To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Municipal Corporation Tender
Civil And Construction
Drainage Work
Opening Date2 Jan 2025
Closing Date20 Jan 2025
Tender Amount₹ 31,85,272
Costs
EMD
₹ 31,853Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
777220Tender No
ET NO.55/2024-25 ITEM NO-8Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://http://www.gunturcorporation.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Filling of Stone Crusher Dust for foundation trenches including cost and conveyance off all materials and all labour charges ramming,watering etc, as per drawing and technical specification in Clause 305.3.9 MORD & 304 MORTH
75
673
50504
... More
Providing concrete for plain/reinforced concrete (M10) in open foundations using 20 mm Graded hard stone aggregate , mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.
75
4875
365636
... More
Providing concrete for plain/reinforced concrete (M10) in open foundations using 20 mm Graded hard stone aggregate , mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.
112.5
5341
600922
... More
Plastering in C.M (1:3) 12 mm thick including cost and conveyance of all Material, Labour for mixing Material, laying and curing etc., complete - 10 Sq.M. (BLD-CSTN-6.2)
825
405
334678
... More
Bailing out water from the pipe line trenches with oil engine driven pump sets, including hire charges, fuel charges and wages for Driver and Helper.
250
83
20905
... More
Excavation for roadway in soil by Mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections as per Technical Specification Clause 302.3 MORD / 301 MORTH.
187.5
52
9806
... More
Construction of granular sub-base (GSB) by providing Well graded material for Grading III mixing in a Mechanical Mix Plant at OMC carriage mixed material to work site spreading in uniform layers with motor grader on prepared surface and compacting with 80-100 kN Vibratory Roller to achieve the desired density, complete as per Technical Specification of MORTH.
150
1345
201818
... More
Providing, laying, spreading and compacting graded HBG Crushed stone aggregate to Wet mix macadam specification including cost, seigniorage of all material and including premixing the material with water at OMC in mechanical mixer Plant carriage of mixed material by tipper to site, laying in uniform layers with paver in base course on well prepared surface and compacting with Vibratory roller of 8 to 10 to achieve the desired density etc., as directed by the Engineer-in-Charge and as per MORTH & H Specification for finished item of work. (RBR-SBBS-11)
100
2180
218013
... More
Laying of Plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 / 53 grade at cement as per Clause 1501.2.2 (M30 Grade) at 400 kg per cum, coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.28 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, near approaches to bridge / culvert and construction joints, and curing of concrete slabs for 14- days and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.
175
6964
1218845
... More
Carting away the surplus excavated earth from the work site with a lead of 3 km beyond initial lead including loading, unloading and conveyance but excluding stacking charges etc., complete - 1 Cum. Mechanical
318.07
226
72094
... More
Provision for Seignorage charges
-
-
82823
... More
Provision for NAC @ 0.10%
-
-
3268
... More
Provision for GST @ 18%
-
-
588845.34
... More
Provision for TPQA @ 0.749 %
-
-
23858
... More
Unforeseen item
-
-
65933.66
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%