To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Municipal Corporation Tender

Civil And Construction
Drainage Work
Opening Date6 Oct 2022
Closing Date20 Oct 2022
Tender Amount₹ 6,42,601 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Damaged Out fall Drain;Providing concrete for plain concrete (M10) using 220 kgs cement ,40mm nominal size hard stone aggregate, mechanically mixed placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications of MORTH

3.8

-

17018.45

... More
Construction of Damaged Out fall Drain;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering., including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) (BLD-CSTN-3-14) but excluding seignorage charges For Raft Foundations

7.5

-

77791.27

... More
Construction of Damaged Out fall Drain;R.C.C grade M 20 using Concrete mixer (Nominal Mix) using 20 mm Graded Metal (MORD)(Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering., including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work For RCC Walls

29.7

-

289615.69

... More
Construction of Damaged Out fall Drain;Supplying , fitting and placing Fe- 415 bar reinforcement in VRCC works complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage,where they are not welded including cost and conveyance of steel , binding wire etc., lifting charges of steel , placing in position, tying with binding wire , all tools etc., complete for finished item of work

1800

-

169254

... More
Construction of Damaged Out fall Drain;Supply and delivery of 110mm dia PVC 6KG/CM2 including cost and conveyance of all materials and labour charges etc., complete as per SS

9

-

3466.35

... More
Construction of Damaged Out fall Drain;Bailing of water with 5HP oil engine including hire charges and operational chages fuel charges helper wages etc as dept authorities

75

-

5520

... More
Construction of Damaged Out fall Drain;Laying Sand Bags in the stipulated places including cost of empty cement bag, sand, thread,stiching charges and labour charges with 13.615 % overhead charges and contractors profits.Note: During the emergency conditions such as floods and other natural calamities, the above rate is allowed to enhance by 25% for 1st warning level and above,keeping in view of the difficulty in availability of labour and vehicles..

70

-

2450

... More
Construction of Damaged Out fall Drain;Carting away the surplus earth, cement concrete, brick and stone debris from the wor site with a lead of 2KM beyond initial lead incl. Loading, unloading and conveyance etc., complete as directed by dept. authorities

25

-

1431.5

... More
Construction of Damaged Out fall Drain;Centering charges for RCC vertical walls of plane surface (rate is for both sides centering) including cost and conveyance of all materials and labour charges for threading, fabrication, fixing in position etc.complete.as directed by the Engineer -In- charge

75

-

42606



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.