Municipal Administration Department Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Municipal Administration Department Tender
Civil And Construction
Civil Works Others
Opening Date19 Dec 2024
Closing Date2 Jan 2025
Tender Amount₹ 6,56,208
Costs
EMD
₹ 6,562Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
775286Tender No
19/2024-25/E1Tender Authority
Municipal Administration Department ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Supply and fixing of 6 mm thick glass including labour charges and Fitting Charges etc., complete
82.45
920
75854
... More
GATE AND COMPOUND WALL
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH RBR-FNDN-1 1(A) & SOR -2013-14 CL-2-II.
0.72
158
114
... More
Collection and supply of filling Sand including cost and conveyance at site of work and labour charges for spreading, watering and ramming etc., complete. (Clause 305 -89 Morth and 304 morth) (RBR - F NDN - 2).
0.14
627
90
... More
Brick masonary in CM (1:6), using Fly ash bricks .including cost and conveyance of all materials and labour charges, watering, curing etc., complete as per SS
3.98
5675
22561
... More
Plastering in CM (1:3) Prop, 12mm thick using OPC grade cement including cost and conveyance of all materials, labour charges, curing complete etc.
29.03
143
4180
... More
Supplying,fixing of Gate incl.cost and Conveyance of all material and labour Charges etc.,Complete.
410
82
33817
... More
PIPE LINE
Earthwork in excavation for pipe line trenches a as per drawing and technical specification clause 305.1 including setting out construction of shoring and bracing. Removed of stumps and other deleterios material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per technical specification 305 MORD/304 MORTH ( ordinary soil using manual means)
39
158
6194
... More
Manufacturing and Supply and delivery of Unplasticised PVCs pipes for potable water supplies conforming to IS:4985/2000(third revision) with bell ends (socket) as per specification in light Grey/Natural Lvory Grey/Any other Color (except White) inclusive of transporation to the sub -divisional stores anywhere in AP including Excise duty and Sales Tax etc. 110 mm Dia PVC pipes 6kg/cm2.
110 mm Dia PVC pipes 6kg/cm2
42
291
12222
... More
Manufacturing and Supply and delivery of Unplasticised PVCs pipes for potable water supplies conforming to IS:4985/2000(third revision) with bell ends (socket) as per specification in light Grey/Natural Lvory Grey/Any other Color (except White) inclusive of transporation to the sub -divisional stores anywhere in AP including Excise duty and Sales Tax etc. 110 mm Dia PVC pipes 6kg/cm2.
160 mm Dia PVC pipes 6kg/cm2
96
619
59501
... More
Lowering, Laying, Jointing and testing to hydralic test pressure including cost of water with minumum water lead of 50m for UPVC pressure pipes in ready made trenches true to alignment and gradient including all sundries but excluding cost & conveyance of pipes from source of supply and jointing materials as per BIS No.7634- Part III - 1975 150 mm Dia PVC pipes 6kg/cm2
96
19
1902
... More
Collection and supply of filling sand including cost and conveyance at site of work and labour charges for spreading , watering and ramming etc.., complete ( clause 305-89 MORD and 304 MORTH)(RBR-F NDN-2).
11.52
627
7233
... More
Supply and delivery of 150 mm dia PVC bend 6kg/cm2.
5
1050
5250
... More
Supply and delivery of 110 mmx150mm Tee - PVC Pipe fittings 6kg/cm2.
7
780
5460
... More
Supply and delivery of 150 mm dia Pvc End caps 6kg/cm2.
1
200
200
... More
WATER HARVESTING PIT
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH RBR-FNDN-1 1(A) & SOR -2013-14 CL-2-II
15.63
258
4032
... More
Supply of Aggregates at site including transportation etc., complete.
40 mm HBG metal
3.13
1092
3414
... More
Supply of Aggregates at site including transportation etc., complete.
40mm HBG metal
2.5
1092
2731
... More
Supply of Aggregates at site including transportation etc., complete.
20mm HBG metal
3.13
1492
4664
... More
Supply of Aggregates at site including transportation etc., complete.
12mm HBG metal
3.13
1224
3826
... More
Filling with available Aggregates into pit etc., complete.
40 mm HBG metal
3.13
22
70
... More
Filling with available Aggregates into pit etc., complete.
40mm HBG metal
2.5
22
56
... More
Filling with available Aggregates into pit etc., complete.
20mm HBG metal
3.13
22
70
... More
Filling with available Aggregates into pit etc., complete.
12mm HBG metal
3.13
22
70
... More
Collection and supply of filling Sand including cost and conveyance at site of work and labour charges for spreading, watering and ramming etc., complete. (Clause 305 -89 Morth and 304 morth) (RBR - F NDN - 2)
3.13
627
1962
... More
Brick masonary in CM (1:6), using Fly ash bricks .including cost and conveyance of all materials and labour charges, watering, curing etc., complete as per SS
1.25
5675
7095
... More
Plastering in CM (1:3) Prop, 12mm thick using OPC grade cement including cost and conveyance of all materials, labour charges, curing complete etc.
8.3
143
1195
... More
Supplying,fixing of Iron Grill in harvesting pit,ladder incl.cost and Conveyance of all material and labour Charges etc.,Complete.
215
82
17733
... More
1. Add VAT @ 5%
-
-
-
... More
2. Labour Cess @ 1%
-
-
-
... More
3. User Charges @ 1%
-
-
-
... More
4. NAC @ 0.10%
-
-
-
... More
5. Add Seigniorage charges
-
-
-
... More
Note : The contractor should engage Technical personel during execution of work failing which necessary amount will be deducted from the contractor bill.
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements