Municipal Corporation Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Municipal Corporation Tender
Civil And Construction
Drainage Work
Opening Date18 Jan 2025
Closing Date4 Feb 2025
Tender Amount₹ 6,42,265
Costs
EMD
₹ 6,423Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
780474Tender No
ET No.63/2024-25 Item No.08Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://http://www.gunturcorporation.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Earthwork excavation in Ordinary soil by Mechanical Means upto 3 m depth for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH (RBR-FNDN-1(B)) - 1 Cum
97.2
128
12448
... More
Carting away the surplus excavated earth from the work site with a lead of 1 km beyond initial lead including loading, unloading and conveyance but excluding stacking charges etc., complete - 1 Cum.
112.55
107
12148
... More
Filling of Stone Crusher Dust for foundation trenches including cost and conveyance off all materials and all labour charges ramming,watering etc, as per drawing and technical specification in Clause 305.3.9 MORD & 304 MORTH
32.4
673
21818
... More
Providing concrete for plain/reinforced concrete (M10) in open foundations using 20 mm Graded hard stone aggregate , mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.
For drain bed
32.4
4875
157955
... More
Providing concrete for plain/reinforced concrete (M10) in open foundations using 20 mm Graded hard stone aggregate , mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.
For drain Wall
36
5341
192295
... More
Plastering in C.M (1:3) 12 mm thick including cost and conveyance of all Material, Labour for mixing Material, laying and curing etc., complete - 10 Sq.M. (BLD-CSTN-6.2)
276
405
111965
... More
Cost supply and delivery of Taps materials of best quality including loading un loading transportation etc completed as per ss
1/2" HDPE Pipes
90
35
3150
... More
4" MS Clamp
18
200
3600
... More
1/2" unions
18
55
990
... More
1/2" GI Couplings
18
20
360
... More
1/2" X 2" GI Nipples
18
10
180
... More
1/2" X 3" GI Nipples
18
20
360
... More
1/2" X 4" GI Nipples
18
20
360
... More
1/2" X 6" GI Nipples
18
40
720
... More
1/2" X 9" GI Nipples
18
55
990
... More
1/2" x 1/2 reducer
18
60
1080
... More
1/2" u bends
18
50
900
... More
Engaging of Plumber and Helper for fixing of broken taps including all labour Charges plumbers
8
852
6817
... More
man mazdoors
10
636
6362
... More
Provision for Seignorage Charges
-
-
18021
... More
Provision for NAC @ 0.10%
-
-
660
... More
Provision for GST @ 18%
-
-
118970
... More
Provision for TPQA @ 0.749 %
-
-
4811
... More
Unforeseen item
-
-
10273
... More
TOTAL
-
-
795000