Municipal Corporation Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Municipal Corporation Tender

Works
Civil And Construction
Drainage Work
Opening Date26 Dec 2024
Closing Date2 Jan 2025
Tender Amount₹ 7,75,913 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth work excavation of strucures as per drawing and technical specifications Clauses 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50m. Dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH

50

332

16635

... More
Collection and Supply of Dust for filling including Cost and coneyance charges. Spreading, Sectioning etc., complete

17

1186

20178.66

... More
Providing concrete for plain concrete (M10) using 220 Kgs Cement ,40 mm nominal size hard stone aggregate , mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications of MORTH

17

4634

78785.48

... More
Providing concrete for plain concrete (M20 Design mix) using 343 Kgs Cement 20 mm,lOmm nominal size Graded hard stone aggregate , mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications of MORTH

-

-

-

... More
Drain walls

35

6304

220643.5

... More
Drain beds

18

6059

109075.5

... More
Supply and placing of the RCC M20 (Design Mix concrete corresponding to IS 456 using weigh batcher / mixer 20mm,10mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry, Cement 347 Kgs including cost and conveyance of all materials like cement, fine aggrregate (sand) coarse aggregate, water etc., to site and all labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work. For Culvert Slabs

1.3

6286

8172.09

... More
Providing High Yield Strength Deformed ( HYSD /Thermo Mechanically Treated (TMT) / Mild Steel (MS) Steel bars of SAIL / VSP / TATA (Fe 415 grade as per IS 1786-1979) of different diameters for RCC works including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including all materials etc., complete for finished item of work as per SS.

403.2

93

37505.66

... More
Manufacturing, Supply, Delivery and fixing of M.S. Iron Gate, MS Grill using with M.S. Angulars, M.S. flats including cost and conveyance of all materials and labour charges for cutting, welding, grinding and fixing etc.,, complete.as directed by the departmental authorities.

400

131

52460

... More
Bailing out of water from pipe line trenches with oil engine driven pump so s including hIre charges. fuel charges, wages of dnver and helper et ,,complete

300

84

25239

... More
Conveyance of excavated earth with an average lead of 2 KM including loading, unloading etc;spreading and stocking etc complete as per SS Sor P.No.350

190

115

21874.7



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.