To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Municipality Tender
Civil And Construction
Drainage Work
Opening Date12 Jul 2024
Closing Date26 Jul 2024
Tender Amount₹ 1,69,823
Costs
EMD
₹ 1,698Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
742877Tender No
MGF BOQ 967Tender Authority
Municipality ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Collection, supply, spreading of crusher stone dust and rolling with hand roller, watering, consolidated charges, all labour charges, spreading charges etc., complete as per SS and as Directed by Departmental officer incharge of the work for road base. RBR - FNDN - 2 / i
5.2
2828
544.01
... More
Vibrated plain cement concrete (1:3:6) M10 using 40 mm HBG metal including cost and conveyance of all materials land labour charges for centering, machine mixing, laying, vibrating and curing etc. including all other incidental charges of all T&P etc. for finished item of work as per MoRTH apecifications 1500, 1700, 2100 and 2702 and as directed by the depermental engineers in charge. RBR-FNDN-4-I-i for drain bed (WITH OUT FORM WORK)
5.2
23949
4605.67
... More
Vibrated Plain Cement Concrete M20 grade (1:2:4) nominal mix for plain concrete in open foundations using 20 mm nominal size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. RBR-FNDN-4-A-V-(i) For Side Walls (with form work)
14.37
81935
5701.87
... More
Vibrated Plain Cement Concrete M20 grade (1:2:4) nominal mix for plain concrete in open foundations using 20 mm nominal size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. RBR-FNDN-4-A-V-(i) For Quenet (without form work)
0.75
4116
5489.07
... More
Vibrated plain cement concrete M 30 using 20 mm graded HBG metal including cost and conveyance of all materials land labour charges for centering, machine mixing, laying, vibrating and curing etc. including all other incidental charges of all T&P etc. for finished item of work as per MoRTH apecifications 1500, 1700, 2100 and 2702 and as directed by the depermental engineers in charge. RBR - FNDN 4 / f for approaches
5
30450
6090.02
... More
Vibrated reinforced cement concrete M 30 Design mix using 20mm graded HBG metal including cost and conveyance of all materials land labour charges for centering, machine mixing, laying, vibrating and curing etc. including all other incidental charges of all T&P etc. for finished item of work as per MoRTH apecifications 1500, 1700, 2100 and 2702 and as directed by the depermental engineers in charge. RBR-FNDN 4/ g for Cover Slabs
0.68
3999
5881.73
... More
Supplying, fitting and placing Fe 500/Fe-500D HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded - BLD - CSTN - 2/18.
81.6
7459
91.42