Municipal Corporation Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Municipal Corporation - GVMC Tender
Opening Date12 Jan 2021
Closing Date29 Jan 2021
Tender Amount₹ 68,96,821
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
370468Tender No
T No. 39/2020-21/SE-W/EE-I/DB, dt. 12-01-2021 (Item No. 10)Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://www.gvmc.gov.in/wss/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Construction of Urban Primary Health Center;Laying Cement Concrete (1:4:8) using 40mm Hard Broken granite metal (SS-5) from approved quarry mixing by machine and depositing the premix in position of the foundation trenches, tamping and watering for curing including cost and conveyance of all materials, all labour charges and hire charges for the mixing machine etc., complete for Bed Concrete as per SS and as directed by the Engineer - in - Charge. for bed concrete.
65
-
294860.15
Construction of Urban Primary Health Center;Laying VCC M-15 (1:2.5:5) mix using 20 mm Hard Broken Granite metal from approved quarry mixing by machine and depositing the premix in position of the foundation trenches ,tamping and watering for curing including cost and conveyance of all materials all labour charges etc., complete as per SS and as directed by the Engineer-in-charge (Machine motering)
28
-
146455.12
Construction of Urban Primary Health Center;Supply and placing of the M-30 design mix concrete corresponding to IS: 456 using weigh batcher / mixer 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and all labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and fabrication of steel and its fabrication charges for finished item of work.
-
-
-
Construction of Urban Primary Health Center;For Column Footings
36
-
339015.24
Construction of Urban Primary Health Center;For Columns
18
-
211529.17
Construction of Urban Primary Health Center;For Plinth Beam
17
-
204593.03
Construction of Urban Primary Health Center;For Lintals
4
-
46365.76
Construction of Urban Primary Health Center;For Sunshades
42
-
46523.4
Construction of Urban Primary Health Center;For Roof Beams
26
-
266243.51
Construction of Urban Primary Health Center;For Roof Slab (125mm thick Slab)
56
-
520739.23
Construction of Urban Primary Health Center;Supply and delivery of HYSD (High Yield Strength Deformed) bars of Fe 415 grade of various diameters confirming to IS: 1786 including straightening, cutting, bending and fabrication of reinforcement including palcing in position, binding, and all labour charges and cost of binding wire etc., complete.(Over laps should not be measured for payment )
18000
-
1187640
Construction of Urban Primary Health Center;Fal-G brick Masonry in Cement Mortor (1:6) using local best quality bricks of well brunt table moulded 2nd class watering for curing including cost and conveyance of all materials and all labour charges etc., complete as per SS and as directed by the Engineer-in-Charge
56
-
346561.04
Construction of Urban Primary Health Center;Brick masonry in Cement Mortar (1:6) mix using Local best quality bricks of well burnt table moulded of size 23x11x7 cm, watering for curing including cost and conveyance of all materials and all labour charges etc., complete as per SS and as directed by the Engineer - in - Charge. for Ground floor super structure.
127
-
798503.61
Construction of Urban Primary Health Center;Providing Plastering in Cement Mortar (1:4) 12mm thick watering for curing including cost of materials, scafolidng and watering and conveyance of all materials and all labour charges etc., complete as per SS and as directed by the Engineer - in - Charge.
1370
-
505488.9
Construction of Urban Primary Health Center;Providing Accoproof Plastering in Cement Mortar (1:3) 20mm thick using 1 Kg. of impervious water proof compound for 50Kg. Of Cement, watering for curing including cost of materials, scafolding and watering and conveyance of all materials and all labour charges etc., complete as per SS and as directed by the Engineer - in - Charge.
432
-
233297.28
Construction of Urban Primary Health Center;Providing Cieling Plastering in Cement Mortar (1:3) 8mm thick watering for curing including cost of materials, scafolidng and watering and conveyance of all materials and all labour charges etc., complete as per SS and as directed by the Engineer - in - Charge. for Ground floor.
