To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Municipal Corporation Tender
Civil And Construction
Drainage Work
Opening Date18 Jan 2025
Closing Date4 Feb 2025
Tender Amount₹ 6,16,883
Costs
EMD
₹ 6,169Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
780498Tender No
ET No.63/2024-25 Item No.01Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://http://www.gunturcorporation.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Carting away the surplus excavated earth from the work site with a lead of 1 km beyond initial lead including loading, unloading and conveyance but excluding stacking charges etc., complete - 1 Cum.
110.63
107
11940
... More
Filling of Stone Crusher Dust for foundation trenches including cost and conveyance off all materials and all labour charges ramming,watering etc, as per drawing and technical specification in Clause 305.3.9 MORD & 304 MORTH
33.3
673
22424
... More
Providing concrete for plain/reinforced concrete (M10) in open foundations using 20 mm Graded hard stone aggregate , mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.
For drain bed
33.3
4875
162342
... More
Providing concrete for plain/reinforced concrete (M10) in open foundations using 20 mm Graded hard stone aggregate , mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.
For drain Wall
36
5341
192295
... More
Plastering in C.M (1:3) 12 mm thick including cost and conveyance of all Material, Labour for mixing Material, laying and curing etc., complete - 10 Sq.M. (BLD-CSTN-6.2)
282.6
405
114642
... More
VRCC M-20 Design mix (Cement: fineaggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shutteing for culvert slabs
1.08
5829
6296
... More
Providing High Yield Strength Deformed (HYSD) Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors. ( APSS No.126)
108
92
9947
... More
Cost supply and delivery of Taps materials of best quality including loading un loading transportation etc completed as per ss
1/2" HDPE Pipes
150
35
5250
... More
4" MS Clamp
30
200
6000
... More
1/2" unions
30
55
1650
... More
1/2" GI Couplings
30
20
600
... More
1/2" X 2" GI Nipples
30
10
300
... More
1/2" X 3" GI Nipples
30
20
600
... More
1/2" X 4" GI Nipples
30
20
600
... More
1/2" X 6" GI Nipples
30
40
1200
... More
1/2" X 9" GI Nipples
30
55
1650
... More
1/2" x 1/2 reducer
30
60
1800
... More
1/2" u bends
30
50
1500
... More
Engaging of Plumber and Helper for fixing of broken taps including all labour Charges plumbers
8
852
6817
... More
man mazdoors
10
636
6362
... More
Provision for Seignorage Charges
-
-
17310
... More
Provision for NAC @ 0.10%
-
-
634
... More
Provision for GST @ 18%
-
-
114269
... More
Provision for TPQA @ 0.749 %
-
-
4620
... More
Unforeseen item
-
-
6284
... More
TOTAL
-
-
760000