Municipal Corporation Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Municipal Corporation Tender

Works
Civil And Construction
Civil Works Others
Building Construction
Opening Date26 Feb 2024
Closing Date29 Feb 2024
Tender Amount₹ 9,56,966 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply and placing of the RCC M20 (Design Mix) concrete corresponding to IS 456 using weigh batcher / mixer 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggrregate (sand) coarse aggregate, water etc., to site and including seigniorage charges, on all labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work. For Piles 230 mm dia

7.2

55444

7700.62

... More
Supply and placing of the RCC M20 (Design Mix) concrete corresponding to IS 456 using weigh batcher / mixer 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggrregate (sand) coarse aggregate, water etc., to site and including seigniorage charges, on all labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work. For Plinth Beam

4.4

59559

13536.22

... More
Supply and placing of the RCC M20 (Design Mix) concrete corresponding to IS 456 using weigh batcher / mixer 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggrregate (sand) coarse aggregate, water etc., to site and including seigniorage charges, on all labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work. For Columns

3.8

50756

13357.1

... More
Supplying, fitting and placing HYSD bar reinforcement as per drqwings and technical specifications clauses 1000 and 1202 MORD & 1100, 1600 MORTH for bars below 36mm dia including over laps and wastage, where they are not welded including cost and conveyance of binding wire and preparation and tying grills and fixing in position and labour charges etc., complete

1390

130854

94.14

... More
Collection and Supply of Dust for filling including Cost and coneyance charges, Spreading, Sectioning etc., complete.

4

4617

1154.4

... More
Providing concrete for plain concrete (M10) using 220 Kgs Cement ,40 mm nominal size hard stone aggregate , mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications of MORTH

4

19449

4862.4

... More
Brick Masonry in CM (1:6) with Bricks traditional size 23x11x7 cms 2nd class including cost and conveyance of all materials, seigniorage charges and labour charges for mixing of mortor watering curing etc. complete

27

211906

7848.39

... More
Plastering with Cm (1:4) 12mm thick including cost and conveyance of all materials and labour charges etc., complete as per ss.

435

127009

2919.76

... More
Supply and fixing of Cement Joli of 40mm thick including cost and conveyance of all materials and labour charges etc., complete as per ss.

45.36

14584

321.53

... More
Painting, priming coat on new plastered surface to given an even shade after throughly brushing the surface to remove all dirt and remains of losse powdered materials, including cost and conveyance of all materials to work site and all operational incidental labour charges etc., complete for finished item of work as per SS

435

37038

851.46

... More
Painting with Plastic emulsion paint Grade-I to given an even shade after throughly brushing the surface to remove all dirt and remains of losse powdered materials, including cost and conveyance of all materials to work site and all operational incidental labour charges etc., complete for finished item of work as per SS Two coats -Plastered Surface(External Walls)

435

105960

2435.88

... More
Manufacturing, Supply, Delivery and fixing of M.S. Iron Gate , MS Grills using with M.S. Angulars, M.S. flats and 20mm square rods for grills including cost and conveyance of all materials and labour charges for cutting, welding, grinding and fixing etc., , complete.as directed by the departmental authorities.

491

63721

129.78

... More
Painting with Synthetic Enamel Paints -Two coats -for New Iron work to given an even shade after throughly brushing the surface to remove all dirt and remains of losse powdered materials, including cost and conveyance of all materials to work site and all operational incidental labour charges etc., complete for finished item of work as per SS

16

2021

1263.3



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.