450
-
122049
Construction of Urban Primary Health Center;Flooring with ceramic tiles, set over base coat of cement mortar (1:6) 12 mm thick over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spread @ 3.3 kgs per sqm & jointed with neat cement to full depth mixed with pigment of matching shade including cost of all material like cement, sand waqter and tiles etc., complete for finished item of work, but including the cost of conveyance of all material as directed by the Engineer - in - Charge.
24
-
23063.28
Construction of Urban Primary Health Center;Flooring with high strength cement concrete tiles of regular colour, design having size 25 mm thickness set over a base coat of cement mortar (1:4) 20mm thick over already laid CC bed or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 Kgs per sqm and jointed with neat cement to full depth mixed with pigment of matching shade including cost and conveyance of materials like cement, sand, water and tiles etc., complete for finished item or work as per SS and as directed by the Engineering incharge
40
-
21066.8
Construction of Urban Primary Health Center;Providing and fixing 28 -30 MM thick solid Wood Polymer Composite (WPC) single extruded door shutter with 3MM top and bottom rigid layer with an overall density of 750kg/Cum. It will be fixed to the frame using 3 inch /4 inch hinges. A minimum of 4 hinges will be required for fixing the door with the frame
9
-
30982.77
Construction of Urban Primary Health Center;Supply, Delivery and fixing position of fully panelled teak wood doors made with well sweasoned 1st class Burma Teak (Best Teak wood) wood all round door required height and panel door shutter made alround frame with 100x40mm bottom rail 150x40 mm frieze rail & top rail with 120x40 mm rock rail 180x40 mm size and at centre 25 mm thick panels of all well seasoned teak wood and using all alluminium door fittings such as Tower bolts 30 cm, upper, lower 15 cm bull linger (10 cm) door handles 15 cm. aldrop 30 cm, screws, door stopper and applinces including cost & conveyance of all materials and all labour charges and as directed by the Engineer - in - Charge
13
-
144877.72
Construction of Urban Primary Health Center;Supply, Delivery and fixing in position of Fully paneled country wood windows made with well seasoned 1st class country (Nallamaddi / Sal) with alround door main frame of size 8x12cm to required height and paneled door shutters made alround frame with 100x40mm, bottom rail 150x40mm ,frieze rail & Top rail with 120X40mm, lock rail 180x40mm sizes and at center 25mm thick pannels of all well seasoned country wood and using all Alluminium window fittings such as Tower bolts (30cm upper, 15cm Lower), Butt hinges(10cm), Door handles (15cm), Aldrops (30cm), screws, Door stoppers or wind applicances, iron 'Z' holdfasts etc., including cost and conveyance of all materials and all labour charges etc. , for finished item of work complete as per SS and as directedby the Engineer-in-charge For country wood windows.
37
-
270654.26
Construction of Urban Primary Health Center;Supply and Delivery of 50 mm thick RCC Ventilaters Jolleys and Ventelaters placing in positionincluding cost and conveyance of all materials and all labour charges etc., complete as per SS and as directed by the Engineer-in-Charge
2
-
771.42
Construction of Urban Primary Health Center;Painting to internal Walls with interior emulsion paint two coats over primer coat including cost and conveyance of all materials and all labour charges etc., complete as per SS and as directed by the Engineer-in-Charge
820
-
210838.4
Construction of Urban Primary Health Center;Painting with Enamel paint two coats over one coat of Primary paint including cost and conveyance of all materials and all labour charges etc., complete as per SS and as directed by the Engineer-in-Charge
60
-
12750.6
Construction of Urban Primary Health Center;Providing name board with Eanamel paint Telugu Lettering Including all labour charges etc, Complete & as directed by the Dept, officers.
1
-
5000
Construction of Urban Primary Health Center;Supply, delivery and fixing following Electrical Items including cost and conveyance of all materials and all labour charges etc., complete as per SS and as directed by the Engineer-in-Charge
-
-
-
Construction of Urban Primary Health Center;APEPDCL 3Phase meter connection
1
-
12000
Construction of Urban Primary Health Center;Service Wire
50
-
2750
Construction of Urban Primary Health Center;Light points
100
-
57823
Construction of Urban Primary Health Center;Fan points
20
-
19745
Construction of Urban Primary Health Center;LED Tube Light
30
-
22500
Construction of Urban Primary Health Center;Fans
24
-
51008.4
Construction of Urban Primary Health Center;Copper wire 1.5 Sqm
300
-
2775
Construction of Urban Primary Health Center;2.36 Sqm Copper Wire
300
-
6825
Construction of Urban Primary Health Center;Supply and run of 2 of 56/0.3mm (4.0 Sq.mm) F.R. PVC insulated flexible copper cable in existing pipe for mains including all labour charges etc., complete as per SS
200
-
23700
Construction of Urban Primary Health Center;Supply and Delivery of LED Bulkets & bulbs including cost and conveyance of all materials and all labour charges etc., complete as per SS and as directed by the Engineer-in-Charge
10
-
11000
Construction of Urban Primary Health Center;Supply and Delivery of EXAUST Fans 12" (Mediam) including cost and conveyance of all materials and all labour charges etc., complete as per SS and as directed by the Engineer-in-Charge
4
-
9600
Construction of Urban Primary Health Center;Supply and Delivery of Yard lights including cost and conveyance of all materials and all labour charges etc., complete as per SS and as directed by the Engineer-in-Charge
4
-
18000
Construction of Urban Primary Health Center;Supply and Delivery of 12 way SPNDB including 63 DP isolator and 10 to 20A SPMCB's including cost and conveyance of all materials and all labour charges etc., complete as per SS and as directed by the Engineer-in-Charge
1
-
6033.25
Construction of Urban Primary Health Center;Supply and fixing of 12"X15" Teak wooden board with 1 no of 32A fuse unit and 1 No of 32 A DP MCB with neutral link fixing with necessary arrangements etc complete as directed by Engineer Incharge .
1
-
976.26
Construction of Urban Primary Health Center;Supply and fixing of 16A 3 pin / 6A 3 pin plug socket with make Legrand Arteor / Schneider Zen celo/ CrabtreeMurano/ GM-Zenova/Goldmedal(i-Push) 16 Amps switch control (5 in one) on decolam sheet covered board including earth connection and all labour charges etc., complete on wall as per data
20
-
6579
Construction of Urban Primary Health Center;Supply, delivery and fixing of following Water Supply Items including cost and conveyance of all materials and all labour charges etc., complete as per SS and as directed by the Engineer-in-Charge
-
-
-
Construction of Urban Primary Health Center;Tap's
10
-
1200
Construction of Urban Primary Health Center;25mm Dia UPVC Pipe
200
-
24000
Construction of Urban Primary Health Center;15 mm Dia UPVC Pipe
150
-
12000
Construction of Urban Primary Health Center;Unions
8
-
800
Construction of Urban Primary Health Center;Gate Valve
5
-
900
Construction of Urban Primary Health Center;4" PVC Pipe
50
-
14768
Construction of Urban Primary Health Center;4" L Bend
5
-
900
Construction of Urban Primary Health Center;4" T Bend
5
-
750
Construction of Urban Primary Health Center;Supply, Delivery and fixing of Double layer Polyethylene water storage tank with lid of Syntex or equivalant conforming to IS 12701/96 including cost and conveyance of all materials and all labour charges including transport etc., complete as per SS and as directed by the Engineer - in - Charge.
