Municipal Corporation Tender
... More
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Municipal Corporation Tender
Solid Waste Management
Housekeeping Services
Opening Date23 Feb 2024
Closing Date28 Feb 2024
Tender Amount₹ 2,58,774
Costs
EMD
₹ 2,600Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
726079Tender No
Rc.E6-101859/2024Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://vijayawada.cdma.ap.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Cutting of C.C. Road surface including stacking of excavated
materials for lying of pipe lines as per the ditections of the departmental authorities
1.2
6066
5055.47
... More
Providing black rubber paint to MS flanges tees etc., including cost
of redcxide and paint and all labour charges etc.
1
4500
4500
... More
Labour engauged for flange welding charges including cost and
conveyance, labour charges etc complete as directed by the departmental authorities.
18
2790
155
... More
Laying, jointing of GI pipe and its specials including labour charges etc as directed by the departmental authorities
80
5669
70.87
... More
Earth work excavation of strucures as per drawing and technical
specifications Clauses 305.1 including setting out, construction of
shoring and bracing, removal of stumps and other deleterious
material and disposal upto a lead of 50m. Dressing of sides and
bottom and backfilling in trenches with excavated suitable material
as per Technical Specification 305 MORD / 304 MORTH
48
15030
313.13
... More
Supply and Delivery of Quarry Dust from approved quarry including cost and conveyance of all materials labour charges, spreading, sectioning, ramming, watering etc complete as per SS.
24
27705
1154.4
... More
Providing concrete for plain concrete (M20 Design mix) using 343
Kgs Cement 40mm,20 mm,lOmm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and
compacted by vibration including curing for 14 days complete as
per drawings and technical specifications of MORTH
24
140729
5863.71
... More
Supply & Delivery of bolts & nuts washers including cost and
conveyance of all materials etc, complete
15
2079
138.61
... More
Supply & Delivery of 6mm thick rubber packings including cost and conveyance of all materials etc, complete
15
1738
115.88
... More
Labor charges for pipe cutting charges including all labour charges etc complete excluding cost of pipes as directed by the departmental authorities.
7
665
95
... More
Providing Interconnections from existing pipe line to newly laid pipe line including all labour charges etc., complete
1
3500
3500
... More
Labor charges for pipe welding charges including welding meachine, welding rods and electricity board charges incuding all
5
775
155
... More
Conveyance of excavated earth with an average lead of 2 Km
including loading, unloading, spreading and stocking etc. Complete
as per SS. SoR P.no 350
49.2
2918
59.31
Evaluation Notes How It Works ?