Municipality Tender
... More
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Municipality Tender
Civil And Construction
Drainage Work
Opening Date21 Jan 2025
Closing Date5 Feb 2025
Tender Amount₹ 3,41,388
Costs
EMD
₹ 3,414Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
780333Tender No
176/2024-25/E1-RMPTender Authority
Municipality ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Earthwork in excavation for road as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and base filling in trenches with excavated suitable material as per Tech. Specification 305 MORD, 304 MORTH. This rate including cost of all labour charges and other incidental charges etc., complete as per SS and as directed by the departmental officer incharge of work. RBR - EECD - 5 / i (Manual Means)
52.8
289
15279.26
... More
Collection, supply, spreading of crusher stone dust and rolling with hand roller, watering, consolidated charges, all labour charges, spreading charges etc., complete as per SS and as Directed by Departmental officer incharge of the work for road base. BLD - CSTN-2-8
8.2
824
6762.46
... More
Vibrated Plain Cement Concrete M20 grade (1:2:4) nominal mix for plain concrete in open foundations using 20 mm graded size hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. RBR-FNDN-4-A-V-(i) (BED WITH OUT FORM WORK)
8.2
5549
45509.84
... More
Vibrated Plain Cement Concrete M20 grade (1:2:4) nominal mix for plain concrete in open foundations using 20 mm graded size hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. RBR-FNDN-4-A-V-(i) SIDE WALLS-WITH FORM WORK
20.27
5764
116852.23
... More
Vibrated Plain Cement Concrete M20 grade (1:2:4) nominal mix for plain concrete in open foundations using 20 mm graded size hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. RBR-FNDN-4-A-V-(i) QUENET-WITH OUT FORM WORK
1.3
5549
7214.97
... More
Vibrated reinforced cement concrete M 30 using 20 mm graded HBG metal including cost and conveyance of all materials land labour charges for centering, machine mixing, laying, vibrating and curing etc. including all other incidental charges of all T&P etc. for finished item of work as per MoRTH apecifications 1500, 1700, 2100 and 2702 and as directed by the depermental engineers in charge. RBR - FNDN 4 / g for COVER SLABS
2.4
6120
14688.1
... More
Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded - BLD - CSTN - 2 / 19.
288
90
25957.44
... More
Vibrated P.C.C. grade M 30 (Design Mix) MORTH 12.8 B using 20 mm graded stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. and as directed by the depermental engineers in charge. RBR-FNDN-4G-F-i-Road Approaches
1.98
6110
12098.02
... More
Carting away of excavated earth/ debris to a lead of 3 Km. The rate including Loading,Unloading charges by manual means including idle Hire chrages of trucks.
52.8
80
4255.15
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements