Municipal Corporation Tender

... More
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Municipal Corporation Tender

Works
Civil And Construction
Drainage Work
Opening Date16 Jan 2025
Closing Date23 Jan 2025
Tender Amount₹ 7,15,103 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth work excavation and depositing on bank with an initial lead of 50 Mts and lift of 3 Mts in loamy and clayey soils like black cotton soils, red earth and ordinary gravel as per SS 20-B. For pipe line trench For Manual Means @ 30%

111.34

332

37042.82

... More
S/D and Lowering, laying of SWG pipes in ready made trench true to alignment and gradient, jointing, and testing of stone ware pipes including cost of jointing material such as cement mortar (1:1) proportion and hemp yarn including cost and conveyance of all materials etc; complete. For 150mm dia

140

647

90630.4

... More
S/D and Lowering, laying of SWG pipes in ready made trench true to alignment and gradient, jointing, and testing of stone ware pipes including cost of jointing material such as cement mortar (1:1) proportion and hemp yarn including cost and conveyance of all materials etc; complete. For 100mm dia (For HSC)

30

414

12425.7

... More
Supply and delivery of Saddle pipes various including cost and conveyance of all materials., complete as per S.R.P.No.116 BMW.A.76(MAT-01735) For 150X100mm dia

30

193

5794.5

... More
Manufacture, supply,& delivery of HDPE pipes conforming to IS 4984 - 2016 including transportation to any where in A.P, excluding excise duty, sale tax and specials etc., complete. (Supply up to 90 mm dia in coil & above 90 mm dia straight length in 6 M.) for 110mm dia (6.0Kg/Sq.cm) For HSC

75

388

29142

... More
Supply and delivery of quarry dust from approved quarry including cost and conveyance of all materials and labour charges for stacking at site to departmental guage, spreading, sectioning, seignorage, watering etc., complete as per specification.

142.55

1186

169204

... More
Conveyance of excavated earth with an average lead of 2 Km including loading, unloading, spreading and stocking etc. complete

159.05

60

9612.98

... More
Bailing out of water with oil engine, driven pumpset including hire charges, fuel charges and wages of driver and helper etc., complete as per the directions of departmental authorities.

40

84

3365.2

... More
Construction of circular manholes with a slope of 30mm to 50mm in the channel along with sewer lines as per the approved departmental drawings including cutting of C.C/B.T/WBM, earth work excavation and laying of C.C M10 bed with 40mm H.B.G. metal, brick work with C.M. (1:3) for Manhole using 2nd class best quality.The rate includes plastering with C.M(1:3) 20mm thick both inside and out side and smooth finishing of Sewer channel, providing top coping 150mm thick with R.C.C M30 Design Mix using 400Kgs of Cement/Cum including supply and fixing of 35 H.D Manhole cover as per BIS:12592 (Part 1&2) with frame and encapsulated plastic steps including cost and conveyance of all materials, including cost and fabrication of steel used in R.C.C coping as per S.S. including benching, channeling, finishing and refilling with excavated earth and conveyance of surplus earth etc., complete as per S.S and as directed by the departmental authorities for finished item of work. (APDSS NO.1325) For Circular Manhole 1.50m deep (1.36 to 1.65M)

6

27082

162494.46

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD. Unit = cum. including cost and conveyance of all materials and labour charges etc,Complete.

19.55

6812

133188.09



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.