Municipal Corporation Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Municipal Corporation Tender
Opening Date26 Dec 2020
Closing Date4 Jan 2021
Tender Amount₹ 5,56,148 This is an estimated amount, exact amount may vary.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
366532Bid Award Id
ViewTender No
39-4/General Fund/EE&SE/Knl/20-21,dt.24-12-2020Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
s4;Earth work excavation for foundations (Manual Means) of buildings, septic tank, sump, compound wall in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308) (Machinery)
21
-
2233
... More
s4;Supply and filling with Sand complying with standard specifications including cost and conveyance of sand to site to work labour charges watering tamping, ramming etc
3
-
2408
... More
s4;Laying Cement concrete (1:4:8) using 40mm nominal size HBG metal including cost and conveyance of all materials from approved quarry, machine mixing, vibrating, laying, levelling, ramming, curing and labour charges etc., complete. (APSS No. 402)
53
-
189922
... More
s4;V.C.C. (1:3:6) using 20mm (SS-5) HBG M/C Metal and Opc course and fine agregates conforming to IS:383 including cost and conveyance of all materials, Labour charges, Machine Mixing, vibrating, laying in position quring for 21 days For Bed as per APSS -402
3
-
12852
... More
s4;V.C.C. (1:3:6) using 20mm (SS-5) HBG M/C graded Metal and Opc course and fine agregates conforming to IS:383 including cost and conveyance of all materials, Labour charges, Machine Mixing, vibrating, centring, laying in position quring for 21 days including centering charges as per APSS - 402 for Side Walls
11
-
49841
... More
s4;Supply and placing of the M20 Design Mix Concrete corresponding to IS 456 using MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. Type as per specification-RBR-SBST-5(V) P-559. For Culvert Slab
7
-
39722
... More
s4;Providing High Yield strength deformed steel bars (Fe 415 grade as per IS 1786-1979) of different diameters including labour charges for cutting bending to required sizes and shapes placing in position with cover blocks of approved size and tying with binding wire of 20 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site of work, including cost and conveyance of binding wire cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc complete for finished item of work as per (SS No.126 of APSS) and as directed by the Enigneer-in-charge of the work.
600
-
38808
... More
s4;Plastering in CM(1:3) prop: 12mm thick with dubara sponge finishing including cost and conveyance of all materials and operational, incidental charges and all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing including cutting grooves etc complete and as directed by Engineer complete for finished item of work
17
-
5746
... More
s4;Plain Cement concrete ( 1: 2 :4) prop : nominal mix (Cement : Fine aggregate: coarse aggreage) using 20mm (SS5) graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate and coarse aggregate water etc., to site, cost of seigniorage charges on all materials including centering shuttering machine mixing laying concrete in position curing and centering charges etc., and as directed by the Engineer-in - charge of work for finished item of work (APDSS No. 402 & 403)
51
-
242817
... More
s4;Carting away the surplus excavated earth from the work site with a lead of 1.00 Km beyond initial lead including loading, unloading and conveyance but excluding stacking charges etc. complete. For a lead of 1 KM
27
-
1307
... More
s4;Bailing out of water with oil engine includng fuel, operator batta all labour charges etc complete (5 HP Motor)
60
-
17240