Municipal Corporation Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Municipal Corporation Tender
Civil And Construction
Pipe Line Project
Water Storage And Supply
Opening Date12 Jul 2024
Closing Date19 Jul 2024
Tender Amount₹ 6,54,542
Costs
EMD
₹ 6,545Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
742817Bid Award Id
ViewTender No
ET NO.06/2024-25, Item No.04Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://http://www.gunturcorporation.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
OD 110mm dia TEE
6
3518
586.25
OD 160mm dia TEE
2
4195
2097.33
OD 200mm dia TEE
1
3916
3916.31
OD 110mm dia Bend
2
1202
601.02
OD 160x180mm dia Reducer
2
2824
1412.23
OD 180x200mm dia Reducer
1
1825
1824.66
100mm Dia C.I.D Joints
12
11517
959.72
150mm Dia C.I.D Joints
6
7384
1230.68
200mm Dia C.I.D Joints
4
7081
1770.33
100mm dia DI Double Flanged Sluice Valve PN-1.60
3
46107
15368.95
Supply and delivery of Bolts and Nuts with double washers including taxes and conveyance etc., complete. (1/2 " to 1 ")
60
8317
138.61
Supply and delivery of Rubber Packing including taxes and conveyance etc., complete (3 mm / 6 mm thick).
30
3477
115.89
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH (RBR-STCL-5)
4.5
13124
2916.43
Earthwork excavation in Ordinary soil by Mechanical Means upto 3 m depth for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH (RBR-FNDN-1(B)) - 1 Cum
744
95284
128.07
Filling with dust for trenches as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH (revised RBR-FNDN-2.i)
139.5
93937
673.38
Laying and jointing of H.D.P.E Pipes by butt fusion welding as per IS:7634–part-II/1975 as amended from time to time to the alignment and gradient and testing the pipeline to the required pressure - 1 Rmt (Public Health Items, P.5)
620
47374
76.41
Labour charges for Interconnection of HDPE Pipe line including cost of all type of labour charges for lowering laying fixing with supplied materials,Gas cutting,welding etc; and finishing of item in good condition to site.complete to Work
4
35400
8850
Provision for Seigniorage charges
-
12555
-
Provision for NAC @ 0.10%
-
667
-
GST @ 18%
-
120198
-
Provision for TPQA @ 0.749 %
-
4903
-
Unforeseen item
-
7135
-
TOTAL
-
800000
-