Municipal Corporation Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Municipal Corporation Tender

Works
Civil And Construction
Drainage Work
Opening Date26 Oct 2024
Closing Date13 Nov 2024
Tender Amount₹ 5,77,734 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earthwork excavation in Ordinary soil by Manual Means upto 3 m depth for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH (RBR-FNDN-1(A)) - 1 Cum

66.21

282

18708

... More
Filling of Stone Crusher Dust for foundation trenches including cost and conveyance off all materials and all labour charges ramming,watering etc, as per drawing and technical specification in Clause 305.3.9 MORD & 304 MORTH

25.85

673

17407

... More
Providing concrete for plain/reinforced concrete (M10) in open foundations using 20 mm Graded hard stone aggregate , mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.

24.68

4875

120319

... More
Providing concrete for plain/reinforced concrete (M10) in open foundations using 20 mm Graded hard stone aggregate , mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. Walls

25.55

5341

136476

... More
Plastering in C.M (1:3) 12 mm thick including cost and conveyance of all Material, Labour for mixing Material, laying and curing etc., complete - 10 Sq.M. (BLD-CSTN-6.2)

226.85

405

92026

... More
Supply and Delivery of 0.90 mts rcc manholes cover hd 20 with 560mm dia clear opening standard make the quality approved by technical authority etc.,

1

2423

2423

... More
VRCC M-20 Design mix (Cement: fineaggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shutteing for culvert slabs

1.35

5829

7870

... More
Providing High Yield Strength Deformed (HYSD) Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors. ( APSS No.126)

121.5

92

11190

... More
Laying of Plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 / 53 grade at cement as per Clause 1501.2.2 M30 (Grade) at 400 kg per cum, coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork, spreading the concrete with shovels, rakes, compacted using needle and plate vibrators and finished in continuous operation including curing of concrete slabs for 28- days and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD. Culverts approaches

1.5

6277

9417

... More
Bailing out water from the pipe line trenches with oil engine driven pump sets, including hire charges, fuel charges and wages for Driver and Helper.

240

83

20069

... More
Enagaging Plumber and Man mazdoor as per S.S Compelete for Shifitnig taps, Etc.,,, Plumber

7

937

6563

... More
Man mazdoor

10

700

7000

... More
Carting away the surplus excavated earth from the work site with a lead of 3 km beyond initial lead including loading, unloading and conveyance but excluding stacking charges etc., complete - 1 Cum.

106.22

144

15363

... More
Provision for Seignorage Charges

-

-

9354

... More
Provision for NAC @ 0.10%

-

-

587

... More
Provision for GST @ 18%

-

-

105782

... More
Provision for TPQA @ 0.749 %

-

-

4327

... More
Unforeseen item

-

-

2216

... More
TOTAL

-

-

700000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.