2000
-
17100
Construction of Urban Primary Health Center;Drilling of tube well by down the hole hammer drilling of finished diameter of 180mm dia in all formations of soils including insertion of 180mm dia PVC casing pipe of 6kg/cm sq of ISI make and providing cap as directed by the departmental officer and transportation of drilling equipment and supprting vehicle etc., complete but excluding cost of PVC casing pipe etc., complete
10
-
4500
Construction of Urban Primary Health Center;Supply and delivery of 180 mm dia PVC casing pipe 6kg/cm sq including cost and conveyance all charges as per directed department officers complete etc.,(SSR rates)
10
-
5920
Construction of Urban Primary Health Center;Drilling of tube well by down the hole hammer drilling of finished diameter of 165mm dia in all formations of soil including insertion of 140mm dia PVC casing pipe of 6kg/cm sq of ISI make and providing cap as directed by the departmental officer and transportation of drilling equipment and supporting vehicle etc,. complete but excluding cost of PVC casing pipe etc., complete
60
-
19500
Construction of Urban Primary Health Center;Supply and delivery of 140 mm dia PVC casing pipe 6kg/cm sq including cost and conveyance all charges as per directed department officers complete etc.,(SSR rates)
60
-
21240
Construction of Urban Primary Health Center;Supply and delivery of 1 HP Submersible motor (3 phase) make of kirloskar/CRI or any other equivalent make including cost of all materials and all labour charges etc complete as per directed department officers complete etc.,
1
-
22000
Construction of Urban Primary Health Center;Labour charges for fixing of submersible motor including cost of all materials and all labour charges etc complete as per directed department officers complete etc.,
1
-
4000
Construction of Urban Primary Health Center;Supply, laying and termination of 2.5 sqmm submersible flat cable including cost of all materials and all labour charges etc complete as per directed department officers complete etc.,
60
-
5266.8
Construction of Urban Primary Health Center;Supply and delivery of 32 mm dia HDPE pipe PE-100, PN16 including cost of all materials and all labour charges etc., complete as per SS and as directed by the Engineer incharge.
60
-
5580
Construction of Urban Primary Health Center;Supply delivery and fixing of stainless steel rainy for approval delivery inculding cost and conveyance of all materials and all labour charges etc., complete as per SS and as directed by the Engineer incharge.
150
-
97500
Construction of Urban Primary Health Center;Supplying & Fixing white glazed flat back half stall urinals 1st quality conforming to IS:2556-1995 with standard C.P. Spreader of overall size 95 x 95 x 57 mm conforming to IS:2556-Part6, Sec-6-1974 fixed with screws complete Indian make : 410 x 265 x 305 mm
4
-
11042.08
Construction of Urban Primary Health Center;Supplying & Fixing Indian makeFlat Back Wash Hand Basin1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain,32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block: 550 x 400 mm - Single C.P. Pillar cock
3
-
5720.43
Construction of Urban Primary Health Center;Supplying and Fixing European Water Closet of 1st quality conforming to IS:2556-Part-2-1973 ofwhite glazedwith 'S' trap Labour charges only for fixing European Water Closet with 'P' or 'S' trap as per standard practice
4
-
8161.84
Construction of Urban Primary Health Center;Supplying & Fixing low down porcelain flushing tank 10 Lit Capacitywith internal components Labour charges only for fixing low down porcelain flushing tank with internal components
4
-
10961.08
Construction of Urban Primary Health Center;Supplying & Fixing Orissa Pan white glazed W.C 1st quality ISI marked conforming to IS:2556-Part-3-1981 with"P" or "S" trap: 630 mm x 450 mm Labour charges only Fixing Orissa pan W.C with"P" or "S" trap
4
-
7270.12
Construction of Urban Primary Health Center;Supply, delivery and fixing of fabricated steel window grills, compound wall grills, iron doors and windows including cost of welding rods, power charges and fixing charges in position as directed by the departmental officers and as per SS using Mild steel structure steel, i.e, angles, Channels and Isections. Fabrication Charges as required as per item BMM-V.14 and Labour Charges for fixing as per Item BMM V.15
230
-
20072.1
Construction of Urban Primary Health Center;Supply, delivery and fixing of Aluminium with powder coated partitions with navapan sheet and glass all materials and all labour charges etc., complete as per SS and as directed by the Engineer-in-Charge
28
-
134400
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements