Municipal Administration And Urban Development Department Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Municipal Administration And Urban Development Department Tender

Works
Civil And Construction
Eprocure
Opening Date24 Dec 2018
Closing Date29 Jan 2019
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Providing Wsd, Hsc, Amr Wm And Scada With Oandm For Period Of 7 Years Including Dlp For 2 Years In Guntur Dist

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cutting open Water Bound Macadam Road surface including stacking of excavated materials for pipe line trench work including all labor charges and as per Technical Specification

2050

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH for pipe line trenches

10980

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH for foundations of cc drains and culverts,pipeline trenches upto 3.00m depth RBR-FNDN-1 I-B

16470

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH for foundations of cc drains and culverts,pipeline trenches upto 3.00m depth RBR-FNDN-1 II-A

10980

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH for foundations of cc drains and culverts,pipeline trenches upto 3.00m depth RBR-FNDN-1 II-B

16470

-

-

... More
Providing bedding with sand for pipelines trencehs as per specification and drawing including cost and conveyance of materials to site with all leads, lifts including watering, tamping, ramming, labour charges, all other incidental and operational charges etc., complete as per detailed specification and directed by the Engineer - in - Charge

4290

-

-

... More
Supply and Delivery of HDPE PE-100 6 KSC Pipes conforming to IS 4984 - 1995 including cost and transportation to site of work and stacking as per standards including all taxes and duties but excluding GST and as per the Technical Specification

-

-

-

... More
110 OD HDPE Pipes

25534

-

-

... More
160 OD HDPE Pipes

15420.76

-

-

... More
200 OD HDPE Pipes

9429.38

-

-

... More
250 OD HDPE Pipes

5916.68

-

-

... More
315 OD HDPE Pipes

3108.03

-

-

... More
355 OD HDPE Pipes

988.23

-

-

... More
Lowering, laying and jointing of HDPE pipes and jointing by butt fusion welding as per IS 7634-part-II/1975 as amended from time to time to the alignment and gradient and testing the pipeline to required pressure etc.complete

-

-

-

... More
110mm dia.

25534

-

-

... More
160mm dia.

15420.76

-

-

... More
200mm dia.

9429.38

-

-

... More
250mm dia.

5916.68

-

-

... More
315 mm dia.

3108.03

-

-

... More
355 mm dia.

988.23

-

-

... More
Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking excluding all taxes and duties etc.complete

-

-

-

... More
a) Pipe ends - long neck

-

-

-

... More
110mm dia.

116

-

-

... More
160mm dia.

106

-

-

... More
160 mm dia for Air TEEs

92

-

-

... More
160 mm dia for bulk flow meter

1

-

-

... More
200mm dia.

50

-

-

... More
200 mm dia for Air TEEs

48

-

-

... More
250mm dia.

52

-

-

... More
250 mm dia for Air TEEs

42

-

-

... More
250 mm dia for bulk flow meter

1

-

-

... More
315 mm dia.

40

-

-

... More
315 mm dia for Air TEEs

20

-

-

... More
315 mm dia for bulk flow meter

1

-

-

... More
355 mm dia

8

-

-

... More
355 mm dia for Air TEEs

1

-

-

... More
355 mm dia for bulk flow meter

18

-

-

... More
b) MS Flanges

-

-

-

... More
110mm dia.

116

-

-

... More
160mm dia.

106

-

-

... More
160 mm dia for Air TEEs

92

-

-

... More
160 mm dia for bulk flow meter

1

-

-

... More
200mm dia.

50

-

-

... More
200 mm dia for Air TEEs

58

-

-

... More
250mm dia.

52

-

-

... More
250 mm dia for Air TEEs

42

-

-

... More
250 mm dia for bulk flow meter

1

-

-

... More
315 mm dia.

40

-

-

... More
315 mm dia for Air TEEs

20

-

-

... More
315 mm dia for bulk flow meter

1

-

-

... More
355 mm dia

8

-

-

... More
355 mm dia for Air TEEs

4

-

-

... More
355 mm dia for bulk flow meter

18

-

-

... More
c) End Caps

-

-

-

... More
110mm dia.

12

-

-

... More
160mm dia.

8

-

-

... More
200mm dia.

4

-

-

... More
d) Reducers

-

-

-

... More
OD 110mm x 125mm

60

-

-

... More
OD 125mm x 140mm

60

-

-

... More
OD 140mm x 160mm

60

-

-

... More
OD 160mm x 180mm

18

-

-

... More
OD 180mm x 200mm

18

-

-

... More
OD 200mm x 225mm

18

-

-

... More
OD 225mm x 250mm

18

-

-

... More
250x280 mm dia

18

-

-

... More
280x315 mm dia

18

-

-

... More
315x355 mm dia

6

-

-

... More
e) TEES

-

-

-

... More
110mm dia.

85

-

-

... More
160mm dia.

51

-

-

... More
200mm dia.

33

-

-

... More
250mm dia.

23

-

-

... More
315 mm dia.

12

-

-

... More
355 mm dia

4

-

-

... More
F)Bends

-

-

-

... More
110mm dia.

55

-

-

... More
160mm dia.

33

-

-

... More
200mm dia.

20

-

-

... More
250mm dia.

12

-

-

... More
315 mm dia.

6

-

-

... More
355 mm dia

2

-

-

... More
Supply and delivery of DI Pipes and fittings (Specials) confirming to specification No.I.S.No. 7181/1986, 5531/1988, 3950/1979 excluding GST and other duties including transportation and conveyance to work spot and stacking etc., complete as per S.S and as directed by the departmental authorities.

-

-

-

... More
100X2.00m on 110 dia mains for scours

52

-

-

... More
100X2.00m on 160 dia mains for scours

30

-

-

... More
100x1.00m long DF pipes for sluice valves

116

-

-

... More
150X2.00m on 200 mm dia mains for scours

20

-

-

... More
150X2.00m on 250 mm dia mains for scours

4

-

-

... More
150x1.00m long DF pipes for sluice valves

74

-

-

... More
150x1.00m long DF pipes for pressure regulating valves

36

-

-

... More
200x1.00m long DF pipes for sluice valves

50

-

-

... More
250x1.00m long DF pipes for sluice valves

52

-

-

... More
300x1.00m long DF pipes for sluice valves

40

-

-

... More
300x1.00m long DF pipes for sluice valves

1

-

-

... More
350x1.00m long DF pipes forbulk flow meter

8

-

-

... More
350x1.00m long DF pipes for bulk flow meter

18

-

-

... More
OTHER DI FITTINGS

7300

-

-

... More
Supply and delivery of PN 1.6 D.I D/F "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) confirming to IS 14846 latest amendment and Material of Construction (as per latest codes) as per Technical Specification of the Tender Document including cost and conveyance and stacking as per standards and as directed by Engineer-in-charge

-

-

-

... More
100 mm distrubution

58

-

-

... More
150mm dia for distrubution

37

-

-

... More
200mm dia for distrubution

25

-

-

... More
250mm dia for distrubution

26

-

-

... More
300mm dia for distrubution

20

-

-

... More
350mm dia for distrubution

4

-

-

... More
for scour

-

-

-

... More
100mm dia on 110 mm dia mains

26

-

-

... More
100mm dia on 160 mm dia mains

15

-

-

... More
150 mm dia on 200 mm dia lines

10

-

-

... More
150 mm dia on 250 mm dia lines

2

-

-

... More
Manufacture, supply and delivery of Single Chamber DI Air Valve with Body and cover in Ductile Iron of grade SG 400/12 or equivalent grade as per I.S.3896-part2-1985 and subsequent revisions. All internal parts such as float, shell etc., all cover bolts, of stainless steel, and Gaskets and seals of EPDM food grade quality Epoxy powder coating (EP-P) inside and outside colour blue. Drilled as per IS:1538. PN16

-

-

-

... More
80 mm dia on 110 mm pipe

77

-

-

... More
80 mm dia on 160 mm pipe

11

-

-

... More
80mm dia 200 mm pipe

13

-

-

... More
80mm dia 250 mm pipe

8

-

-

... More
80mm dia 315 mm pipe

9

-

-

... More
80mm dia 355 mm pipe

5

-

-

... More
Lowering, keeping in position and fixing DI sluice valves (with cap / with hand wheel & reflex valves) including all labor charges and incidental charges and as per Technical Specification

-

-

-

... More
100 mm distrubution

191

-

-

... More
150mm dia for distrubution

30

-

-

... More
200mm dia for distrubution

23

-

-

... More
250mm dia for distrubution

21

-

-

... More
300mm dia for distrubution

16

-

-

... More
350mm dia for distrubution

4

-

-

... More
for scour

-

-

-

... More
100mm dia on 110 mm and 160 mm dia mains

23

-

-

... More
150 mm dia on 200 and 250 mm dia lines

7

-

-

... More
200 mm dia on 315 and 355 mm lines

2

-

-

... More
Labour charges for fixing Kinetic Air Valves with isolating Sluice valves, Double Air valves/ Air Cushion valve excluding cost of jointing materials such as bolts, nuts and rubber insertions etc., complete.

-

-

-

... More
80 mm dia on 150,250,315,355 mm pipes

108

-

-

... More
Lowering the C.I. Pipes, D.I. Pipes of all classes and fittings with flanged ends carefully into the trenches and laying them true to alignment and gradient including all sundries, but excluding conveyance from source of supply as per BIS No.3114/94.

-

-

-

... More
DIDF pipes for scours

-

-

-

... More
100 mm

321

-

-

... More
150 mm dia

216

-

-

... More
200 mm dia

79

-

-

... More
250 mm dia

73

-

-

... More
300 mm dia

50

-

-

... More
350 mm dia

28

-

-

... More
Jointing CI pipes, fittings and valves with flanged ends including cost of jointing materials such as bolts, rubber insertion, white lead including filling with water, with lead up to 500 meters and testing to required pressure complete and as per Technical Specification

-

-

-

... More
80 mm dia

108

-

-

... More
100 mm dia

441

-

-

... More
150 mm dia

502

-

-

... More
200 mm dia

210

-

-

... More
250 mm dia

188

-

-

... More
300 mm dia

138

-

-

... More
350 mm dia

28

-

-

... More
Construction of sluice and scour Valve Chamber as per type design drawing with CC including, plastering, RCC cover slabs etc. including cost and conveyance of all material and all labour charges etc. complete as per S.S for finished item of work

-

-

-

... More
100 mm distrubution

58

-

-

... More
150mm dia for distrubution

37

-

-

... More
200mm dia fordistrubution

25

-

-

... More
250mm dia for distrubution

26

-

-

... More
300mm dia for distrubution

20

-

-

... More
300mm dia for bulk flow meter

1

-

-

... More
350mm dia for distrubution

4

-

-

... More
350mm dia for bulk flow meter

9

-

-

... More
400mm dia for distrubution

1

-

-

... More
for scour

-

-

-

... More
100mm dia on 110 mm dia mains

24

-

-

... More
100mm dia on 160 mm dia mains

15

-

-

... More
150 mm dia on 200 mm dia lines

10

-

-

... More
150 mm dia on 250 mm dia lines

2

-

-

... More
Construction of Air Valve Chamber as per type design drawing with RCC including, plastering, RCC cover slabs etc. including cost and conveyance of all material and all labour charges etc. complete as per S.S for finished item of work

-

-

-

... More
80 mm dia on 110 mm pipe

46

-

-

... More
80 mm dia on 160 mm pipe

29

-

-

... More
80mm dia 200 mm pipe

21

-

-

... More
80mm dia 315 mm pipe

10

-

-

... More
80mm dia 355 mm pipe

2

-

-

... More
Road Restoration

-

-

-

... More
Filling crushur stone dust in pipe line trenches as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH

1810

-

-

... More
BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix M-30 (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nomonal reinforcement for Road restoration.

1186

-

-

... More
Providing 15mm dia House Service Connection as per standard specification including the cost of the materials like Clamp Saddle,Ferrule Tapping Saddle confirming to I.S stadard manufactured from virgin resin of PE-80 , Compression Elbows, MDPE PE100 Pipe including lowering, laying and jointing including earth work excavation,UPVC Casing pipe with Two Calmps for drain crossings,Drilling of Holes for RR Masonary and CC Walls , Boring&Tunneling below CC &BT Roads ,saw cutting of groves in CC Roads and refilling the pipe line trench after laying the pipe line and including cost of 15mm dia meter of BIS standard etc complete as directed by departmental officer for finished item of work.

-

-

-

... More
Providing house service connections at house holds side in earthern roads (Minimum 4.0 Mts MDPE pipe)

614

-

-

... More
Providing house service connections at other side in earthern roads ((Minimum 7.0 Mts MDPE pipe)

614

-

-

... More
Providing house service connections at HH side in BT &CC roads (Minimum 7.0 Mts MDPE pipe)

1638

-

-

... More
Providing house service connections at other side in BT &CC roads (Minimum 4.0 Mts MDPE pipe)

1229

-

-

... More
AMR Ultrasonic / Electromagnetic Water Meters

-

-

-

... More
Supply, delivery, installing, satisfactory testing and commissioning of domestic Battery operated electronically compatible AMR Ultrasonic or AMR Electromagnetic Water Meters from 15 mm to 40 mmWater Meters having No moving parts in contact with water with body made up of brass or composite materials confirming to ISO along with manufacturing test certificate and Guarantee certificate with Battery life of min. 10 years with GSM /GPRS/ RF Technology for communication to server with PC Software via handheld reader or directly, including all material required for fixing, labour & giving satisfactory leak proof test etc Complete with poly-propylenemeter box. General Specifications: Meter should be battery operated with no moving parts, low pressure loss. Display: 8 digit LCD, Protection class IP 68 , Operating temperature 10 C to 55 C deg. , Accuracy up to +/- 2% and unaffected by Operating temperature , Pressure : PN 1.6 MPa, power supply : 3.1 to 3.7 VDC lithium battery with minimum life of more than 10 years. Flow Measurement Range 1 to 3000L/H, Warrantyrequired for10years. Memory built-in and should have storage for at least 12 months with daily / monthly accumulated totalised data with time and date should be available. It should be able to access memory of the meter through serial communication. The readings should be obtainable by either walkby or stationery pole with specific range or drive by on Android device. The acceptance / routine tests shall be either conducted by M/s. Fluid Control Research Institute, Palghat, Kerala or any of the Laboratories approved by the National Accreditation Board for calibration Laboratories (NABL) or installation at site etc. complete includingpoly-propylene box for keeping the meter. Including all charges excluding tax

4095

-

-

... More
Providing for Implementation of Environmental Management Plan in the estimate for Vinukonda Municipality

-

-

-

... More
I. Monitoring Costs : Construction Phase (Two years)

-

-

-

... More
Air Quality Monitoring (5 Monitoring station) once in a month for three seasons during the construction period at intake well, WTP, Sump, ELSR's, Raw/Clear Pipe Line & Distribution network

27

-

-

... More
Noise level (5 Monitoring station) once in a month for three seasons during the construction period at intake well, WTP, Sump, ELSR's, Raw/Clear Pipe Line & Distribution network

27

-

-

... More
Water Quality Monitoring surface / ground (5 Monitoring station) once in a month for three seasons during the construction period at intake well, WTP, Sump, ELSR's, Raw/Clear Pipe Line & Distribution network

39

-

-

... More
II. Monitoring Costs : Construction Phase (one years)

-

-

-

... More
Air Quality Monitoring (5 Monitoring station) once in a month for three seasons during the construction period at intake well, WTP, Sump, ELSR's, Raw/Clear Pipe Line & Distribution network

18

-

-

... More
Noise level (5 Monitoring station) once in a month for three seasons during the construction period at intake well, WTP, Sump, ELSR's, Raw/Clear Pipe Line & Distribution network

18

-

-

... More
Water Quality Monitoring surface / ground (5 Monitoring station) once in a month for three seasons during the construction period at intake well, WTP, Sump, ELSR's, Raw/Clear Pipe Line & Distribution network

26

-

-

... More
Compensatory plantation and three years maintenance (Compensatory afforestation ratio is 1:5).

90

-

-

... More
Cutting of trees

45

-

-

... More
Sprinkling of water once in a day for two years (excluding rainy days) 600 days

600

-

-

... More
Greenbelt development and maintenance in the surroundings / Buffer zone

1

-

-

... More
Health checkups and free medical distribution

1

-

-

... More
Awareness program/training

1

-

-

... More
Hiring for 2 No's Vechicles for 24 Months during ececution period including hire charges of vechicle, diesel, lubrication, driver charges, repairs and all incidental charges

48

-

-

... More
Supply, deliver and installation of bulk flow meter including consumer meters and other instruments in the deliveries for the DMAs of VINUKONDA

-

-

-

... More
Electromagnetic Flow Meters

-

-

-

... More
Supply, delivery, installation and integration of Electromagnetic flow meter with IP68 and as per ISO 9001:2008,meter tube should be SS304 material, CS flanges of PN16 rating liner - hard rubber/polyurethane with WRAS or NSF drinking water approval, electrodes - SS316, 2 measuring electrodes for measuring,1 ground elctrode,1 empty pipe detection, coil housing - SS304 fully welded construction for corrosion grade/painted steel with protective lacquering (corrosive protection, class up to C5-1) as per EN ISO-12944/carbon steel, IP68 protection, Accuracy +/- 0.5% of measured value inclusive of linearity, repeatability etc, grounding rings of SS316/304. Flow transmitter microprocessor based wall mounted, flow ranges of the meter (full flow range). The overall uncertainty of the calibration rig should be atleast three times better than the uncertainty of the full bore electromagnetic flow meter. The competent government authority such as FCRI/NABL must certify the test facility etc. The EMF must be integrated with local SCADA server and the reading shall be captured all times 24x7. The flowmeter values must be persistent and there is no loss of data. The meter shall have display panel for displaying the readings according. This item shall, including cost, conveyance, etc complete as directed by the departmental officers.

-

-

-

... More
Zone-I ( Appaiah Kunta , DMA Inlet 350 mm Ø )

1

-

-

... More
Zone-IIA ( Hanuman Nagar , DMA Inlet 350 mm Ø )

1

-

-

... More
Zone-IIB ( Naragaya PalIem , DMA Inlet 350 mm Ø )

1

-

-

... More
Zone-III ( Municipal Office , DMA Inlet 300 mm Ø )

2

-

-

... More
Zone-IVA ( Govt. Jr.Collage , DMA Inlet 300 mm Ø )

1

-

-

... More
Zone-IVB ( Govt. Jr.Collage , DMA Inlet 250 mm Ø )

1

-

-

... More
Zone-VA ( Indra Nagar Colony , DMA Inlet 300 mm Ø )

1

-

-

... More
Zone-VB ( NSP Colony , 200 KL , DMA Inlet 250 mm Ø )

1

-

-

... More
Zone-VC ( Naragaya Palem , DMA Inlet 350 mm Ø )

1

-

-

... More
Pressure Transmitter

-

-

-

... More
Supply, delivery , installation of pressure transmitter with a pressure range of up to 16 bar and 64 bar for appropriate usages. Output: 4 to 20 mA, permissible temperature: -20°C to +70°C, IP65 rated with local display. For This item shall, including cost, conveyance, etc complete as directed by the departmental officers.

20

-

-

... More
Supply, delivery , installation of Data Logger with solar powered , battery backup of 5 days including SIM charges for 7 years, transmission rate shall be every 10 minutes cycle that can be configurable from 2 minutes upto 8 hours as needed.This unit shall have additional battery pack to power up ( 5 days backup) for the instruments connected to this item . The data collected from the instruments such as the bulk flow meter , preassure sensors , chlorine etc must be transmitted to the central SCADA Servers via the restfull web services hosted by the servers in the requred data format.

20

-

-

... More
Construction of CC masonry chambers with a openable MS hatch, with lock and key arrangement, steps arrangement, for Electromagnetic Flow meters, Butterfly valves as per pipe sizes including cost of cement, sand, bricks and other required material, including painting and suitable painting material, including labour charges. , Excavation and including wages. Complete as directed by the departmental officer.

-

-

-

... More
250 mm

2

-

-

... More
300 mm

4

-

-

... More
350 mm

4

-

-

... More
Chlorine Analyzer

-

-

-

... More
Supply, installation , delivery and testing wall mounted ABS plastic enclosure based Online Chlorine Analyzer of Amphreometric or Potentiometric type. Specifications of Range: 0 to 5 mg/L free or total residual chlorine, Resolution 0.01 PPM, Accuracy: +/- 0.05 PPM or better, Cycle Time: 4 minutes, Inlet: Sample Temperature: 5 to 40 °C, operating Temperature: Range 5 to 60 °C. Local LCD Display to display the values. Output: 4-20 mA or 0-10 VDC to integrate into PLC if needed. PH Compensation must be Auto/Manual. All accessories that are required for the must be provided.This item shall include the cost of consumables for the defect liability period of 2 years.

1

-

-

... More
Turbidity Analyzer

-

-

-

... More
Supply, installation , delivery and testing of wall mounted Turbidity Analyzer make of HACH/ ABB/ Forbes Marshall with specifications of Range 0.00-500.0(NTU/FNU), Operating Temperature : 0 – 60 °C, Displayed Resolution : 0.01 (0.00-19.99), 0.1(20.0-500.0)NTU/FNU, Response Time : Initial response in 1 minute, 15 seconds for a full-scale step change Signal, Sample, Temperature : 0 to 50°C (32 to 122°F), Output 4-20mA to integrate into PLC if needed. Local LCD Display to display the values . This item includes the cost of consumables for the defect liability period of 2 years.

1

-

-

... More
Supply, delivery , installation of Data Logger with solar powered , battery backup of 5 days including SIM charges for 7 years, transmission rate shall be every 10 minutes cycle that can be configurable from 2 minutes upto 8 hours as needed.This unit shall have additional battery pack to power up ( 5 days backup) for the instruments connected to this item . The data collected from the instruments such as the bulk flow meter , preassure sensors , chlorine etc must be transmitted to the central SCADA Servers via the restfull web services hosted by the servers in the requred data format.

1

-

-

... More
Supply delivery and installation of Protection MS grills with lock and key for equipment, instrumentations where ever necessary. This item shall, including cost, conveyance, etc complete as directed by the departmental officers.

1

-

-

... More
Pressure Reducing Valves

-

-

-

... More
Supply , Delivery and installation of manually adjusted preassure reducing valves , accurate pressure ratings. Maximum Upstream Pressure : 20 bar ; Maximum Working Temperature : 80°C. These PRV must be installed at key inlets points of the service reservior.

-

-

-

... More
Zone-I ( Appaiah Kunta , DMA Inlet 350 mm Ø )

-

-

-

... More
100 mm

2

-

-

... More
150 mm

1

-

-

... More
200 mm

1

-

-

... More
Zone-IIA ( Hanuman Nagar , DMA Inlet 350 mm Ø )

-

-

-

... More
100 mm

2

-

-

... More
150 mm

1

-

-

... More
200 mm

1

-

-

... More
Zone-IIB ( Naragaya PalIem , DMA Inlet 350 mm Ø )

-

-

-

... More
100 mm

2

-

-

... More
150 mm

1

-

-

... More
200 mm

1

-

-

... More
Zone-III ( Municipal Office , DMA Inlet 300 mm Ø )

-

-

-

... More
100 mm

4

-

-

... More
150 mm

2

-

-

... More
200 mm

2

-

-

... More
Zone-IVA ( Govt. Jr.Collage , DMA Inlet 300 mm Ø )

-

-

-

... More
100 mm

2

-

-

... More
150 mm

1

-

-

... More
200 mm

1

-

-

... More
Zone-IVB ( Govt. Jr.Collage , DMA Inlet 250 mm Ø )

-

-

-

... More
100 mm

2

-

-

... More
150 mm

1

-

-

... More
200 mm

1

-

-

... More
Zone-VA ( Indra Nagar Colony , DMA Inlet 300 mm Ø )

-

-

-

... More
100 mm

2

-

-

... More
150 mm

1

-

-

... More
200 mm

1

-

-

... More
Zone-VB ( NSP Colony , 200 KL , DMA Inlet 250 mm Ø )

-

-

-

... More
100 mm

2

-

-

... More
150 mm

1

-

-

... More
200 mm

1

-

-

... More
Zone-VC ( Naragaya Palem , DMA Inlet 350 mm Ø )

-

-

-

... More
100 mm

2

-

-

... More
150 mm

1

-

-

... More
200 mm

1

-

-

... More
Handheld Devices

-

-

-

... More
Supply delivery and comissioning the Handheld Devices for meter reading and bill printing. The power back up of this item shall be for 24 hours , android based with on line and offline capabilities, portable credit/debit card machine reader integrated. The connectivity to the central server will be via rest full services with highest security standards , in json data format as directed by the departmental offer. The bill generation , collection shall reflect across the entire system and the acknoledgement of the receipt shall be sent by SMS to the consumer. SIM charges for 7 years shall be provided. This item shall include the cost of consumables for the defect liability period of 2 years.

2

-

-

... More
Control Centre

-

-

-

... More
Meter Intergations with server

1

-

-

... More
Supply, testing installation and commissioning of command control: Reputed / Branded Hardware servers (2 nos) with 8GB RAM and 1TB Hard Disk including for operating system server license CentOS/Lunix , Windows OS, key board mouse with 20" LED monitor, Routers, firewall, bill printer , as required for running the software and internet broad band connection with static IP for for 84 months . 2 nos desktop with windows operating system with 8GB RAM and 1TB Hardisk, key board mouse and 20" LED monitor , 3 Nos work station with 3 chairs for each work station , racks for servers , network wiring , power wiring , etc . This item shall, including cost, conveyance , warrenty for 2 years , complete as directed by the departmental officers.

1

-

-

... More
Supply, testing and commissioning of 55" LED monitor with Ethernet/HDMI/VGA/WIFI with waranty for 2 years

1

-

-

... More
Software shall have modules such as Consumer master , grievence , billing , reports , SMS integration , Access log module, online payment module , consumer logins , metering details , dash board , with authentication and authorisation module , issue tracker , accounting and finance module. The soft ware shall expose restfull web services for further/future integrations with other software. The database, web-server shall be open source, license free, portable with all internationally accepted security standards. Authorisation and user access control shall be implemented for the applications mentioned. The application/software shall provide Restful Web Service interface with JSON data format so that it can be integrated to other centralised software and the Android application. All the data received from the instruments and meters shall be stored in database for a period of 4 years and reports shall be retrieved on demand. The data shall be integrated to the SCADA server as directed by the deparmental officer.

