Municipal Corporation Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Municipal Corporation Tender
Civil And Construction
Road Construction
Opening Date20 Dec 2024
Closing Date26 Dec 2024
Tender Amount₹ 15,88,852
Costs
EMD
₹ 16,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
775669Tender No
Rc.E6-120111/2024Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://vijayawada.cdma.ap.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Collection and Supply of Dust for filling including Cost and coneyance charges, Spreading, Sectioning etc., complete.
61.5
1186
72999.27
... More
Providing concrete for plan concrete (M10) using 220 kgs cement, 40mm nominal size hard stone aggregate mechanically mixed placed in foundation and compacted by vibration including curing for 14days complete as per drawings and techinical specifications of MORTH
5
4634
23172.2
... More
Providing concrete (M-15) for plain / reinforced concrete in using 20, 10mm nominal size Graded hard stone aggregate, mechanically mixed, and compacted by vibration including curing complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH
-
-
-
... More
With form work
6.25
5961
37260.25
... More
with out form work
0.63
5730
3610.19
... More
Brick work in CM 1:6 using second class brick of (size 230x110x70 MM) for approved kiln including cost and conveyance of all materilals labour charges etc., complete. As directed bye the dept. authorities.
22.08
8252
182204.6
... More
Plastering with CM (1:4) 12mm thick including cost, seignorage and conveyance of all materials and labour charges, mixing of motor watering etc., complete as per SS
304
1422
43252.21
... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD. Unit = cum. including cost and conveyance of all materials and labour charges etc,Complete.
116.85
6812
796062.83
... More
Separation Membrane of impermeable plastic sheeting 125 micron thick
720
13
9813.6
... More
Supply of 25mm thick high performance expansion joint filler board (SILFLEXCAPCELLHD-100 or equivalent make),placing the same 25mm below top of pavement slab sealing with bituminous hot sealing compound (Grade-A-ISI) polysulphudiet 50mm interval in CC.Pavement incl.cost and conveyance of all materials but excl.labour charges for placing in position,for expansion joints confirmig to MORTH Specification 602-1Rmt of joint length
36
167
6033.96
... More
Supply of bituminous hot sealing compound (grade-A ISI ) poly sulphide and sealing the joints incl.cost and conveyance of all materials etc.but excl.labour charges for placing in position for contraction joints at 1.50 interval / for expansion joints/for longitudinal joints as per MORTH specification number 602-1 Rm
202.5
38
7729.43
... More
Supply and placing of the RCC M20 (Design Mix) concrete corresponding to IS 456 using weigh batcher /60% of mixer 20mm size graded machine crushed hard granite metal (coarse aggregate) 40% of 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggrregate (sand) coarse aggregate, water etc., to site and including seigniorage charges, on all labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work For Culvert slab
13.23
6286
83166.69
... More
Providing High Yield Strength Deformed ( HYSD) / Thermo Mechanically Treated (TMT) / Mild Steel (MS) Steel bars of SAIL / VSP / TATA (Fe 415 / Fe 500 grade as per IS 1786-1979) of different diameters for RCC works including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming frills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work as per SS.
1190.7
93
110758.91
... More
Manufacturing, Supply, Delivery and fixing of M.S. Iron Gate , MS Grill using with M.S. Angulars, M.S. flats including cost and conveyance of all materials and labour charges for cutting, welding, grinding and fixing etc., , complete.as directed by the departmental authorities.
615
131
80657.25
... More
Collection and supply of Red earth including excavation, cost and conveyance spreading sectioning consolidation with PR complete etc., complete
76.8
1131
86872.32
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements