Municipal Administration Department Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Municipal Administration Department Tender

Works
Civil And Construction
Drainage Work
Opening Date16 Mar 2024
Closing Date26 Mar 2024
Tender Amount₹ 2,69,962 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Vibrated P.C.C.1:2:4 (Nominal mix) MORTH 12.8 B using 20 mm graded stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. and as directed by the depermental engineers in charge. RBR-FNDN-4G-V-i-( without form work) for 300mm drain bed

14.16

70681

4991.66

... More
Vibrated P.C.C.1:2:4 (Nominal mix) MORTH 12.8 B using 20 mm graded stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. and as directed by the depermental engineers in charge. RBR-FNDN-4G-V-i-(with form work) For 300mm drain side walls

26.55

137650

5184.57

... More
Vibrated Plain Cement concrete (1:4:8) using 40 mm metal with concrete mixture.All work upto plinth level.-BLD-CSTN-2-5 without formwork for Culvert Bed

1.26

5379

4269.79

... More
Vibrated plain cement concrete (1:3:6) using 20 mm graded stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. and as directed by the depermental engineers in charge. RBR-FNDN-4G-I-i ((WITH FORM WORK)) For side walls

2.7

13415

4977.99

... More
Vibrated plain cement concrete (1:3:6) using 20 mm graded stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. and as directed by the depermental engineers in charge. RBR-FNDN-4G-I-i ((WITHOUT FORM WORK)) For Quenet

0.13

627

4793.04

... More
Plastering with CM (1:3), 12 mm thick including cost and conveyance of all materials and labour charges etc., (page No.680)-BLD-CSTN-6-1-amendment For Quenet

1.75

673

384.96

... More
Vibrated reinforced cement concrete M 30 using 20 mm graded HBG including cost and conveyance of all materials land labour charges for centering, machine mixing, laying, vibrating and curing etc. including all other incidental charges of all T&P etc. for finished item of work as per MoRTH apecifications 1500, 1700, 2100 and 2702 and as directed by the depermental engineers in charge. RBR - FNDN 4 / g

1.13

6219

5484.99

... More
Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded - BLD - CSTN - 2 / 19. - Fe 415

136.08

12440

91.42



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.