steel and its fabrication charges for finished item of work (APSS NO 402) with minimum cement content as per IS Code from standard suppliers approved by the deparment including pumping , centering,shuttering,laying concrete ,vibrating,curing etc M30 design mix unit 1.00cum For First Floor Stair case waist slabs 200 mm thick
14
-
31374
... More
Construction of Two Additional Class Rooms G1, Raising of Compound Wall, New Toilets at Patel Munici;Brick masonary in CM (1:5) with traditional size 23x11x7cm unit 1.00 cum Ground Floor
14
-
77754
... More
Construction of Two Additional Class Rooms G1, Raising of Compound Wall, New Toilets at Patel Munici;Brick masonary in CM (1:5) with traditional size 23x11x7cm unit 1.00 cum For First Floor
16
-
97170
... More
Construction of Two Additional Class Rooms G1, Raising of Compound Wall, New Toilets at Patel Munici;Plastering with CM (1:3) 12mm thick GF to ceiling unit 10.00 sqm for Ceiling Ground Floor( For Rooms )
80
-
24387
... More
Construction of Two Additional Class Rooms G1, Raising of Compound Wall, New Toilets at Patel Munici;Plastering with CM (1:3) 12mm thick GF to ceiling unit 10.00 sqm For First Floor
104
-
37145
... More
Construction of Two Additional Class Rooms G1, Raising of Compound Wall, New Toilets at Patel Munici;Plastering with CM (1:4) 12mm thick GF unit 10.00 sqm BLD-CSTN-6-2 For Ground Floor
306
-
90371
... More
Construction of Two Additional Class Rooms G1, Raising of Compound Wall, New Toilets at Patel Munici;Plastering with CM (1:4) 12mm thick GF unit 10.00 sqm BLD-CSTN-6-2 For First Floor
371
-
129405
... More
Construction of Two Additional Class Rooms G1, Raising of Compound Wall, New Toilets at Patel Munici;Plastering with CM (1:4) 20mm thick GF unit 10.00 sqm BLD-CSTN-6-2 For Ground Floor
127
-
39614
... More
Construction of Two Additional Class Rooms G1, Raising of Compound Wall, New Toilets at Patel Munici;Plastering with CM (1:4) 20mm thick GF unit 10.00 sqm BLD-CSTN-6-2 For First Floor
139
-
50513
... More
Construction of Two Additional Class Rooms G1, Raising of Compound Wall, New Toilets at Patel Munici;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars ( Fe 500 D grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126) unit 1.00 MT GF Ground Floor
4837
-
284029
... More
Construction of Two Additional Class Rooms G1, Raising of Compound Wall, New Toilets at Patel Munici;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars ( Fe 500 D grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126) unit 1.00 MT GF First Floor
2566
-
153062
... More
Construction of Two Additional Class Rooms G1, Raising of Compound Wall, New Toilets at Patel Munici;Supply and fixing of doors as per approved drawings with medium teak wood frame of section 100mm x 65 mm with split type fan light of 500mm at the top fixed with 4mm thick pin headed glass using 12mm x 12mm Teak Wood beading and 2 Nos. of 10mm MS Square bars and ISI marked flush door shutter of 30mm thick double shutters with bond wood solid block board type core having cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on all sides, including cost and conveyance to site of teak wood frame, flush shutter including supply and fixing 6 Nos. MS Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked Alumimium fixtures of 6 Nos. butt hinges (IS:205) 150mm long, 1 No. aldrop (IS:2681) 300mm long, 2 Nos. tower bolts (IS:204) of 200 mm x 10 mm dia at top, 2 Nos. 150mm long handles (IS:208), 2 Nos. door stoppers and 2 Nos. Rubber / Nylon door stop bushes including fixing the fixtures to door with required number of screws, bolt and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame, fixing glass in fan light portion etc., including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in flooring for a depth of not less than 10 mm) (1500mm x 2600mm) Main Doors Ground Floor
8
-
160706
... More
