Municipal Corporation Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Municipal Corporation Tender

Works
Civil And Construction
Drainage Work
Pipe Line Project
Opening Date14 Aug 2024
Closing Date28 Aug 2024
Tender Amount₹ 58,42,673 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earthwork excavation in Ordinary soil by Mechanical Means upto 3 m depth for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH (RBR-FNDN-1(B)) - 1 Cum

919.23

117726

128.07

... More
Carting away the surplus excavated earth from the work site with a lead of 3 km beyond initial lead including loading, unloading and conveyance but excluding stacking charges etc., complete-1 Cum.

987.01

142751

144.63

... More
Supply of SWG SP-1 pipe conforming to ISI 651-6" dia (152.4mm) including loading, unloading & stacking at site.

168

55544

330.62

... More
Supply of SWG SP-1 pipe conforming to ISI 651-10" dia (254 mm) including loading, unloading & stacking at site.

289.8

270320

932.78

... More
Lowering laying and jointing of SWG pipe including jointing with CM (1:3) to full deth of joint in ready made line trench etc., Complete as per SS

457.8

148785

325

... More
House service connections (Regulating ferrule) 1/2"

70

11612

165.88

... More
Bush

70

3150

45

... More
Reducer

70

2450

35

... More
Union

70

5600

80

... More
Elbow

70

2800

40

... More
3" Nipple

70

2450

35

... More
4" Nipple

70

3150

45

... More
9" Nipple

70

4900

70

... More
HDPE Pipe OD 20mm dia

70

2068

29.54

... More
Engaging of Plumber/pipe Fitter including all charges etc., complete

140

131250

937.5

... More
Engaging of Labour including all charges etc., complete

140

98000

700

... More
Filling of stone Crusher Dust for foundation trenches including cost and conveyance of all materials and all labour charges ramming, watering etc., as per drawing and technical specification in Clause 305.3.9 MORD & 304 MORTH

503.93

339336

673.38

... More
Providing concrete for plain/reinforced concrete (M10) in open foundations using 20 mm Graded hard stone aggregate , mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.

94.29

459678

4875.15

... More
Providing concrete for plain/reinforced concrete (M10) in open foundations using 20 mm Graded hard stone aggregate , mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.

138.06

737452

5341.53

... More
Brick Masonary in C.M (1:6) using 2nd Class well burnt ground moulded traditional size bricks of locally available having a crushing strength of not less than 35 Kg./Sq.Cm & size of 23x11x7 Cm including cost & conveyance of Material to site, mixing of Cement Mortar & laying of bricks & mortar to specified thickness, watering, curing, including all scaffolding, hire & operational charges of Machinery, all Labour charges & all water lead charges etc. complete for finished item of work. (BLD-CSTN-3-1)

23.04

205099

8901.87

... More
Plastering in C.M (1:3) 12 mm thick including cost and conveyance of all Material, Labour for mixing Material, laying and curing etc., complete - 10 Sq.M. (BLD-CSTN-6.2)

1058.04

429215

405.67

... More
Manufacture as per BIS:12592 (Part 1&2) supply & delivery of manhole covers and frames with ISI marking anywhere in A.P., F.O.R. destination including, loading, unloading & stacking at site but excluding all taxes.

15

36351

2423.41

... More
VRCC M-20 Design mix (Cement: fineaggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shutteing for culvert slabs

5.04

29380

5829.34

... More
Providing High Yield Strength Deformed (HYSD) Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors. ( APSS No.126)

453.6

41777

92.1

... More
Laying of Plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 / 53 grade at cement as per Clause 1501.2.2 M30 (Grade) at 400 kg per cum, coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork, spreading the concrete with shovels, rakes, compacted using needle and plate vibrators and finished in continuous operation including curing of concrete slabs for 28- days and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD. Culverts approaches

10.13

63594

6277.81

... More
Providing, laying, spreading and compacting graded HBG Crushed stone aggregate to Wet mix macadam specification including cost, seigniorage of all material and including premixing the material with water at OMC in mechanical mixer Plant carriage of mixed material by tipper to site, laying in uniform layers with paver in base course on well prepared surface and compacting with Vibratory roller of 8 to 10 to achieve the desired density etc., as directed by the Engineer-in-Charge and as per MORTH & H Specification for finished item of work. (RBR-SBBS-11)

217.5

474178

2180.13

... More
Laying of Plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 / 53 grade at cement as per Clause 1501.2.2 (M30 Grade) at 400 kg per cum, coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.28 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, near approaches to bridge / culvert and construction joints, and curing of concrete slabs for 14- days and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

253.75

1767326

6964.83

... More
Bailing out of water from the pipeline trenches with oil engine driven pumpsets, including hire charges, fuel charges and wages for Driver and Helper.

150

12543

83.62

... More
Provision for Seignorage Charges

-

130000

-

... More
Provision for NAC @ 0.10%

-

5973

-

... More
Provision for GST @ 18%

-

1076156

-

... More
Provision for TPQA @ 0.749 %

-

43762

-

... More
Unforeseen item

-

1436

-

... More
TOTAL

-

7100000

-

... More
Rupees Fifty Eight Lakh(s) Forty Two Thousand Six Hundred Seventy Three Only

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.