Municipal Corporation Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Municipal Corporation Tender
Civil And Construction
Drainage Work
Opening Date14 Aug 2024
Closing Date28 Aug 2024
Tender Amount₹ 15,97,223
Costs
EMD
₹ 16,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
748163Tender No
Rc.E6-117141/2022Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://vijayawada.cdma.ap.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Manual 70 %
195.3
25580
130.98
... More
Mechanical 30%
83.7
26208
313.13
... More
Conveyance of excavated earth with an average lead of 2 KM including loading, unloading etc; complete as per SS and also as per the directions of departmental authorities.
288.12
17088
59.31
... More
Supply and Delivery of Quarry Dust from approved quarry including cost and conveyance of all materials labour charges, spreading, sectioning, ramming, watering etc complete as per SS.
22
25396
1154.4
... More
Centering charges for Drain sections of CC/RCC including all materials and labour charhes for forming etc.
300
170424
568.08
... More
Providing M-10 using 40mm HBG crushed metal from approved quarry including cost and conveyance Seigniorage charges of all materials and labour charges and Machine mixing Laying, Watering, Curing charges etc., complete as per SS. The Seignorage charges are excluding CP & TP.
33
152808
4630.56
... More
Supply and placing of the RCC M20 (Design Mix) concrete corresponding to IS 456 using weigh batcher / 60% of mixer 20mm size graded machine crushed hard granite metal (coarse aggregate) 40% of 10mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggrregate (sand) coarse aggregate, water etc., to site and including all labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work.cement 347kg
-
-
-
... More
wall
78
470657
6034.07
... More
culvert slab
3.54
22221
6277.27
... More
Providing concrete for plain concrete (M20 Design mix) using 343 Kgs Cement 40mm,20 mm,10mm nominal size Graded hard stone aggregate , mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications of MORTH
2.7
16470
6100.1
... More
Supplying, fitting and placing HYSD bar reinforcement as per drqwings and technical specifications clauses 1000 and 1202 MORD & 1100, 1600 MORTH for bars below 36mm dia including over laps and wastage, where they are not welded including cost and conveyance of binding wire and preparation and tying grills and fixing in position and labour charges etc., complete
6523.2
614094
94.14
... More
Manufacturing,supply,Delievery and Fixing of M.S.Iron gate,MS grill using with M.S.Angulars,M.S.flats including cost and conveyance of all materials and labour charges for cutting,welding,grinding and fixing etc.,,complete as directed by departmental authorities.
143
18558
129.78
... More
Bailing out of water from pipe line trenches with oil engine driven pump sets including hire charges, fuel charges, wages of driver and helper etc., complete
240
18811
78.38
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements