Municipal Administration Department Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Municipal Administration Department Tender
Civil And Construction
Solid Waste Management
Construction Material
Opening Date13 Apr 2022
Closing Date28 Apr 2022
Tender Amount₹ 5,37,248
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
495736Bid Award Id
ViewTender No
IFB NO. 09/2022-23Tender Authority
Municipal Administration Department ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Construction and infrastructure required for Material Recovery Facility Center (MRFC);Suply and placing of the Design Mix M-20 concrete corresponding to IS 456 using mixer with 20 mm size graded machine crushed hard granite metal (coarse aggregate ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seiginorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS NO.402) with minimum cement content as per IS Code from standard suppliers approved by the departent including pumping , centering, shuttering, Laying concrete, vibrating, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work. For foundations, pedastals and plinth beem etc., complete. For Foundation
4.13
-
38326
... More
Construction and infrastructure required for Material Recovery Facility Center (MRFC);Suply and placing of the Design Mix M-20 concrete corresponding to IS 456 using mixer with 20 mm size graded machine crushed hard granite metal (coarse aggregate ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seiginorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS NO.402) with minimum cement content as per IS Code from standard suppliers approved by the departent including pumping , centering, shuttering, Laying concrete, vibrating, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work. For foundations, pedastals and plinth beem etc., complete. For Pedastals
0.88
-
8675
... More
Construction and infrastructure required for Material Recovery Facility Center (MRFC);Suply and placing of the Design Mix M-20 concrete corresponding to IS 456 using mixer with 20 mm size graded machine crushed hard granite metal (coarse aggregate ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seiginorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS NO.402) with minimum cement content as per IS Code from standard suppliers approved by the departent including pumping , centering, shuttering, Laying concrete, vibrating, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work. For foundations, pedastals and plinth beem etc., complete. For Plinth beam
5.59
-
66272
... More
Construction and infrastructure required for Material Recovery Facility Center (MRFC);Suply and placing of the Design Mix M-20 concrete corresponding to IS 456 using mixer with 20 mm size graded machine crushed hard granite metal (coarse aggregate ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seiginorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS NO.402) with minimum cement content as per IS Code from standard suppliers approved by the departent including pumping , centering, shuttering, Laying concrete, vibrating, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work. For foundations, pedastals and plinth beem etc., complete. For Columns
2.94
-
36161
... More
Construction and infrastructure required for Material Recovery Facility Center (MRFC);Providing High yield strength Deformed( HYSD)/Thermo Mechanically treated TMT Mild steel (MS) steel bars (Fe 415/Fe 500 grade as per IS 1786- 1979) of diufferent diameters for RCC works including labour charges for straigthtening ,cutting, be3nding of required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with bending wire of 18 SWG , forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs,spacer bars including cost and labour charges such as cutting, bending, placing in position, tying including sales and otrher taxies on all materials etc., complete for finished item of work in all floors (APSS NO.126)
1266
-
103749
... More
Construction and infrastructure required for Material Recovery Facility Center (MRFC);Brick work in CM (1:6) using 2nd class local bricks including curing etc., complete
26.24
-
169321
... More
Construction and infrastructure required for Material Recovery Facility Center (MRFC);Plastering in CM (1:3) 12 mm thick including curing etc., complete
232.5
-
38293
... More
Construction and infrastructure required for Material Recovery Facility Center (MRFC);White washing two coats with whiting of approved give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials and incidental such as scaffolding, lift charges etc., complete for finished item of work.
232.5
-
11148
... More
Construction and infrastructure required for Material Recovery Facility Center (MRFC);Colour washing two coats with whiting of approved give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials and incidental such as scaffolding, lift charges etc., complete for finished item of work.
232.5
-
16724
... More
Construction and infrastructure required for Material Recovery Facility Center (MRFC);Providing and fixing Entrance Gate using channels and M S flats (structural steel) including cost and conveyance of materials labour charges for fabrication and fixing etc., complete- 1 Kg (Weight of gate @ 30 Kgs/Sqm) (1.80+1.50)/2 * 4.50 = 7.45 Sqm)
233.5
-
25617
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements