Municipal Corporation Tender
... More
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Municipal Corporation Tender
Civil And Construction
Road Construction
Opening Date28 Mar 2025
Closing Soon11 Apr 2025
Tender Amount₹ 5,97,407
Costs
EMD
₹ 5,974Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
793737Tender No
ET NO.75/2024-25, Item No.13Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://http://www.gunturcorporation.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing concrete for plain/reinforced concrete (M10) in open foundations using 40 mm hard stone aggregate , mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.
36.6
4448
162832
... More
Flooring with chequrred terrazzo tiles of 20 mm thick (medium shade) set over base coat of C.M (1:6) 12 mm thick over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spread @ 3.3.kg/sqm & jointed with neat cement to full depth mixed with pigment of matching shade including cost of all materials like cement, sand water and tiles etc., complete for finished item of work (BLD-CSTN-7-4) - 10 Sq.M.
324
976
316250
... More
Supply and fixing of C.C. Kerb not less than M30 strength of size 600 X 375 X 100 mm thick with bottom thickness of 100 mm upto height of 300 mm and top width of 50 mm thick chamfering with 45° at starts at 300 mm height to 375 mm height as selected by the Engineer-in-charge from approved source/ factory which is laid on existing CC Bed in position to the required line, level and curvature jointed with cement mortar 1:3 (1 cement : 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5 mm), including making drainage opening wherever required and including cost and conveyance of all materials & labour charges including transportation from approved source, loading & unloading charges including contractor profit & overhead charges complete for finished item of work.
48
797
38258
... More
Providing concrete for plain/reinforced concrete (M20) in open foundations using 20 mm Graded hard stone aggregate , mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.
1.6
5402
8644
... More
Enagaging of Labour for removing Existing Tiles
15
700
10500
... More
Carting away the surplus excavated earth from the work site with a lead of 1 km beyond initial lead including loading, unloading and conveyance but excluding stacking charges etc., complete - 1 Cum.
36.6
107
3950
... More
Provision for Seignorage charges
-
-
13500
... More
Provision for NAC @ 0.10%
-
-
611
... More
Provision for GST @ 18%
-
-
110073
... More
Provision for TPQA @ 0.749 %
-
-
4475
... More
Unforeseen item
-
-
23934
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%