Construction of Two Additional Class Rooms G1, Raising of Compound Wall, New Toilets at Patel Munici;Providing and fixing factory made uPVC white colour sliding glazed windowupto 1.50 m in height dimension comprising of uPVC multi-chamberedframe with in-built roller track and sash extruded profiles duly reinforcedwith 1.60 ± 0.2 mm thick galvanized mild steel section made from rollforming process of required length (shape & size according to uPVCprofile), appropriate dimension of uPVC extruded glazing beads anduPVC extruded interlocks, EPDM gasket, wool pile, zinc alloy (whitepowder coated) touch locks with hook, zinc alloy body with single nylonrollers (weight bearing capacity to be 40 kg), G.I fasteners 100 x 8 mmsize for fixing frame to finished wall and necessary stainless steel screwsetc. Profile of frame & sash shall be mitred cut and fusion welded at allcorners, including drilling of holes for fixing hardware's and drainage ofwater etc. After fixing frame the gap between frame and adjacent finishedwall shall be filled with weather proof silicon sealent over backer rod ofrequired size and of approved quality, all complete as per approved drawing& direction of Engineer-in-Charge inclusive of cost of Single / double glass panes, wire mesh and silicon sealent . Note: For uPVC frame and sash extruded profiles minus 5% tolerancein dimension i.e. in depth & width of profile shall be acceptable.Variation in profile dimension in higher side shall be accepted. But no extra payment on this account shall be made.Two track two panels sliding window made of (big series) frame 67 x 50 mm & sash 46 x 62 mm both having wall thickness of 2.3 ± 0.2 mm and single glazing bead / double glazing bead of appropriate dimension . (Area of window above 1.75 sqmupto 2.50 sqm). BMT-P.80.C Two track two panels sliding window made of (big series) frame 67 x 50 mm & sash 46 x 62 mm both having wall thickness of 2.3 ± 0.2 mm and single glazing bead / double glazing bead of appropriate dimension . (Area of window above 1.75 sqmupto 2.50 sqm). 1 (BMT-P.80.C)
22
-
165594
... More
Construction of Two Additional Class Rooms G1, Raising of Compound Wall, New Toilets at Patel Munici;Providing and fixing of top hung Ventilators made of prepainted steel (Base steel as per IS 513 of 0.80 mm thick galvanized as per IS 277 with Zinc of 120 GSM), finish painted with a polyester paint of 60-65 microns thick and section for outer frame of 80 x 45 mm, centre mullion of 80 x 60 mm, section for shutter of 52 x 25 mm x 0.6 mm thick, outer frame and mullions to have rebate for glazed shutter with a provision for guard bars/grills and the sections cut to length metre joined with corner bracket, centre mullion fixed with mullion cap, 1 No. of High grade nylon latch handle, window stopper, 2 nos. of with MS Powder coated /SS ball bearing butt Hinges provided per shutter and windows fitted with 4 mm thick plain float glass with rubber gaskets including fixing the frames in concrete/masonry wall by means of self expanding screws, Including 10 mm Square guard bars with 6? (152.4mm) pitch etc., complete for finished item of work.Double fixed Louvers ventilator Size of 4? 0? x 2? 0? (1219.2mm x 609.6mm) outer frame box section size of 80 x 45mm, vertical mullion section size of 80 x 60 mm BMT-P.60Double fixed Louvers ventilator Size of 4? 0? x 2? 0? (1219.2mm x 609.6mm) outer frame box section size of 80 x 45mm, vertical mullion section size of 80 x 60 mm 1 (BMT-P.60 )
4
-
17256
... More
Construction of Two Additional Class Rooms G1, Raising of Compound Wall, New Toilets at Patel Munici;Providing Impervious coat to exposed RCC Roof Slab surface with C.M.(1:3) 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, seigniorage charges, excluding conveyance charges of materials and including charges all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junction of wall and slab etc, complete for finished item of work as per S.S. For Slab Area
79
-
34148
... More
Construction of Two Additional Class Rooms G1, Raising of Compound Wall, New Toilets at Patel Munici;Painting to new walls with 2 coats of plastic emulsion paint of approved brand and shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials, inlcuding cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., complete for finished item of work as per SS 911 for internal walls For Ground Floor
306
-
48281
... More
Construction of Two Additional Class Rooms G1, Raising of Compound Wall, New Toilets at Patel Munici;Painting to new walls with 2 coats of plastic emulsion paint of approved brand and shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials, inlcuding cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., complete for finished item of work as per SS 911 for internal walls For First Floor
371
-
58536
... More
Construction of Two Additional Class Rooms G1, Raising of Compound Wall, New Toilets at Patel Munici;Bailing out water from the pipe line trenches with Electric Driven pump set including hire charges, current charges and wages for Driver and Helper up to 5HP capacity pumps.
300
-
15912
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements