Municipality Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Municipality Tender
Civil And Construction
Opening Date27 Jul 2022
Closing Date11 Aug 2022
Tender Amount₹ 5,82,709
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
530887Tender No
9-8/15th F.C.Un-Tied Grant/2020-21/2nd Installment/E1,dt.26.07.2022Tender Authority
Municipality ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Construction of C.C. Drain and Culvert;Supply and filling with Sand complying with standard specifications including cost and conveyance of sand to site to work labour charges watering tamping, ramming etc complete and as directed by the Engineer-in-Charge of the work.
18
-
20561
... More
Construction of C.C. Drain and Culvert;Laying Cement concrete (1:4:8) using 40mm nominal size HBG metal M/C including cost and conveyance of all materials from approved quarry, machine mixing, vibrating, laying, levelling, ramming, curing and labour charges etc., complete and as directed by the Engineer-in-Charge of the work
18
-
73429
... More
Construction of C.C. Drain and Culvert;Providing concrete for plain/reinforced concrete in open foundatins using 20 mm nominal size Graded hard stone aggregate, mechanically, mixed placed in foundation and compacted by vibration including curing for 14 days complete as per drawing and technical specifications clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH (PCC Grade M-10, Nominal mix 1:3:6) etc., complete and as directed by the Engineer-in-Charge of the work
53
-
248754
... More
Construction of C.C. Drain and Culvert;Plastering with CM (1:3), 12 mm thick including cost and conveyance of all materials and water to work site and all operational incidental, labour charges such as scaffolding, mixing mortar lift charges curing etc., etc., complete for finished item of work and as directed by the Engineer-in-Charge of the work
348
-
122834
... More
Construction of C.C. Drain and Culvert;RCC M-20 Desigin mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20 mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand )coarseaggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational,incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cos of steel and its fabrication charges for finished item of work, including centering, shuttering.etc., complete and as directed by the Engineer-in-Charge of the work
4.14
-
26749
... More
Construction of C.C. Drain and Culvert;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) bars (Fe 415 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work.
497
-
43989
... More
Construction of C.C. Drain and Culvert;Providing concrete for plain/reinforced concrete in open foundations using PCC grace M 20 nominal size Graded (1:2:4) ( Mechanical mixer) stone aggregate, mechanically, mixed placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specification clause 802,803,1202 & n1203 MORD and 1500,1700&2100 MORTH
2
-
9930
... More
Construction of C.C. Drain and Culvert;Gravel Filling as per specification and drawing including cost and conveyance of materials to site with all leads, lifts including watering, tamping,ramming, labour charges, all other incidental and operational charges etc,. complete as per detailed specification and directed by the Engineer-in-Charge.
54
-
20367
Evaluation Notes How It Works ?