Municipal Corporation Tender

... More
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Municipal Corporation Tender

Works
Solid Waste Management
Housekeeping Services
Opening Date23 Feb 2024
Closing Date28 Feb 2024
Tender Amount₹ 2,58,774 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cutting of C.C. Road surface including stacking of excavated materials for lying of pipe lines as per the ditections of the departmental authorities

1.2

6066

5055.47

... More
Providing black rubber paint to MS flanges tees etc., including cost of redcxide and paint and all labour charges etc.

1

4500

4500

... More
Labour engauged for flange welding charges including cost and conveyance, labour charges etc complete as directed by the departmental authorities.

18

2790

155

... More
Laying, jointing of GI pipe and its specials including labour charges etc as directed by the departmental authorities

80

5669

70.87

... More
Earth work excavation of strucures as per drawing and technical specifications Clauses 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50m. Dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH

48

15030

313.13

... More
Supply and Delivery of Quarry Dust from approved quarry including cost and conveyance of all materials labour charges, spreading, sectioning, ramming, watering etc complete as per SS.

24

27705

1154.4

... More
Providing concrete for plain concrete (M20 Design mix) using 343 Kgs Cement 40mm,20 mm,lOmm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications of MORTH

24

140729

5863.71

... More
Supply & Delivery of bolts & nuts washers including cost and conveyance of all materials etc, complete

15

2079

138.61

... More
Supply & Delivery of 6mm thick rubber packings including cost and conveyance of all materials etc, complete

15

1738

115.88

... More
Labor charges for pipe cutting charges including all labour charges etc complete excluding cost of pipes as directed by the departmental authorities.

7

665

95

... More
Providing Interconnections from existing pipe line to newly laid pipe line including all labour charges etc., complete

1

3500

3500

... More
Labor charges for pipe welding charges including welding meachine, welding rods and electricity board charges incuding all

5

775

155

... More
Conveyance of excavated earth with an average lead of 2 Km including loading, unloading, spreading and stocking etc. Complete as per SS. SoR P.no 350

49.2

2918

59.31



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.