1

-

-

... More
Printer - 3 in one on color printer with refillable ink bank

1

-

-

... More
Supply, Delivery and Installation of 1600VA UPS with solar panels, battery enclosures with doors along with racks, to provide 40 hours battery backup calculated at 50% load. The solar panels should to charge the battery to full capacity in 7 hours of sunshine. As per relevant specification amended time to time for single phase input with input circuit breakers provided protection, sine wave from with sealed battery, maintenance free, recharge time conform to standards. The Batteries shall be of VLRA Type. This item shall, including cost, conveyance, etc complete as directed by the departmental officers.

1

-

-

... More
OPEX -Operation & Maintance to be executed by concerened ULB's (VINUKONDA MUNICIPALITY)

-

-

-

... More
Personal required for ELSR sites/ Gravity Mains/ Pumping Mains

-

-

-

... More
fitters- Gravity Main(distrubition)(2 nos x12 monthsx5years)

120

-

-

... More
Personal required for operating Valves in distribution lines

-

-

-

... More
Valve Operator/Turn Cocks

120

-

-

... More
Helpers for Distribution

240

-

-

... More
Repairs to pumpsets & Water pipe lines ( for Five years )

-

-

-

... More
iv)Replacement of glands of sluice valves

10

-

-

... More
v) Replacements of balls of Air valves

10

-

-

... More
Provision towards purchase pipe jointing materials, etc

1

-

-

... More
Providing qualified Diploma with minimum 2 Years of experience in SCADA/Computers , flow meters and instruments maintainence etc including daily routine checks on HMI , Flowmeter , PLC at all locations around the project and also operate ( 2 techinican x 365 days x 7 years = 5124 days ) inc ESI, PF and other statutory levies as directed by the departmental officers

5110

-

-

... More
Service Charge for bill generations , collections and maintainence for 5065 consumers x 12 months x 7 years = 425460. This item includes cost of consumables .

425460

-

-

... More
CAP Bill no : 10.1 Providing of Distribution system for Zone - I, Zone-II, Zone-III, Zone-IV, Zone-V and Zone-VI for a Length of 40471.00 mts in Piduguralla Municipality including Road Restoration..

-

-

-

... More
Cutting open B.T. road surface (as well as asphalt concrete upto 75 mm thick) including water bound macadam including all labor charges and as per Technical Specification

5340

-

-

... More
Cutting open C.C. Road surface including stacking of excavated materials for pipe line trench work including all labor charges and as per Technical Specification

1484

-

-

... More
Cutting open Water Bound Macadam Road surface including stacking of excavated materials for pipe line trench work including all labor charges and as per Technical Specification

1626

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH for pipe line trenches - Manual Means.

10050

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH for pipe line trenches - Mechanical Means.

23450

-

-

... More
Providing bedding with sand for pipelines trencehs as per specification and drawing including cost and conveyance of materials to site with all leads, lifts including watering, tamping, ramming, labour charges, all other incidental and operational charges etc., complete as per detailed specification and directed by the Engineer - in - Charge

2667

-

-

... More
Supply and Delivery of HDPE PE-100 6 KSC Pipes conforming to IS 4984 - 1995 including cost and transportation to site of work and stacking as per standards including all taxes and duties but excluding GST and as per the Technical Specification

-

-

-

... More
110 OD HDPE Pipes

25921

-

-

... More
160 OD HDPE Pipes

8006

-

-

... More
200 OD HDPE Pipes

3235

-

-

... More
250 OD HDPE Pipes

1521

-

-

... More
315 OD HDPE Pipes

1269

-

-

... More
350 OD HDPE Pipes

444

-

-

... More
400 OD HDPE pipes

75

-

-

... More
Jointing CI pipes, fittings and valves with flanged ends including cost of jointing materials such as bolts, rubber insertion, white lead including filling with water, with lead up to 500 meters and testing to required pressure complete and as per Technical Specification

-

-

-

... More
80 mm Dia

71

-

-

... More
110 mm Dia

304

-

-

... More
150 mm Dia

78

-

-

... More
200 mm dia

48

-

-

... More
250 mm dia

32

-

-

... More
300mm dia

28

-

-

... More
350mm dia

13

-

-

... More
400mm dia

4

-

-

... More
Supply and Delivery of HDPE PE-100 6 KSC Pipes conforming to IS 4984 - 1995 including cost and transportation to site of work and stacking as per standards including all taxes and duties but excluding GST and as per the Technical Specification

-

-

-

... More
Pipe ends - long neck

-

-

-

... More
110mm dia.

176

-

-

... More
110 mm dia for Air TEEs

68

-

-

... More
160mm dia.

54

-

-

... More
160 mm dia for Air TEEs

24

-

-

... More
200mm dia.

24

-

-

... More
200 mm dia for Air TEEs

24

-

-

... More
250mm dia.

10

-

-

... More
250 mm dia for Air TEEs

10

-

-

... More
250 mm dia for bulk flow meter

1

-

-

... More
315mm OD

12

-

-

... More
315 mm dia for Air TEEs

10

-

-

... More
315 mm dia for bulk flow meter

6

-

-

... More
355mm OD

6

-

-

... More
355 mm dia for Air TEEs

6

-

-

... More
355 mm dia for bulk flow meter

4

-

-

... More
b) MS Flanges

-

-

-

... More
110mm dia.

176

-

-

... More
110 mm dia for Air TEEs

68

-

-

... More
160mm dia.

54

-

-

... More
160 mm dia for Air TEEs

24

-

-

... More
200mm dia.

24

-

-

... More
200 mm dia for Air TEEs

24

-

-

... More
250mm dia.

10

-

-

... More
250 mm dia for Air TEEs

10

-

-

... More
250 mm dia for bulk flow meter

1

-

-

... More
315 mm dia.

12

-

-

... More
315 mm dia for Air TEEs

10

-

-

... More
315 mm dia for bulk flow meter

6

-

-

... More
355 mm dia

6

-

-

... More
355 mm dia for Air TEEs

6

-

-

... More
355 mm dia for bulk flow meter

4

-

-

... More
400 mm dia

2

-

-

... More
400 mm dia for Air TEEs

1

-

-

... More
400 mm dia for bulk flow meter

2

-

-

... More
End Caps

-

-

-

... More
110mm dia.

13

-

-

... More
160mm dia.

6

-

-

... More
200mm dia.

6

-

-

... More
250mm dia.

1

-

-

... More
315mm OD

1

-

-

... More
355mm OD

1

-

-

... More
Reducers

-

-

-

... More
110X125 mm dia

40

-

-

... More
125x140 mm dia

40

-

-

... More
140x160 mm dia

40

-

-

... More
160x180 mm dia

22

-

-

... More
180x200 mm dia

22

-

-

... More
200x225 mm dia

16

-

-

... More
225x250 mm dia

16

-

-

... More
250x280 mm dia

16

-

-

... More
280x315 mm dia

15

-

-

... More
315x355 mm dia

7

-

-

... More
355x400 mm dia

2

-

-

-

-

-

... More
110mm dia.

107

-

-

... More
160mm dia.

35

-

-

... More
200mm dia.

16

-

-

... More
250mm dia.

9

-

-

... More
315mm OD

7

-

-

... More
355mm OD

3

-

-

... More
400mm OD

1

-

-

-

-

-

... More
110mm dia.

54

-

-

... More
160mm dia.

19

-

-

... More
200mm dia.

10

-

-

... More
250mm dia.

5

-

-

... More
315mm OD

6

-

-

... More
355mm OD

3

-

-

... More
400mm OD

2

-

-

... More
Lowering, Laying and jointing of HDPE pipes by butt fusion welding as per IS:7634 – part-II/1975 as amended from time to time true to the alignment and gradient and testing the pipeline to the required testing pressure and as per the Technical Specification.

-

-

-

... More
110mm dia.

25921

-

-

... More
160mm dia.

8006

-

-

... More
200mm dia.

3235

-

-

... More
250mm dia.

1521

-

-

... More
315mm OD

1269

-

-

... More
355mm OD

444

-

-

... More
400mm OD

75

-

-

... More
Supply and Delivery of Centrifugally Cast (Spun) Ductile Iron Fittings conforming to IS: 9523/2000 Zinc Coated Externally with Inside Mortar Lining (With Finishing as per class 13/Is 9523/2000) including Transportation, Taxes and Duties but excluding GST and as per Technical Specification

2921.4

-

-

... More
100X2.00m on 110 and 160 mm dia mains for scours

12

-

-

... More
100x1.00m long DF pipes for sluice valves

176

-

-

... More
150 mm dia x2.00m on 200 and 250 mm dia pipes for scours

1

-

-

... More
150x1.00m long DF pipes for sluice valves

54

-

-

... More
200 mm dia x2.00m on 315 and 355 mm dia pipes for scours

1

-

-

... More
200x1.00m long DF pipes for sluice valves

24

-

-

... More
250x1.00m long DF pipes for sluice valves

10

-

-

... More
300x1.00m long DF pipes for sluice valves

12

-

-

... More
300x1.00m long DF pipes for flow meter

6

-

-

... More
350x1.00m long DF pipes for sluice valves

6

-

-

... More
350x1.00m long DF pipes for flow meter

5

-

-

... More
400x1.00m long DF pipes for sluice valves

2

-

-

... More
400x1.00m long DF pipes for flow meters

2

-

-

... More
Supply and delivery of PN 1.6 D.I D/F "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) confirming to IS 14846 latest amendment and Material of Construction (as per latest codes) as per Technical Specification of the Tender Document including cost and conveyance and stacking as per standards and as directed by Engineer-in-charge

-

-

-

... More
100mm dia for distrubution

88

-

-

... More
150mm dia for distrubution

27

-

-

... More
200mm dia for distrubution

12

-

-

... More
250mm dia for distrubution

5

-

-

... More
300mm dia for distrubution

6

-

-

... More
350mm dia for distrubution

3

-

-

... More
400mm dia for distrubution for scour

1

-

-

... More
for scour

-

-

-

... More
100mm dia on 160 mm dia mains

12

-

-

... More
150 mm dia on 200 & 250 mm dia lines

1

-

-

... More
200 mm dia on 315 & 355 mm dia lines

1

-

-

... More
Manufacture, supply and delivery of Single Chamber DI Air Valve with Body and cover in Ductile Iron of grade SG 400/12 or equivalent grade as per I.S.3896-part2-1985 and subsequent revisions. All internal parts such as float, shell etc., all cover bolts, of stainless steel, and Gaskets and seals of EPDM food grade quality Epoxy powder coating (EP-P) inside and outside colour blue. Drilled as per IS:1538. PN16

-

-

-

... More
80 mm dia on 110 mm pipe

34

-

-

... More
80 mm dia on 160 mm pipe

12

-

-

... More
80mm dia 200 mm pipe

12

-

-

... More
80mm dia 250 mm pipe

5

-

-

... More
80mm dia 315 mm pipe

5

-

-

... More
80mm dia 355 mm pipe

3

-

-

... More
Labour charges for fixing Kinetic Air Valves with isolating Sluice valves, Double Air valves/ Air Cushion valve excluding cost of jointing materials such as bolts, nuts and rubber insertions etc., completeas directed by Engineer-in-charge

-

-

-

... More
100mm dia for distrubution

88

-

-

... More
150mm dia for distrubution

27

-

-

... More
200mm dia for distrubution

12

-

-

... More
250mm dia for distrubution

5

-

-

... More
300mm dia for distrubution

6

-

-

... More
300 mm dia for bulk flow meter

1

-

-

... More
350mm dia for distrubution

3

-

-

... More
350 mm dia for bulk flow meter

1

-

-

... More
400mm dia for distrubution

1

-

-

... More
400mm dia for bulk flow meter

1

-

-

... More
for scour

-

-

-

... More
100mm dia on 110 mm and 160mm dia mains

12

-

-

... More
150 mm dia on 200 mm dia lines

1

-

-

... More
150 mm dia on 250 mm dia lines

1

-

-

... More
Lowering, keeping in position and fixing DI sluice valves (with cap / with hand wheel & reflex valves) including all labor charges and incidental charges and as per Technical Specification

-

-

-

... More
80 mm dia on 150,250,315,355 mm pipes

71

-

-

... More
Construction of sluice and scour Valve Chamber as per type design drawing with RCC including, plastering, RCC cover slabs etc. including cost and conveyance of all material and all labour charges etc. complete as per S.S for finished item of work

-

-

-

... More
100mm dia for distrubution

88

-

-

... More
150mm dia for distrubution

27

-

-

... More
200mm dia for distrubution

12

-

-

... More
250mm dia for distrubution

5

-

-

... More
300mm dia for distrubution

6

-

-

... More
300 mm dia for bulk flow meter

1

-

-

... More
350mm dia for distrubution

3

-

-

... More
350 mm dia for bulk flow meter

1

-

-

... More
400mm dia for distrubution

1

-

-

... More
for scour

-

-

-

... More
100mm dia on 110 mm & 160mm dia mains

12

-

-

... More
Construction of Air Valve Chamber as per type design drawing with RCC including, plastering, RCC cover slabs etc. including cost and conveyance of all material and all labour charges etc. complete as per S.S for finished item of work

-

-

-

... More
80 mm dia on 110 mm pipe

34

-

-

... More
80 mm dia on 160 mm pipe

12

-

-

... More
80mm dia 200 mm pipe

12

-

-

... More
80mm dia 250 mm pipe

4

-

-

... More
80mm dia 315 mm pipe

5

-

-

... More
80mm dia 355 mm pipe

3

-

-

... More
Lowering the C.I. Pipes, D.I. Pipes of all classes and fittings with flanged ends carefully into the trenches and laying them true to alignment and gradient including all sundries, but excluding conveyance from source of supply as per BIS No.3114/94.

-

-

-

... More
100 mm

244.8

-

-

... More
150 mm

66

-

-

... More
200 mm

36

-

-

... More
250 mm

15

-

-

... More
300 mm

22

-

-

... More
350 mm

13.6

-

-

... More
400 mm

4

-

-

... More
Collection, Supply and filling of Stone dust / Quarry spall from approved quarry to work site and stacking at work site for pre measurements including cost and convenyance of all material and all labour charges etc. complete for road restoration

15970

-

-

... More
BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix M-30 (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nomonal reinforcement for Road restoration.

1853

-

-

... More
CAP Bill No: 10.2 Providing 15mm dia House Service Connection as per standard specification including the cost of the materials like Clamp Saddle,Ferrule Tapping Saddle confirming to I.S stadard manufactured from virgin resin of PE-80 , Compression Elbows, MDPE PE100 Pipe including lowering, laying and jointing including earth work excavation,UPVC Casing pipe with Two Calmps for drain crossings,Drilling of Holes for RR Masonary and CC Walls , Boring&Tunneling below CC &BT Roads ,saw cutting of groves in CC Roads and refilling the pipe line trench after laying the pipe line and including cost of 15mm dia meter of BIS standard etc complete as directed by departmental officer for finished item of work.( CC Roads and BT Roads should not be distrubed)

-

-

-

... More
Providing house service connections at house holds side in earthern roads (Minimum 4.0 Mts MDPE pipe)

2177

-

-

... More
Providing house service connections at other side in earthern roads ((Minimum 7.0 Mts MDPE pipe)

2177

-

-

... More
Providing house service connections at HH side in BT &CC roads (Minimum 7.0 Mts MDPE pipe)

5803

-

-

... More
Providing house service connections at other side in BT &CC roads (Minimum 4.0 Mts MDPE pipe)

4353

-

-

... More
AMR Ultrasonic / Electromagnetic Water Meters

-

-

-

... More
Supply, delivery, installing, satisfactory testing and commissioning of domestic Battery operated electronically compatible AMR Ultrasonic or AMR Electromagnetic Water Meters from 15 mm to 40 mmWater Meters having No moving parts in contact with water with body made up of brass or composite materials confirming to ISO along with manufacturing test certificate and Guarantee certificate with Battery life of min. 10 years with GSM /GPRS/ RF Technology for communication to server with PC Software via handheld reader or directly, including all material required for fixing, labour & giving satisfactory leak proof test etc Complete with poly-propylenemeter box. General Specifications: Meter should be battery operated with no moving parts, low pressure loss. Display: 8 digit LCD, Protection class IP 68 , Operating temperature 10 C to 55 C deg. , Accuracy up to +/- 2% and unaffected by Operating temperature , Pressure : PN 1.6 MPa, power supply : 3.1 to 3.7 VDC lithium battery with minimum life of more than 10 years. Flow Measurement Range 1 to 3000L/H, Warrantyrequired for10years. Memory built-in and should have storage for at least 12 months with daily / monthly accumulated totalised data with time and date should be available. It should be able to access memory of the meter through serial communication. The readings should be obtainable by either walkby or stationery pole with specific range or drive by on Android device. The acceptance / routine tests shall be either conducted by M/s. Fluid Control Research Institute, Palghat, Kerala or any of the Laboratories approved by the National Accreditation Board for calibration Laboratories (NABL) or installation at site etc. complete includingpoly-propylene box for keeping the meter. Including all charges excluding tax.

-

-

-

... More
15 mm House service Connections

14510

-

-

... More
CAP Bill No: 10.4 Providing for Implementation of Environmental Management Plan in the estimate for Piduguralla Municipality

-

-

-

... More
Monitoring Costs : Construction Phase (Two years)

-

-

-

... More
Air Quality Monitoring (3 Monitoring station) once in a month for three seasons during the construction period at off take chamber,ELSR's, Raw/Clear Pipe Line & Distribution network

18

-

-

... More
Noise level (3 Monitoring station) once in a month for three seasons during the construction period at off take chamber,ELSR's, Raw/Clear Pipe Line & Distribution network

18

-

-

... More
Water Quality Monitoring surface / ground (3 Monitoring station) once in a month for three seasons during the construction period at off take chamber,ELSR's, Raw/Clear Pipe Line & Distribution network

30

-

-

... More
Monitoring Costs : Construction Phase (one years)

-

-

-

... More
Air Quality Monitoring (3 Monitoring station) once in a month for three seasons during the construction period at off take chamber,ELSR's, Raw/Clear Pipe Line & Distribution network

12

-

-

... More
Noise level (3 Monitoring station) once in a month for three seasons during the construction period at off take chamber,ELSR's, Raw/Clear Pipe Line & Distribution network

12

-

-

... More
Water Quality Monitoring surface / ground (3 Monitoring station) once in a month for three seasons during the construction period at off take chamber,ELSR's, Raw/Clear Pipe Line & Distribution network

20

-

-

... More
Tree cutting

45

-

-

... More
Compensatory plantation and three years maintenance (Compensatory afforestation ratio is 1:5).

90

-

-

... More
Sprinkling of water once in a day for two years (excluding rainy days) 600 days

600

-

-

... More
Greenbelt development and maintenance in the surroundings / Buffer zone

-

-

-

... More
Health checkups and free medical distribution

-

-

-

... More
Awareness program/training

-

-

-

... More
Hiring for 2 No's Vechicles for 24 Months during ececution period including hire charges of vechicle, diesel, lubrication, driver charges, repairs and all incidental charges

48

-

-

... More
CAP Bill No: 10.5 upply, deliver and installation of bulk flow meter including consumer meters and other instruments in the deliveries for the DMAs of PIDUGURALLA SCHEME

-

-

-

... More
Electromagnetic Flow Meters

-

-

-

... More
Supply, delivery, installation and integration of Electromagnetic flow meter with IP68 and as per ISO 9001:2008,meter tube should be SS304 material, CS flanges of PN10/PN16 rating liner - hard rubber/polyurethane with WRAS or NSF drinking water approval, electrodes - SS316, 2 measuring electrodes for measuring,1 ground elctrode,1 empty pipe detection, coil housing - SS304 fully welded construction for corrosion grade/painted steel with protective lacquering (corrosive protection, class up to C5-1) as per EN ISO-12944/carbon steel, IP68 protection, Accuracy +/- 0.5% of measured value inclusive of linearity, repeatability etc, grounding rings of SS316/304. Flow transmitter microprocessor based wall mounted, flow ranges of the meter (full flow range). The overall uncertainty of the calibration rig should be atleast three times better than the uncertainty of the full bore electromagnetic flow meter. The competent government authority such as FCRI/NABL must certify the test facility etc. The EMF must be integrated with local SCADA server and the reading shall be captured all times 24x7. The flowmeter values must be persistent and there is no loss of data. The meter shall have display panel for displaying the readings according. This item shall, including cost, conveyance, etc complete as directed by the departmental officers

-

-

-

... More
Zone-I ( Head works , DMA Inlet 300 mm Ø )

1

-

-

... More
Zone-II ( Lenin Nagar , 1300 KL , DMA Inlet 300 mm Ø )

1

-

-

... More
Zone-III ( Bishop School , DMA Inlet 300 mm Ø )

1

-

-

... More
Zone-IV ( ZP School ,DMA Inlet 250 mm Ø )

1

-

-

... More
Zone-V ( NSP Colony , DMA Inlet 300 mm Ø )

1

-

-

... More
Zone-VI ( Appareddy Township , DMA Inlet 300 mm Ø )

1

-

-

... More
Pressure Transmitter

-

-

-

... More
Supply, delivery , installation of pressure transmitter with a pressure range of up to 16 bar and 64 bar for appropriate usages. Output: 4 to 20 mA, permissible temperature: -20°C to +70°C, IP65 rated with local display. For This item shall, including cost, conveyance, etc complete as directed by the departmental officers.

12

-

-

... More
Supply, delivery , installation of Data Logger with solar powered , battery backup of 5 days including SIM charges for 7 years, transmission rate shall be every 10 minutes cycle that can be configurable from 2 minutes upto 8 hours as needed.This unit shall have additional battery pack to power up ( 5 days backup) for the instruments connected to this item . The data collected from the instruments such as the bulk flow meter , preassure sensors , chlorine etc must be transmitted to the central SCADA Servers via the restfull web services hosted by the servers in the requred data format.

12

-

-

... More
Construction of CC masonry chambers with a openable MS hatch, with lock and key arrangement, steps arrangement, for Electromagnetic Flow meters, Butterfly valves as per pipe sizes including cost of cement, sand, bricks and other required material, including painting and suitable painting material, including labour charges. , Excavation and including wages. Complete as directed by the departmental officer.

-

-

-

... More
a) 250 mm

1

-

-

... More
b) 300 mm

5

-

-

... More
Chlorine Analyzer

-

-

-

... More
Supply, installation , delivery and testing wall mounted ABS plastic enclosure based Online Chlorine Analyzer of Amphreometric or Potentiometric type. Specifications of Range: 0 to 5 mg/L free or total residual chlorine, Resolution 0.01 PPM, Accuracy: +/- 0.05 PPM or better, Cycle Time: 4 minutes, Inlet: Sample Temperature: 5 to 40 °C, operating Temperature: Range 5 to 60 °C. Local LCD Display to display the values. Output: 4-20 mA or 0-10 VDC to integrate into PLC if needed. PH Compensation must be Auto/Manual. All accessories that are required for the must be provided.This item shall include the cost of consumables for the defect liability period of 2 years.

1

-

-

... More
Turbidity Analyzer

-

-

-

... More
Supply, installation , delivery and testing of wall mounted Turbidity Analyzer make of HACH/ ABB/ Forbes Marshall with specifications of Range 0.00-500.0(NTU/FNU), Operating Temperature : 0 – 60 °C, Displayed Resolution : 0.01 (0.00-19.99), 0.1(20.0-500.0)NTU/FNU, Response Time : Initial response in 1 minute, 15 seconds for a full-scale step change Signal, Sample, Temperature : 0 to 50°C (32 to 122°F), Output 4-20mA to integrate into PLC if needed. Local LCD Display to display the values . This item includes the cost of consumables for the defect liability period of 2 years.

1

-

-

... More
Supply, delivery , installation of Data Logger with solar powered , battery backup of 5 days including SIM charges for 7 years, transmission rate shall be every 10 minutes cycle that can be configurable from 2 minutes upto 8 hours as needed.This unit shall have additional battery pack to power up ( 5 days backup) for the instruments connected to this item . The data collected from the instruments such as the bulk flow meter , preassure sensors , chlorine etc must be transmitted to the central SCADA Servers via the restfull web services hosted by the servers in the requred data format.

1

-

-

... More
Supply delivery and installation of Protection MS grills with lock and key for equipment, instrumentations where ever necessary. This item shall, including cost, conveyance, etc complete as directed by the departmental officers.

1

-

-

... More
Pressure Reducing Valves

-

-

-

... More
Supply , Delivery and installation of manually adjusted preassure reducing valves , accurate pressure ratings. Maximum Upstream Pressure : 20 bar ; Maximum Working Temperature : 80°C. These PRV must be installed at key inlets points of the service reservior.

-

-

-

... More
Zone-I ( Head works , DMA Inlet 300 mm Ø )

1

-

-

2

-

-

1

-

-

1

-

-

... More
Zone-II ( Lenin Nagar , 1300 KL , DMA Inlet 300 mm Ø )

1

-

-

2

-

-

1

-

-

1

-

-

... More
Zone-III ( Bishop School , DMA Inlet 300 mm Ø )

1

-

-

2

-

-

1

-

-

1

-

-

... More
Zone-IV ( ZP School ,DMA Inlet 250 mm Ø )

1

-

-

2

-

-

1

-

-

1

-

-

... More
Zone-V ( NSP Colony , DMA Inlet 300 mm Ø )

1

-

-

2

-

-

1

-

-

1

-

-

... More
Zone-VI ( Appareddy Township , DMA Inlet 300 mm Ø )

1

-

-

2

-

-

1

-

-

1

-

-

... More
Handheld Devices

-

-

-

... More
Supply delivery and comissioning the Handheld Devices for meter reading and bill printing. The power back up of this item shall be for 24 hours , android based with on line and offline capabilities, portable credit/debit card machine reader integrated. The connectivity to the central server will be via rest full services with highest security standards , in json data format as directed by the departmental offer. The bill generation , collection shall reflect across the entire system and the acknoledgement of the receipt shall be sent by SMS to the consumer. SIM charges for 7 years shall be provided. This item shall include the cost of consumables for the defect liability period of 2 years.

13

-

-

... More
Control Centre

-

-

-

... More
Meter Intergations with server

1

-

-

... More
Supply, testing installation and commissioning of command control: Reputed / Branded Hardware servers (2 nos) with 8GB RAM and 1TB Hard Disk including for operating system server license CentOS/Lunix , Windows OS, key board mouse with 20" LED monitor, Routers, firewall, bill printer , as required for running the software and internet broad band connection with static IP for for 84 months . 2 nos desktop with windows operating system with 8GB RAM and 1TB Hardisk, key board mouse and 20" LED monitor , 3 Nos work station with 3 chairs for each work station , racks for servers , network wiring , power wiring , etc . This item shall, including cost, conveyance , warrenty for 2 years , complete as directed by the departmental officers.

1

-

-

... More
Supply, testing and commissioning of 55" LED monitor with Ethernet/HDMI/VGA/WIFI with waranty for 2 years

1

-

-

... More
Software shall have modules such as Consumer master , grievence , billing , reports , SMS integration , Access log module, online payment module , consumer logins , metering details , dash board , with authentication and authorisation module , issue tracker , accounting and finance module. The soft ware shall expose restfull web services for further/future integrations with other software. The database, web-server shall be open source, license free, portable with all internationally accepted security standards. Authorisation and user access control shall be implemented for the applications mentioned. The application/software shall provide Restful Web Service interface with JSON data format so that it can be integrated to other centralised software and the Android application. All the data received from the instruments and meters shall be stored in database for a period of 4 years and reports shall be retrieved on demand. The data shall be integrated to the SCADA server as directed by the deparmental officer.

1

-

-

... More
Printer - 3 in one on color printer with refillable ink bank

1

-

-

... More
Supply, Delivery and Installation of 1600VA UPS with solar panels, battery enclosures with doors along with racks, to provide 40 hours battery backup calculated at 50% load. The solar panels should to charge the battery to full capacity in 7 hours of sunshine. As per relevant specification amended time to time for single phase input with input circuit breakers provided protection, sine wave from with sealed battery, maintenance free, recharge time conform to standards. The Batteries shall be of VLRA Type. This item shall, including cost, conveyance, etc complete as directed by the departmental officers.

1

-

-

... More
OPEX -Operation & Maintance to be executed by Piduguralla Municipality

-

-

-

... More
OM Bill No: 10.6. Personal required for ELSR sites/ Gravity Mains/ Pumping Mains

-

-

-

... More
fitters- Gravity Main(distrubition)

120

-

-

... More
OM Bill No: 10.7. Personal required for operating Valves in distribution lines

-

-

-

... More
Valve Operator/Turn Cocks

120

-

-

... More
Helpers for Distribution

300

-

-

1

-

-

... More
OM Bill No: 10.8. Repairs to pumpsets & Water pipe lines ( for Five years )

-

-

-

... More
Replacement of glands of sluice valves

20

-

-

... More
Replacements of balls of Air valves

20

-

-

... More
Provision towards purchase pipe jointing materials, etc

1

-

-

... More
OM Bill No: 10.9. Service Charge for bill generations , collections and maintainence for 14510 consumers x 12 months x 7 years = 1218840. This item includes cost of consumables .

1218840

-

-

... More
OM Bill No: 1.10. Monitoring Costs: Operation Phase (One Year)

-

-

-

... More
Air Quality Monitoring (3 Monitoring stations) twice in a year at distribution network and as per Technical Specification

18

-

-

... More
Noise Level Monotoring (3 Monitoring stations) twice in a year at distribution network and as per Technical Specification

18

-

-

... More
Water Quality Monotoring (3 Monitoring stations) twice in a year at distribution network and as per Technical Specification

30

-

-

... More
CAP Bill no : Providing Distribution system for Zone - I, Zone-II, Zone-III and Zone-IIIA including Road Restoration. in Macherla Municipality including Road Restoration..

-

-

-

... More
Cutting open B.T. road surface (as well as asphalt concrete upto 75 mm thick) including water bound macadam including all labor charges and as per Technical Specification

4150

-

-

... More
Cutting open C.C. Road surface including stacking of excavated materials for pipe line trench work including all labor charges and as per Technical Specification

5577

-

-

... More
Cutting open Water Bound Macadam Road surface including stacking of excavated materials for pipe line trench work including all labor charges and as per Technical Specification

3746

-

-

... More
Earthwork in excavation for Pipe Line as per drawing and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material by Manual Means.

20790

-

-

... More
Earthwork in excavation for Pipe Line as per drawing and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material by Mechanical Means.

48510

-

-

... More
Filling inpipe line trenches as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH sand filling

5507

-

-

... More
Supply and Delivery of HDPE PE-100 6 KSC Pipes conforming to IS 4984 - 1995 including cost and transportation to site of work and stacking as per standards including all taxes and duties but excluding GST and as per the Technical Specification

-

-

-

... More
110 OD HDPE Pipes

57290

-

-

... More
160 OD HDPE Pipes

9050

-

-

... More
200 OD HDPE Pipes

7006

-

-

... More
250 OD HDPE Pipes

6224

-

-

... More
315 OD HDPE Pipes

3059

-

-

... More
350 OD HDPE Pipes

839

-

-

... More
400 OD HDPE pipes

1

-

-

... More
Jointing CI pipes, fittings and valves with flanged ends including cost of jointing materials such as bolts, rubber insertion, white lead including filling with water, with lead up to 500 meters and testing to required pressure complete and as per Technical Specification

-

-

-

... More
80 mm Dia

123

-

-

... More
110 mm Dia

621

-

-

... More
150 mm Dia

103

-

-

... More
200 mm dia

74

-

-

... More
250 mm dia

66

-

-

... More
300mm dia

50

-

-

... More
350mm dia

21

-

-

... More
Supply and Delivery of HDPE PE-100 6 KSC Pipes conforming to IS 4984 - 1995 including cost and transportation to site of work and stacking as per standards including all taxes and duties but excluding GST and as per the Technical Specification

-

-

-

... More
a) Pipe ends - long neck

-

-

-

... More
110mm dia.

382

-

-

... More
110 mm dia for Air TEEs

154

-

-

... More
160mm dia.

60

-

-

... More
160 mm dia for Air TEEs

22

-

-

... More
200mm dia.

46

-

-

... More
200 mm dia for Air TEEs

26

-

-

... More
250mm dia.

42

-

-

... More
250 mm dia for Air TEEs

16

-

-

... More
250 mm dia for flow meter

1

-

-

... More
315mm OD

32

-

-

... More
315 mm dia for Air TEEs

18

-

-

... More
315 mm dia for bulk flow meter

1

-

-

... More
355mm OD

8

-

-

... More
355 mm dia for Air TEEs

10

-

-

... More
355 mm dia for bulk flow meter

8

-

-

... More
b) MS Flanges

-

-

-

... More
110mm dia.

382

-

-

... More
110 mm dia for Air TEEs

154

-

-

... More
160mm dia.

60

-

-

... More
160 mm dia for Air TEEs

22

-

-

... More
200mm dia.

46

-

-

... More
200 mm dia for Air TEEs

26

-

-

... More
250mm dia.

42

-

-

... More
250 mm dia for Air TEEs

16

-

-

... More
250 mm dia for flow meter

1

-

-

... More
315 mm dia.

32

-

-

... More
315 mm dia for Air TEEs

18

-

-

... More
315 mm dia for bulk flow meter

1

-

-

... More
355 mm dia

8

-

-

... More
355 mm dia for Air TEEs

10

-

-

... More
355 mm dia for bulk flow meter

8

-

-

... More
End Caps

-

-

-

... More
110mm dia.

29

-

-

... More
160mm dia.

4

-

-

... More
200mm dia.

7

-

-

... More
250mm dia.

7

-

-

... More
315mm OD

4

-

-

... More
355mm OD

1

-

-

... More
Reducer

-

-

-

... More
110X125 mm dia

45

-

-

... More
125x140 mm dia

45

-

-

... More
140x160 mm dia

45

-

-

... More
160x180 mm dia

46

-

-

... More
180x200 mm dia

46

-

-

... More
200x225 mm dia

8

-

-

... More
225x250 mm dia

8

-

-

... More
250x280 mm dia

8

-

-

... More
280x315 mm dia

8

-

-

... More
315x355 mm dia

8

-

-

-

-

-

... More
110mm dia.

232

-

-

... More
160mm dia.

38

-

-

... More
200mm dia.

30

-

-

... More
250mm dia.

27

-

-

... More
315mm OD

14

-

-

... More
355mm OD

4

-

-

-

-

-

... More
110mm dia.

117

-

-

... More
160mm dia.

20

-

-

... More
200mm dia.

15

-

-

... More
250mm dia.

15

-

-

... More
315mm OD

8

-

-

... More
355mm OD

3

-

-

... More
Lowering, Laying and jointing of HDPE pipes by butt fusion welding as per IS:7634 – part-II/1975 as amended from time to time true to the alignment and gradient and testing the pipeline to the required testing pressure and as per the Technical Specification.

-

-

-

... More
110mm dia.

57292

-

-

... More
160mm dia.

9050

-

-

... More
200mm dia.

7006

-

-

... More
250mm dia.

6224

-

-

... More
315mm OD

3059

-

-

... More
355mm OD

839

-

-

... More
DI fittings

5239.3

-

-

... More
100X2.00m on 110 and 160 mm dia mains for scours

23

-

-

... More
100x1.00m long DF pipes for sluice valves

382

-

-

... More
150 mm dia x2.00m on 200 and 250 mm dia pipes for scours

7

-

-

... More
150x1.00m long DF pipes for sluice valves

60

-

-

... More
200 mm dia x2.00m on 315 and 355 mm dia pipes for scours

2

-

-

... More
200x1.00m long DF pipes for sluice valves

46

-

-

... More
250x1.00m long DF pipes for sluice valves

42

-

-

... More
300x1.00m long DF pipes for sluice valves

32

-

-

... More
350x1.00m long DF pipes for sluice valves

8

-

-

... More
350x1.00m long DF pipes for flow meter

8

-

-

... More
Supply and delivery of PN 1.6 D.I D/F "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) confirming to IS 14846 latest amendment and Material of Construction (as per latest codes) as per Technical Specification of the Tender Document including cost and conveyance and stacking as per standards and as directed by Engineer-in-charge

-

-

-

... More
100mm dia for distrubution

191

-

-

... More
150mm dia for distrubution

30

-

-

... More
200mm dia for distrubution

23

-

-

... More
250mm dia for distrubution

21

-

-

... More
300mm dia for distrubution

16

-

-

... More
350mm dia for distrubution

4

-

-

... More
for scour

-

-

-

... More
100mm dia on 160 mm dia mains

23

-

-

... More
150 mm dia on 200 & 250 mm dia lines

7

-

-

... More
200 mm dia on 315 & 355 mm dia lines

2

-

-

... More
Manufacture, supply and delivery of Single Chamber DI Air Valve with Body and cover in Ductile Iron of grade SG 400/12 or equivalent grade as per I.S.3896-part2-1985 and subsequent revisions. All internal parts such as float, shell etc., all cover bolts, of stainless steel, and Gaskets and seals of EPDM food grade quality Epoxy powder coating (EP-P) inside and outside colour blue. Drilled as per IS:1538. PN16

-

-

-

... More
80 mm dia on 110 mm pipe

77

-

-

... More
80 mm dia on 160 mm pipe

11

-

-

... More
80mm dia 200 mm pipe

13

-

-

... More
80mm dia 250 mm pipe

8

-

-

... More
80mm dia 315 mm pipe

9

-

-

... More
80mm dia 355 mm pipe

5

-

-

... More
Lowering, keeping in position and fixing DI sluice valves (with cap / with hand wheel & reflex valves) including all labor charges and incidental charges and as per Technical Specification

-

-

-

... More
100 mm distrubution

191

-

-

... More
150mm dia for distrubution

30

-

-

... More
200mm dia for distrubution

23

-

-

... More
250mm dia for distrubution

21

-

-

... More
300mm dia for distrubution

16

-

-

... More
350mm dia for distrubution

4

-

-

... More
for scour

-

-

-

... More
100mm dia on 110 mm and 160 mm dia mains

23

-

-

... More
150 mm dia on 200 and 250 mm dia lines

7

-

-

... More
200 mm dia on 315 and 355 mm lines

2

-

-

... More
Labour charges for fixing Kinetic Air Valves with isolating Sluice valves, Double Air valves/ Air Cushion valve excluding cost of jointing materials such as bolts, nuts and rubber insertions etc., complete.

-

-

-

... More
80 mm dia on 150,250,315,355 mm pipes

123

-

-

... More
Construction of sluice and scour Valve Chamber as per type design drawing with CC including, plastering, RCC cover slabs etc. including cost and conveyance of all material and all labour charges etc. complete as per S.S for finished item of work

-

-

-

... More
100 mm distrubution

191

-

-

... More
150mm dia for distrubution

30

-

-

... More
200mm dia for distrubution

23

-

-

... More
250mm dia for distrubution

21

-

-

... More
300mm dia for distrubution

16

-

-

... More
350mm dia for distrubution

4

-

-

... More
for scour

-

-

-

... More
100mm dia on 110 mm and 160 mm dia mains

23

-

-

... More
150 mm dia on 200 and 250 mm dia lines

7

-

-

... More
200 mm dia on 315 and 355 mm lines

2

-

-

... More
Construction of Air Valve Chamber as per type design drawing with RCC including, plastering, RCC cover slabs etc. including cost and conveyance of all material and all labour charges etc. complete as per S.S for finished item of work

-

-

-

... More
80 mm dia on 110 mm pipe

77

-

-

... More
80 mm dia on 160 mm pipe

11

-

-

... More
80mm dia 200 mm pipe

13

-

-

... More
80mm dia 315 mm pipe

9

-

-

... More
80mm dia 355 mm pipe

5

-

-

... More
Lowering the C.I. Pipes, D.I. Pipes of all classes and fittings with flanged ends carefully into the trenches and laying them true to alignment and gradient including all sundries, but excluding conveyance from source of supply as per BIS No.3114/94.

-

-

-

... More
100 mm

525.7

-

-

... More
150 mm dia

91.3

-

-

... More
200 mm dia

63

-

-

... More
250 mm dia

50

-

-

... More
300 mm dia

42.8

-

-

... More
350 mm dia

22

-

-

... More
Collection, Supply and filling of Stone dust / Quarry spall from approved quarry to work site and stacking at work site for pre measurements including cost and convenyance of all material and all labour charges etc. complete for road restoration

13430

-

-

... More
BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix M-30 (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nomonal reinforcement for Road restoration.

1700

-

-

... More
Providing 15mm dia House Service Connection as per standard specification including the cost of the materials like Clamp Saddle,Ferrule Tapping Saddle confirming to I.S stadard manufactured from virgin resin of PE-80 , Compression Elbows, MDPE PE100 Pipe including lowering, laying and jointing including earth work excavation,UPVC Casing pipe with Two Calmps for drain crossings,Drilling of Holes for RR Masonary and CC Walls , Boring&Tunneling below CC &BT Roads ,saw cutting of groves in CC Roads and refilling the pipe line trench after laying the pipe line and including cost of 15mm dia meter of BIS standard etc complete as directed by departmental officer for finished item of work.

-

-

-

... More
Providing house service connections at house holds side in earthern roads (Minimum 4.0 Mts MDPE pipe)

623

-

-

... More
Providing house service connections at other side in earthern roads ((Minimum 7.0 Mts MDPE pipe)

623

-

-

... More
Providing house service connections at HH side in BT &CC roads (Minimum 7.0 Mts MDPE pipe)

1660

-

-

... More
Providing house service connections at other side in BT &CC roads (Minimum 4.0 Mts MDPE pipe)

1245

-

-

... More
AMR Ultrasonic / Electromagnetic Water Meters

-

-

-

... More
Supply, delivery, installing, satisfactory testing and commissioning of domestic Battery operated electronically compatible AMR Ultrasonic or AMR Electromagnetic Water Meters from 15 mm to 40 mmWater Meters having No moving parts in contact with water with body made up of brass or composite materials confirming to ISO along with manufacturing test certificate and Guarantee certificate with Battery life of min. 10 years with GSM /GPRS/ RF Technology for communication to server with PC Software via handheld reader or directly, including all material required for fixing, labour & giving satisfactory leak proof test etc Complete with poly-propylenemeter box. General Specifications: Meter should be battery operated with no moving parts, low pressure loss. Display: 8 digit LCD, Protection class IP 68 , Operating temperature 10 C to 55 C deg. , Accuracy up to +/- 2% and unaffected by Operating temperature , Pressure : PN 1.6 MPa, power supply : 3.1 to 3.7 VDC lithium battery with minimum life of more than 10 years. Flow Measurement Range 1 to 3000L/H, Warrantyrequired for10years. Memory built-in and should have storage for at least 12 months with daily / monthly accumulated totalised data with time and date should be available. It should be able to access memory of the meter through serial communication. The readings should be obtainable by either walkby or stationery pole with specific range or drive by on Android device. The acceptance / routine tests shall be either conducted by M/s. Fluid Control Research Institute, Palghat, Kerala or any of the Laboratories approved by the National Accreditation Board for calibration Laboratories (NABL) or installation at site etc. complete includingpoly-propylene box for keeping the meter. Including all charges excluding tax.

4150

-

-

... More
Providing for Implementation of Environmental Management Plan in the estimate for Macherla Municipality

-

-

-

... More
I. Monitoring Costs : Construction Phase (Two years)

-

-

-

... More
Air Quality Monitoring (5 Monitoring station) once in a month for three seasons during the construction period at intake well, WTP, Sump, ELSR's, Raw/Clear Pipe Line & Distribution network

24

-

-

... More
Noise level (5 Monitoring station) once in a month for three seasons during the construction period at intake well, WTP, Sump, ELSR's, Raw/Clear Pipe Line & Distribution network

24

-

-

... More
Water Quality Monitoring surface / ground (5 Monitoring station) once in a month for three seasons during the construction period at intake well, WTP, Sump, ELSR's, Raw/Clear Pipe Line & Distribution network

36

-

-

... More
II. Monitoring Costs : Construction Phase (one years)

-

-

-

... More
Air Quality Monitoring (5 Monitoring station) once in a month for three seasons during the construction period at intake well, WTP, Sump, ELSR's, Raw/Clear Pipe Line & Distribution network

16

-

-

... More
Noise level (5 Monitoring station) once in a month for three seasons during the construction period at intake well, WTP, Sump, ELSR's, Raw/Clear Pipe Line & Distribution network

16

-

-

... More
Water Quality Monitoring surface / ground (5 Monitoring station) once in a month for three seasons during the construction period at intake well, WTP, Sump, ELSR's, Raw/Clear Pipe Line & Distribution network

24

-

-

... More
Compensatory plantation and three years maintenance (Compensatory afforestation ratio is 1:5).

90

-

-

... More
Cutting of Trees

45

-

-

... More
Sprinkling of water once in a day for two years (excluding rainy days) 600 days

600

-

-

... More
Greenbelt development and maintenance in the surroundings / Buffer zone

1

-

-

... More
Health checkups and free medical distribution

1

-

-

... More
Awareness program/training

1

-

-

... More
Hiring for 2 No's Vechicles for 24 Months during execution period including hire charges of vechicle, diesel, lubrication, driver charges, repairs and all incidental charges

48

-

-

... More
Supply, deliver and installation of bulk flow meter including consumer meters and other instruments in the deliveries for the DMAs of MACHERLA

-

-

-

... More
Electromagnetic Flow Meters

-

-

-

... More
Supply, delivery, installation and integration of Electromagnetic flow meter with IP68 and as per ISO 9001:2008,meter tube should be SS304 material, CS flanges of PN16 rating liner - hard rubber/polyurethane with WRAS or NSF drinking water approval, electrodes - SS316, 2 measuring electrodes for measuring,1 ground elctrode,1 empty pipe detection, coil housing - SS304 fully welded construction for corrosion grade/painted steel with protective lacquering (corrosive protection, class up to C5-1) as per EN ISO-12944/carbon steel, IP68 protection, Accuracy +/- 0.5% of measured value inclusive of linearity, repeatability etc, grounding rings of SS316/304. Flow transmitter microprocessor based wall mounted, flow ranges of the meter (full flow range). The overall uncertainty of the calibration rig should be atleast three times better than the uncertainty of the full bore electromagnetic flow meter. The competent government authority such as FCRI/NABL must certify the test facility etc. The EMF must be integrated with local SCADA server and the reading shall be captured all times 24x7. The flowmeter values must be persistent and there is no loss of data. The meter shall have display panel for displaying the readings according. This item shall, including cost, conveyance, etc complete as directed by the departmental officers.

-

-

-

... More
Zone-I ( ZP High School , DMA Inlet 350 mm Ø )

-

-

-

1

-

-

... More
Zone-II ( Ropeway Colony , DMA Inlet 300 mm Ø )

-

-

-

1

-

-

... More
Zone-III ( Municipal Office , DMA Inlet 350 mm Ø )

-

-

-

1

-

-

... More
Zone-IIIA ( Municipal Office , DMA Inlet 300 mm Ø )

-

-

-

1

-

-

... More
Pressure Transmitter

-

-

-

... More
Supply, delivery , installation of pressure transmitter with a pressure range of up to 16 bar and 64 bar for appropriate usages. Output: 4 to 20 mA, permissible temperature: -20°C to +70°C, IP65 rated with local display. For This item shall, including cost, conveyance, etc complete as directed by the departmental officers.

8

-

-

... More
Supply, delivery , installation of Data Logger with solar powered , battery backup of 5 days including SIM charges for 7 years, transmission rate shall be every 10 minutes cycle that can be configurable from 2 minutes upto 8 hours as needed.This unit shall have additional battery pack to power up ( 5 days backup) for the instruments connected to this item . The data collected from the instruments such as the bulk flow meter , preassure sensors , chlorine etc must be transmitted to the central SCADA Servers via the restfull web services hosted by the servers in the requred data format.

8

-

-

... More
Construction of CC masonry chambers with a openable MS hatch, with lock and key arrangement, steps arrangement, for Electromagnetic Flow meters, Butterfly valves as per pipe sizes including cost of cement, sand, bricks and other required material, including painting and suitable painting material, including labour charges. , Excavation and including wages. Complete as directed by the departmental officer.

-

-

-

... More
a) 300 mm

2

-

-

... More
b) 350 mm

2

-

-

... More
Chlorine Analyzer

-

-

-

... More
Supply, installation , delivery and testing wall mounted ABS plastic enclosure based Online Chlorine Analyzer of Amphreometric or Potentiometric type. Specifications of Range: 0 to 5 mg/L free or total residual chlorine, Resolution 0.01 PPM, Accuracy: +/- 0.05 PPM or better, Cycle Time: 4 minutes, Inlet: Sample Temperature: 5 to 40 °C, operating Temperature: Range 5 to 60 °C. Local LCD Display to display the values. Output: 4-20 mA or 0-10 VDC to integrate into PLC if needed. PH Compensation must be Auto/Manual. All accessories that are required for the must be provided.This item shall include the cost of consumables for the defect liability period of 2 years.

1

-

-

... More
Turbidity Analyzer

-

-

-

... More
Supply, installation , delivery and testing of wall mounted Turbidity Analyzer make of HACH/ ABB/ Forbes Marshall with specifications of Range 0.00-500.0(NTU/FNU), Operating Temperature : 0 – 60 °C, Displayed Resolution : 0.01 (0.00-19.99), 0.1(20.0-500.0)NTU/FNU, Response Time : Initial response in 1 minute, 15 seconds for a full-scale step change Signal, Sample, Temperature : 0 to 50°C (32 to 122°F), Output 4-20mA to integrate into PLC if needed. Local LCD Display to display the values . This item includes the cost of consumables for the defect liability period of 2 years.

1

-

-

... More
Supply, delivery , installation of Data Logger with solar powered , battery backup of 5 days including SIM charges for 7 years, transmission rate shall be every 10 minutes cycle that can be configurable from 2 minutes upto 8 hours as needed.This unit shall have additional battery pack to power up ( 5 days backup) for the instruments connected to this item . The data collected from the instruments such as the bulk flow meter , preassure sensors , chlorine etc must be transmitted to the central SCADA Servers via the restfull web services hosted by the servers in the requred data format.

1

-

-

... More
Supply delivery and installation of Protection MS grills with lock and key for equipment, instrumentations where ever necessary. This item shall, including cost, conveyance, etc complete as directed by the departmental officers.

1

-

-

... More
Pressure Reducing Valves

-

-

-

... More
Supply , Delivery and installation of manually adjusted preassure reducing valves , accurate pressure ratings. Maximum Upstream Pressure : 20 bar ; Maximum Working Temperature : 80°C. These PRV must be installed at key inlets points of the service reservior.

-

-

-

... More
Zone-I ( ZP High School , DMA Inlet 350 mm Ø )

-

-

-

2

-

-

1

-

-

1

-

-

... More
Zone-II ( Ropeway Colony , DMA Inlet 300 mm Ø )

-

-

-

2

-

-

1

-

-

1

-

-

... More
Zone-III ( Municipal Office , DMA Inlet 350 mm Ø )

-

-

-

2

-

-

1

-

-

1

-

-

... More
Zone-IIIA ( Municipal Office , DMA Inlet 300 mm Ø )

-

-

-

2

-

-

1

-

-

1

-

-

... More
Handheld Devices

-

-

-

... More
Supply delivery and comissioning the Handheld Devices for meter reading and bill printing. The power back up of this item shall be for 24 hours , android based with on line and offline capabilities, portable credit/debit card machine reader integrated. The connectivity to the central server will be via rest full services with highest security standards , in json data format as directed by the departmental offer. The bill generation , collection shall reflect across the entire system and the acknoledgement of the receipt shall be sent by SMS to the consumer. SIM charges for 7 years shall be provided. This item shall include the cost of consumables for the defect liability period of 2 years.

3

-

-

... More
Control Centre

-

-

-

... More
Meter Intergations with server

1

-

-

... More
Supply, testing installation and commissioning of command control: Reputed / Branded Hardware servers (2 nos) with 8GB RAM and 1TB Hard Disk including for operating system server license CentOS/Lunix , Windows OS, key board mouse with 20" LED monitor, Routers, firewall, bill printer , as required for running the software and internet broad band connection with static IP for for 84 months . 2 nos desktop with windows operating system with 8GB RAM and 1TB Hardisk, key board mouse and 20" LED monitor , 3 Nos work station with 3 chairs for each work station , racks for servers , network wiring , power wiring , etc . This item shall, including cost, conveyance , warrenty for 2 years , complete as directed by the departmental officers.

1

-

-

... More
Supply, testing and commissioning of 55" LED monitor with Ethernet/HDMI/VGA/WIFI with waranty for 2 years

1

-

-

... More
Software shall have modules such as Consumer master , grievence , billing , reports , SMS integration , Access log module, online payment module , consumer logins , metering details , dash board , with authentication and authorisation module , issue tracker , accounting and finance module. The soft ware shall expose restfull web services for further/future integrations with other software. The database, web-server shall be open source, license free, portable with all internationally accepted security standards. Authorisation and user access control shall be implemented for the applications mentioned. The application/software shall provide Restful Web Service interface with JSON data format so that it can be integrated to other centralised software and the Android application. All the data received from the instruments and meters shall be stored in database for a period of 4 years and reports shall be retrieved on demand. The data shall be integrated to the SCADA server as directed by the deparmental officer.

1

-

-

... More
Printer - 3 in one on color printer with refillable ink bank

1

-

-

... More
Supply, Delivery and Installation of 1600VA UPS with solar panels, battery enclosures with doors along with racks, to provide 40 hours battery backup calculated at 50% load. The solar panels should to charge the battery to full capacity in 7 hours of sunshine. As per relevant specification amended time to time for single phase input with input circuit breakers provided protection, sine wave from with sealed battery, maintenance free, recharge time conform to standards. The Batteries shall be of VLRA Type. This item shall, including cost, conveyance, etc complete as directed by the departmental officers.

1

-

-

... More
OPEX -Operation & Maintance to be executed by Macherla ULB's

-

-

-

... More
Supply, Delivery and Installation of 1600VA UPS with solar panels, battery enclosures with doors along with racks, to provide 40 hours battery backup calculated at 50% load. The solar panels should to charge the battery to full capacity in 7 hours of sunshine. As per relevant specification amended time to time for single phase input with input circuit breakers provided protection, sine wave from with sealed battery, maintenance free, recharge time conform to standards. The Batteries shall be of VLRA Type. This item shall, including cost, conveyance, etc complete as directed by the departmental officers.

-

-

-

... More
Meter Intergations with server

180

-

-

... More
Supply, testing installation and commissioning of command control: Reputed / Branded Hardware servers (2 nos) with 8GB RAM and 1TB Hard Disk including for operating system server license CentOS/Lunix , Windows OS, key board mouse with 20" LED monitor, Routers, firewall, bill printer , as required for running the software and internet broad band connection with static IP for for 84 months . 2 nos desktop with windows operating system with 8GB RAM and 1TB Hardisk, key board mouse and 20" LED monitor , 3 Nos work station with 3 chairs for each work station , racks for servers , network wiring , power wiring , etc . This item shall, including cost, conveyance , warrenty for 2 years , complete as directed by the departmental officers.

-

-

-

... More
Supply, testing and commissioning of 55" LED monitor with Ethernet/HDMI/VGA/WIFI with waranty for 2 years

240

-

-

... More
Software shall have modules such as Consumer master , grievence , billing , reports , SMS integration , Access log module, online payment module , consumer logins , metering details , dash board , with authentication and authorisation module , issue tracker , accounting and finance module. The soft ware shall expose restfull web services for further/future integrations with other software. The database, web-server shall be open source, license free, portable with all internationally accepted security standards. Authorisation and user access control shall be implemented for the applications mentioned. The application/software shall provide Restful Web Service interface with JSON data format so that it can be integrated to other centralised software and the Android application. All the data received from the instruments and meters shall be stored in database for a period of 4 years and reports shall be retrieved on demand. The data shall be integrated to the SCADA server as directed by the deparmental officer.

120

-

-

1

-

-

... More
Repairs to pumpsets & Water pipe lines ( for Five years )

-

-

-

... More
Replacement of ball glands

10

-

-

... More
Replacement of balls

10

-

-

... More
Purchase of pipe joints

1

-

-

... More
Service Charge for bill generations , collections and maintainence for 5023 consumers x 12 months x 7 years = 421932. This item includes cost of consumables .

348600

-

-

... More
Printer - 3 in one on color printer with refillable ink bank

-

-

-

... More
Monitoring Costs : Operation Phase ( One year)

24

-

-

... More
Printer - 3 in one on color printer with refillable ink bank

24

-

-

... More
Monitoring Costs : Operation Phase ( One year)

36

-

-

... More
CAP Bill no :8 Providing of Distribution system in Zone - I for a Length of 20720.00mts including Road Restoration.

-

-

-

... More
Cutting BT road surface as well as asphalt (75mm thick) including water bound. The rate including labour charges for cutting, incidental charges etc., complete as directed by the departmental officer in charge of the work.

2360

-

-

... More
Cutting the CC road surface. The rate including labour charges for cutting, incidental charges etc., complete as directed by the departmental officer in charge of the work.

4402

-

-

... More
Cutting the open water bound macadam. The rate including labour charges for cutting, incidental charges etc., complete as directed by the departmental officer in charge of the work.

1476

-

-

... More
Earthwork in excavation for Pipe Line as per drawing and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material by Mechanical Means. and as directed by the departmental authorities

18990

-

-

... More
Earthwork in excavation for Pipe Line as per drawing and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material by Mechanical Means. and as directed by the departmental authorities

44310

-

-

... More
Supply and filling with Sand complying with standard specifications including cost and conveyance of sand to site to work labour charges watering tamping, ramming etc complete and as directed by the Engineer-in-Charge of the work and as per Technical Specification

4829

-

-

... More
Manufacture, supply and delivery of PE 100-PN 6 HDPE pipes confirming to IS 4984-1995 including transportation to work spot, stacking including all taxes etc. complete as per S.S

-

-

-

... More
110mm dia.

28575

-

-

... More
160mm dia.

14460

-

-

... More
200mm dia.

9300

-

-

... More
250mm dia.

6920.78

-

-

... More
315 mm dia.

4295

-

-

... More
355 mm dia.

2583

-

-

... More
400 mm dia

1194.21

-

-

... More
Lowering, laying and jointing of HDPE pipes and jointing by butt fusion welding as per IS 7634-part-II/1975 as amended from time to time to the alignment and gradient and testing the pipeline to required pressure etc.complete

-

-

-

... More
110mm dia.

28575

-

-

... More
160mm dia.

14460

-

-

... More
200mm dia.

9300

-

-

... More
250mm dia.

6920.78

-

-

... More
315 mm dia.

4295

-

-

... More
355 mm dia.

2583

-

-

... More
400 mm dia

1194.21

-

-

... More
Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking excluding all taxes and duties etc.complete

-

-

-

... More
a) Pipe ends - long neck

-

-

-

... More
110mm dia.

128

-

-

... More
110 mm dia for Air TEEs

50

-

-

... More
160mm dia.

82

-

-

... More
160 mm dia for Air TEEs

38

-

-

... More
200mm dia.

50

-

-

... More
200 mm dia for Air TEEs

20

-

-

... More
250mm dia.

44

-

-

... More
250 mm dia for Air TEEs

18

-

-

... More
250 mm dia for flow meter

-

-

-

... More
315mm OD

42

-

-

... More
315 mm dia for Air TEEs

12

-

-

... More
355mm OD

26

-

-

... More
355 mm dia for Air TEEs

8

-

-

... More
400 mm dia OD

12

-

-

... More
400 mm dia for Air TEEs

4

-

-

... More
b) MS Flanges

-

-

-

... More
110mm dia.

128

-

-

... More
110 mm dia for Air TEEs

50

-

-

... More
160mm dia.

82

-

-

... More
160 mm dia for Air TEEs

38

-

-

... More
200mm dia.

50

-

-

... More
200 mm dia for Air TEEs

20

-

-

... More
250mm dia.

44

-

-

... More
250 mm dia for Air TEEs

18

-

-

... More
250 mm dia for flow meter

-

-

-

... More
315mm OD

42

-

-

... More
315 mm dia for Air TEEs

12

-

-

... More
355mm OD

26

-

-

... More
355 mm dia for Air TEEs

8

-

-

... More
400 mm dia OD

12

-

-

... More
400 mm dia for Air TEEs

4

-

-

... More
c) End Caps

-

-

-

... More
110mm dia.

15

-

-

... More
160mm dia.

7

-

-

... More
200mm dia.

11

-

-

... More
250mm dia.

7

-

-

... More
315mm OD

5

-

-

... More
355mm OD

4

-

-

... More
d) Reducers

-

-

-

... More
110X125 mm dia

34

-

-

... More
125x140 mm dia

34

-

-

... More
140x160 mm dia

34

-

-

... More
160x180 mm dia

46

-

-

... More
180x200 mm dia

46

-

-

... More
200x225 mm dia

29

-

-

... More
225x250 mm dia

29

-

-

... More
250x280 mm dia

1

-

-

... More
280x315 mm dia

1

-

-

... More
315x355 mm dia

1

-

-

... More
355x400 mm dia

1

-

-

... More
e) TEES

-

-

-

... More
110mm dia.

65

-

-

... More
160mm dia.

41

-

-

... More
200mm dia.

36

-

-

... More
250mm dia.

29

-

-

... More
315mm OD

20

-

-

... More
355mm OD

12

-

-

... More
400 mm dia

1

-

-

... More
F)Bends

-

-

-

... More
110mm dia.

58

-

-

... More
160mm dia.

34

-

-

... More
200mm dia.

22

-

-

... More
250mm dia.

17

-

-

... More
315mm OD

12

-

-

... More
355mm OD

8

-

-

... More
Supply and delivery of DI Pipes and fittings (Specials) confirming to specification No.I.S.No. 7181/1986, 5531/1988, 3950/1979 excluding GST and other duties including transportation and conveyance to work spot and stacking etc., complete as per S.S and as directed by the departmental authorities.

-

-

-

... More
DIDF pipes for scours

-

-

-

... More
100X2.00m on 110 and 160 mm dia mains for scours

15

-

-

... More
100x1.00m long DF pipes for sluice valves

128

-

-

... More
150 mm dia x2.00m on 200 and 250 mm dia pipes for scours

6

-

-

... More
150x1.00m long DF pipes for sluice valves

82

-

-

... More
200 mm dia x2.00m on 315 and 355 mm dia pipes for scours

4

-

-

... More
200x1.00m long DF pipes for sluice valves

50

-

-

... More
250x1.00m long DF pipes for sluice valves

44

-

-

... More
250x1.00m long DF pipes for flow meter

1

-

-

... More
300x1.00m long DF pipes for sluice valves

42

-

-

... More
350x1.00m long DF pipes for sluice valves

26

-

-

... More
400x1.00m long DF pipes for sluice valves

12

-

-

... More
100 mm dia deck foot bends

1

-

-

... More
150 mm dia deck foot bends

1

-

-

... More
100 mm dia semicircular bends

1

-

-

... More
150 mm dia semicircular bends

1

-

-

861.6

-

-

... More
100x100x80 mm DIDF TEE for air valves

1

-

-

... More
150x150x80 mm DIDF TEE for air valves

1

-

-

... More
200x200x80 mm DIDF TEE for air valves

1

-

-

... More
250x250x80 mm DIDF TEE for air valves

1

-

-

... More
300x300x80 mm DIDF TEE for air valves

1

-

-

... More
350x350x80 mm DIDF TEE for air valves

1

-

-

... More
400x400x100 mm DIDF TEE for air valves

1

-

-

2914

-

-

... More
OTHER DI FITTINGS

-

-

-

... More
Supply and delivery of PN 1.6 "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or Equivalent as per IS1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, Replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The Valves should be Vacuum tight and 100% leak proof with face to face dimensions as BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS - 1538 including cost and conveyance and as per Technical Specification

-

-

-

... More
100 mm distrubution

64

-

-

... More
150mm dia for distrubution

41

-

-

... More
200mm dia for distrubution

25

-

-

... More
250mm dia for distrubution

22

-

-

... More
300mm dia for distrubution

21

-

-

... More
350mm dia for distrubution

13

-

-

... More
400mm dia for distrubution

6

-

-

... More
for scour

-

-

-

... More
100mm dia on 110 mm and 160 mm dia mains

15

-

-

... More
150 mm dia on 200 and 250 mm dia lines

6

-

-

... More
200 mm dia on 315 and 355 mm lines

4

-

-

... More
Manufacture, supply and delivery of Single Chamber DI Air Valve with Body and cover in Ductile Iron of grade SG 400/12 or equivalent grade as per I.S.3896-part2-1985 and subsequent revisions. All internal parts such as float, shell etc., all cover bolts, of stainless steel, and Gaskets and seals of EPDM food grade quality Epoxy powder coating (EP-P) inside and outside colour blue. Drilled as per IS:1538. PN16

-

-

-

... More
80 mm dia on 110 mm pipe

25

-

-

... More
80 mm dia on 160 mm pipe

19

-

-

... More
80mm dia 200 mm pipe

10

-

-

... More
80mm dia 250 mm pipe

9

-

-

... More
80mm dia 315 mm pipe

6

-

-

... More
80mm dia 355 mm pipe

4

-

-

... More
100mm dia 400 mm pipe

2

-

-

... More
Lowering, keeping in position and fixing DI sluice valves (with cap / with hand wheel & reflex valves) including all labor charges and incidental charges and as per Technical Specification

-

-

-

... More
100 mm distrubution

64

-

-

... More
150mm dia for distrubution

41

-

-

... More
200mm dia for distrubution

25

-

-

... More
250mm dia for distrubution

22

-

-

... More
300mm dia for distrubution

21

-

-

... More
350mm dia for distrubution

13

-

-

... More
400mm dia for distrubution

6

-

-

... More
for scour

-

-

-

... More
100mm dia on 110 mm and 160 mm dia mains

15

-

-

... More
150 mm dia on 200 and 250 mm dia lines

6

-

-

... More
200 mm dia on 315 and 355 mm lines

4

-

-

... More
Labour charges for fixing Kinetic Air Valves with isolating Sluice valves, Double Air valves/ Air Cushion valve excluding cost of jointing materials such as bolts, nuts and rubber insertions etc., complete.

