Municipal Corporation Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Municipal Corporation Tender
Civil And Construction
Drainage Work
Opening Date23 Dec 2024
Closing Date8 Jan 2025
Tender Amount₹ 24,48,122
Costs
EMD
₹ 24,481Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
775807Tender No
ET NO.51/2024-25, Item No.01Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://http://www.gunturcorporation.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Earthwork excavation in Ordinary soil by Mechanical Means upto 3 m depth for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH (RBR-FNDN-1(B)) - 1 Cum
477
128
61089
... More
Carting away the surplus excavated earth from the work site with a lead of 3 km beyond initial lead including loading, unloading and conveyance but excluding stacking charges etc., complete - 1 Cum.
396.49
144
57344
... More
Filling of Stone Crusher Dust for foundation trenches including cost and conveyance off all materials and all labour charges ramming,watering etc, as per drawing and technical specification in Clause 305.3.9 MORD & 304 MORTH
119.26
673
80307
... More
Providing concrete for plain/reinforced concrete (M10) in open foundations using 20 mm hard stone aggregate , mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.
119.26
4875
581410
... More
Providing concrete for plain/reinforced concrete (M10) in open foundations using 20 mm hard stone aggregate , mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.
168.3
5341
898979
... More
Plastering in C.M (1:3) 12 mm thick including cost and conveyance of all Material, Labour for mixing Material, laying and curing etc., complete - 10 Sq.M. (BLD-CSTN-6.2)
1239
405
502625
... More
Providing High Yield Strength Deformed (HYSD) Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors. ( APSS No.126)
1152
92
106099
... More
VRCC M-20 Design mix (Cement: fineaggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shutteing for culvert slabs
9.6
5829
55962
... More
Manufacture as per BIS:12592 (Part 1&2) Supply & Delivery of manhole covers and frames with ISI marking anywhere in A.P., F.O.R. destination including, loading, un-loading & stacking at site but excluding all taxes.
10
2423
24234
... More
Bailing out water from the pipe line trenches with oil engine driven pump sets, including hire charges, fuel charges and wages for Driver and Helper.
150
83
12543
... More
Provision for Seignorage charges
-
-
49733
... More
Provision for NAC @ 0.10%
-
-
2498
... More
Provision for GST @ 18%
-
-
450064
... More
Provision for TPQA @ 0.749 %
-
-
18336
... More
Unforeseen item
-
-
31247
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%