To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Municipal Administration Department Tender
Civil And Construction
Drainage Work
Opening Date29 Nov 2022
Closing Date5 Dec 2022
Tender Amount₹ 78,09,681
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
569444Tender No
Roc No 16/2019-E1Tender Authority
Municipal Administration Department ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of CC Drain;Earthwork in excavation by Manual means 30% for Culvert & Drains as per drawing and technical specifications Clause 305.1 including setting out,'construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable materlal as per Technical Specification 305 MORD / 304 MORTH complete as per Standard Specifications and as directed by the departmental officer incharge of the work
756.9
-
193266.85
... More
Construction of CC Drain;Filling Stone Dust in foundation trenches of drain and culvert bed as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH. This rate including cost of all materials all labour charges watering ramming etc., complete as per SS and as directed by the departmental officer incharge of. But excluding Seigniorage Charges.
323
-
169329.52
... More
Construction of CC Drain;Providing PCC (1:4:8) mix using 40mm size HBG metal including cost and conveyance of all materials and labour charges for mixing machine mix, centering, vaibrating etc', complete as SS and as per directed by the departmental officer incharge of the work. But excluding seigniorage charges for culvert and drain bed concrete'
407
-
1530026.96
... More
Construction of CC Drain;Laying VCC M20 using 20 mm graded HBG metal.The rate including cost and conveyance of all material, labour charges for mixing, laying, curing, centering viberation etc., Complete as per SS and as directed by the deparmental Officer incharge of the work. but excluding seigniorage charges for drain and bed concreted
245
-
1205037.4
... More
Construction of CC Drain;Laying VCC M20 using 20 mm graded HBG metal.The rate including cost and conveyance of all material, labour charges for mixing, laying, curing, centering viberation etc., Complete as per SS and as directed by the deparmental Officer incharge of the work. but excluding seigniorage charges for drain concrete and side walls
403.5
-
2095427.96
... More
Construction of CC Drain;R.C.C. grade M 30 Design mix using 20 mm graded HBG metal.The rate including cost and conveyance of all material, labour charges for mixing, laying, curring centering viberation etc.Complete as per SS and as directed by thedeparmental officer incharge of the work, but excluding seigniorage charges for culver bed concrete
46
-
232554.84
... More
Construction of CC Drain;R.C.C. grade M 30 Design mix using 20 mm graded HBG metal.The rate including cost and conveyance of all material, labour charges for mixing, laying, curring centering viberation etc.Complete as per SS and as directed by thedeparmental officer incharge of the work, but excluding seigniorage charges for culverside walls. 2=0.25
33
-
182992.92
... More
Construction of CC Drain;R.C.C. grade M 30 Design mix using 20 mm graded HBG metal.The rate including cost and conveyance of all material, labour charges for mixing, laying, curring centering viberation etc.Complete as per SS and as directed by thedeparmental officer incharge of the work, but excluding seigniorage charges for culver slab
25
-
138630.75
... More
Construction of CC Drain;Supplying,fitting and placing HYSD bar reinforcement (FE 500) grade as drawings and technical specification for bars below 36mm dia including over laps and wastage, where they are not welded. This rate includes cost and conveyance of steel and binding wire to work site, labour charges for cutting bending, fabrication of steel etc., complete as per 55 and as directed by the Departmental technical hiSher authorities.
7280
-
718026.4
... More
Construction of CC Drain;Carting the excavated Earth to a distance of 2 K.M lead by cart on M.R. including loading, unloading and stackinB etc. etc., complete as directed by departmental officer in charge of the work.
2018.4
-
115573.58
... More
Construction of CC Drain;Granular sub-base/base/surface course with Grande-II materials (Table 400.2) Construction of granular sub-base by providing local material spreading in uniform layers with on prepared surface, mixing by mix in place method at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 GRADE -2 Culvert Approches and as directed by the departmental officer incharge work but excluding seigniorage charges.
120
-
130315.2
... More
Construction of CC Drain;Restreation of CC pavement with M 30 Plain Cement concrete design mix by using 20 mm graded metal with machine mixing including cost and conveyance of all materials and labour charges etc., Culvert Approches
120
-
668232