To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Municipality Tender

Opening Date23 Nov 2020
Closing Date8 Dec 2020
Tender Amount₹ 7,46,526 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
TOTAL WORK;Plain Cement concrete (1:4:8) with concrete mixture nominal mix for plain concrete in open foundations using 40 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.

14

-

54912.9

... More
TOTAL WORK;Vibrated plain cement concrete (1:3:6) M10 using 40 mm HBG metal including cost and conveyance of all materials land labour charges for centering, machine mixing, laying, vibrating and curing etc. including all other incidental charges of all T&P etc. for finished item of work as per MoRTH apecifications 1500, 1700, 2100 and 2702 and as directed by the depermental engineers in charge. RBR-FNDN-4-I-i for drain bed (WITH OUT FORM WORK) ) BED- 600MM & 750MM DRAIN & CULVERT

30.01

-

121177.08

... More
TOTAL WORK;Providing Vibrated plain concrete of M20 grade with 1:2:4 nominal mix using 40 mm graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH and as directed by the departmental engineers in charge of the work.This rate is including cost and conveyance of all materials,land,labour charges,centering charges etc.RBR-FNDN-V-I SIDE WALLS (WITH FORM WORK) SIDE WALLS-600MM & 750MM CC DRAIN & CULVERT

98.85

-

472035.44

... More
TOTAL WORK;Vibrated Plain Cement Concrete M20 grade (1:2:4) nominal mix for plain concrete in open foundations using 20 mm nominal size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. RBR-FNDN-4-A-V-(i) FOR QUENET QUENET-600MM VENT DRAIN & CULVERT

8.73

-

41617.66

... More
TOTAL WORK;Vibrated reinforced cement concrete M 30 using 20 mm graded HBG metal including cost and conveyance of all materials land labour charges for centering, machine mixing, laying, vibrating and curing etc. including all other incidental charges of all T&P etc. for finished item of work as per MoRTH apecifications 1500, 1700, 2100 and 2702 and as directed by the depermental engineers in charge. RBR - FNDN 4 / g for COVER SLABS

1.57

-

8323.79

... More
TOTAL WORK;Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded - BLD - CSTN - 2 / 19.

188.4

-

12230.93

... More
TOTAL WORK;Carting away of excavated earth/ debris to a lead of 3 Km. The rate including Loading,Unloading charges by manual means including idle Hire chrages of trucks.

227.02

-

14649.6



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.