-

-

-

... More
80 mm dia on 150,250,315,355 mm pipes

45

-

-

... More
100 mm dia on 400 mm pipe

2

-

-

... More
Lowering the C.I. Pipes, D.I. Pipes of all classes and fittings with flanged ends carefully into the trenches and laying them true to alignment and gradient including all sundries, but excluding conveyance from source of supply as per BIS No.3114/94.

-

-

-

... More
DIDF pipes for scours

-

-

-

... More
100 mm

196.5

-

-

... More
150 mm dia

118.4

-

-

... More
200 mm dia

68

-

-

... More
250 mm dia

53

-

-

... More
300 mm dia

7.2

-

-

... More
350 mm dia

30.8

-

-

... More
400 mm dia

12

-

-

... More
Jointing CI pipes, fittings and valves with flanged ends including cost of jointing materials such as bolts, rubber insertion, white lead including filling with water, with lead up to 500 meters and testing to required pressure complete and as per Technical Specification

-

-

-

... More
80 mm dia

73

-

-

... More
100 mm dia

263

-

-

... More
150 mm dia

135

-

-

... More
200 mm dia

74

-

-

... More
250 mm dia

86

-

-

... More
300 mm dia

54

-

-

... More
350 mm dia

30

-

-

... More
400 mm dia

12

-

-

... More
Construction of sluice and scour Valve Chamber as per type design drawing with CC including, plastering, RCC cover slabs etc. including cost and conveyance of all material and all labour charges etc. complete as per S.S for finished item of work

-

-

-

... More
100 mm distrubution

64

-

-

... More
150mm dia for distrubution

41

-

-

... More
200mm dia for distrubution

25

-

-

... More
250mm dia for distrubution

22

-

-

... More
300mm dia for distrubution

21

-

-

... More
350mm dia for distrubution

13

-

-

... More
400mm dia for distrubution

6

-

-

... More
for scour

-

-

-

... More
100mm dia on 110 mm and 160 mm dia mains

15

-

-

... More
150 mm dia on 200 and 250 mm dia lines

6

-

-

... More
200 mm dia on 315 and 355 mm lines

4

-

-

... More
Construction of Air Valve Chamber as per type design drawing with RCC including, plastering, RCC cover slabs etc. including cost and conveyance of all material and all labour charges etc. complete as per S.S for finished item of work

-

-

-

... More
80 mm dia on 110 mm pipe

25

-

-

... More
80 mm dia on 160 mm pipe

19

-

-

... More
80mm dia 200 mm pipe

10

-

-

... More
80mm dia 250 mm pipe

9

-

-

... More
80mm dia 315 mm pipe

6

-

-

... More
80mm dia 355 mm pipe

4

-

-

... More
100mm dia 400 mm pipe

2

-

-

... More
Road Restoration

-

-

-

... More
Filling crushur stone dust in pipe line trenches as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH

8030

-

-

... More
Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix M-30 (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nomonal reinforcement for Road restoration. for BT&CC roads

1183

-

-

... More
Bill No: 2 Providing House Service Connections (shifing of existing HSCs and providing new HSCs)

-

-

-

... More
Providing House service connections on HDPE mains a) 1 No.of MDPE PE 80 blue/PE100 black Electro Fusion Tapping Saddle (Flexifit-Top loading type with load bearing capacity of 1500N) Electro Fusion Tapping Saddle shall comply with BS EN 12201-3:2011, PN-12.5/PN-16 Rating and manufactured from virgin resin of PE-80/PE-100 having blue/black colour. Raw material must be WRAS Approved as per BS 6920 for effect on water quality intended for human consumption. b) 1 No. of regulating brass ferrule as per IS 2692 c) 2 No. of compression adaptor with one side compression end to suit ½” (20mm OD )MDPE pipe and other side with female threaded off-take with SS-304 material inserts of sizes ½” BSP threads, Body , Nut and cap of Polypropylene , Clip ring of POM(Acetylic resin) and “O” ring of NBR material, as per ISO 17885 Standards with pressure rating PN 16. d) 2 No. of Double compression elbow to suit ½” (20mm OD )MDPE pipe, Body , Nut and cap of Polypropylene , Clip ring of POM(Acetylic resin) and “O” ring of NBR material, as per ISO 17885 Standards with pressure rating PN 16. e)MDPE PE80 Blue Pipe of specified length as per ISO 4427 Rev 1. For conveyance of potable water .The pressure rating of ½” (20mm OD) will be PN16. Certificate for compliance of testing these fittings and pipe as per BS-6920 by designated laboratories to be produced. f) CP bibcock g) Geotagging of the HSC h) drilling of hoe in RCC / RR in compound wall i) holder clamps where ever required j) UPVC pipe for drain crossing

-

-

-

... More
Providing house service connections at house holds side in earthern roads

1095

-

-

... More
Providing house service connections at other side in earthern roads

1095

-

-

... More
Providing house service connections at HH side in BT &CC roads

2921

-

-

... More
Providing house service connections at other side in BT &CC roads

2191

-

-

... More
AMR Ultrasonic / Electromagnetic Water Meters

-

-

-

... More
Supply, delivery, installing, satisfactory testing and commissioning of domestic Battery operated electronically compatible AMR Ultrasonic or AMR Electromagnetic Water Meters from 15 mm to 40 mmWater Meters having No moving parts in contact with water with body made up of brass or composite materials confirming to ISO along with manufacturing test certificate and Guarantee certificate with Battery life of min. 10 years with GSM /GPRS/ RF Technology for communication to server with PC Software via handheld reader or directly, including all material required for fixing, labour & giving satisfactory leak proof test etc Complete with poly-propylenemeter box. General Specifications: Meter should be battery operated with no moving parts, low pressure loss. Display: 8 digit LCD, Protection class IP 68 , Operating temperature 10 C to 55 C deg. , Accuracy up to +/- 2% and unaffected by Operating temperature , Pressure : PN 1.6 MPa, power supply : 3.1 to 3.7 VDC lithium battery with minimum life of more than 10 years. Flow Measurement Range 1 to 3000L/H, Warrantyrequired for10years. Memory built-in and should have storage for at least 12 months with daily / monthly accumulated totalised data with time and date should be available. It should be able to access memory of the meter through serial communication. The readings should be obtainable by either walkby or stationery pole with specific range or drive by on Android device. The acceptance / routine tests shall be either conducted by M/s. Fluid Control Research Institute, Palghat, Kerala or any of the Laboratories approved by the National Accreditation Board for calibration Laboratories (NABL) or installation at site etc. complete includingpoly-propylene box for keeping the meter. Including all charges excluding tax

7302

-

-

... More
Bill No: Supply, deliver and installation of bulk flow meter and other instruments in the deliveries for the DMAs of

-

-

-

... More
Electromagnetic Flow Meters

-

-

-

... More
Supply, delivery, installation and integration of Electromagnetic flow meter with IP68 and as per ISO 9001:2008,meter tube should be SS304 material, CS flanges of PN16 rating liner - hard rubber/polyurethane with WRAS or NSF drinking water approval, electrodes - SS316, 2 measuring electrodes for measuring,1 ground elctrode,1 empty pipe detection, coil housing - SS304 fully welded construction for corrosion grade/painted steel with protective lacquering (corrosive protection, class up to C5-1) as per EN ISO-12944/carbon steel, IP68 protection, Accuracy +/- 0.5% of measured value inclusive of linearity, repeatability etc, grounding rings of SS316/304. Flow transmitter microprocessor based wall mounted, flow ranges of the meter (full flow range). The overall uncertainty of the calibration rig should be atleast three times better than the uncertainty of the full bore electromagnetic flow meter. The competent government authority such as FCRI/NABL must certify the test facility etc. The EMF must be integrated with local SCADA server and the reading shall be captured all times 24x7. The flowmeter values must be persistent and there is no loss of data. The meter shall have display panel for displaying the readings according. This item shall, including cost, conveyance, etc complete as directed by the departmental officers.

-

-

-

... More
Zone-I ( MRO Office , DMA Inlet 300 mm Ø )

-

-

-

1

-

-

... More
Zone-II ( Near Amaravathi Township , DMA Inlet 300 mm Ø )

-

-

-

1

-

-

... More
Zone-III ( Gandalaya Peta , DMA Inlet 350 mm Ø )

-

-

-

1

-

-

... More
Zone-III A ( Gandalaya Peta , DMA Inlet 400 mm Ø )

-

-

-

1

-

-

... More
Zone-IV ( Lakshmi Narayana colony , DMA Inlet 400 mm Ø )

-

-

-

1

-

-

... More
Zone-V ( Kabela -Baptist Peta , Kpppurao colony , DMA Inlet 400 mm Ø )

-

-

-

1

-

-

... More
Zone-V A ( Kabela -Baptist Peta , Kpppurao colony , DMA Inlet 400 mm Ø )

-

-

-

1

-

-

... More
Zone-VI ( Housing Colony , DMA Inlet 350 mm Ø )

-

-

-

1

-

-

... More
Pressure Transmitter

-

-

-

... More
Supply, delivery , installation of pressure transmitter with a pressure range of up to 16 bar and 64 bar for appropriate usages. Output: 4 to 20 mA, permissible temperature: -20°C to +70°C, IP65 rated with local display. For This item shall, including cost, conveyance, etc complete as directed by the departmental officers.

16

-

-

... More
Supply, delivery , installation of Data Logger with solar powered , battery backup of 5 days including SIM charges for 7 years, transmission rate shall be every 10 minutes cycle that can be configurable from 2 minutes upto 8 hours as needed.This unit shall have additional battery pack to power up ( 5 days backup) for the instruments connected to this item . The data collected from the instruments such as the bulk flow meter , preassure sensors , chlorine etc must be transmitted to the central SCADA Servers via the restfull web services hosted by the servers in the requred data format.

16

-

-

... More
Construction of CC masonry chambers with a openable MS hatch, with lock and key arrangement, steps arrangement, for Electromagnetic Flow meters, Butterfly valves as per pipe sizes including cost of cement, sand, bricks and other required material, including painting and suitable painting material, including labour charges. , Excavation and including wages. Complete as directed by the departmental officer.

-

-

-

2

-

-

2

-

-

4

-

-

... More
Supply delivery and installation of Protection MS grills with lock and key for equipment, instrumentations where ever necessary. This item shall, including cost, conveyance, etc complete as directed by the departmental officers.

1

-

-

... More
Chlorine Analyzer

-

-

-

... More
Supply, installation , delivery and testing wall mounted ABS plastic enclosure based Online Chlorine Analyzer of Amphreometric or Potentiometric type. Specifications of Range: 0 to 5 mg/L free or total residual chlorine, Resolution 0.01 PPM, Accuracy: +/- 0.05 PPM or better, Cycle Time: 4 minutes, Inlet: Sample Temperature: 5 to 40 °C, operating Temperature: Range 5 to 60 °C. Local LCD Display to display the values. Output: 4-20 mA or 0-10 VDC to integrate into PLC if needed. PH Compensation must be Auto/Manual. All accessories that are required for the must be provided.This item shall include the cost of consumables for the defect liability period of 2 years.

1

-

-

... More
Turbidity Analyzer

-

-

-

... More
Supply, installation , delivery and testing of wall mounted Turbidity Analyzer make of HACH/ ABB/ Forbes Marshall with specifications of Range 0.00-500.0(NTU/FNU), Operating Temperature : 0 – 60 °C, Displayed Resolution : 0.01 (0.00-19.99), 0.1(20.0-500.0)NTU/FNU, Response Time : Initial response in 1 minute, 15 seconds for a full-scale step change Signal, Sample, Temperature : 0 to 50°C (32 to 122°F), Output 4-20mA to integrate into PLC if needed. Local LCD Display to display the values . This item includes the cost of consumables for the defect liability period of 2 years.

1

-

-

... More
Supply, delivery , installation of Data Logger with solar powered , battery backup of 5 days including SIM charges for 7 years, transmission rate shall be every 10 minutes cycle that can be configurable from 2 minutes upto 8 hours as needed.This unit shall have additional battery pack to power up ( 5 days backup) for the instruments connected to this item . The data collected from the instruments such as the bulk flow meter , preassure sensors , chlorine etc must be transmitted to the central SCADA Servers via the restfull web services hosted by the servers in the requred data format.

1

-

-

... More
Supply delivery and installation of Protection MS grills with lock and key for equipment, instrumentations where ever necessary. This item shall, including cost, conveyance, etc complete as directed by the departmental officers.

1

-

-

... More
Pressure Reducing Valves

-

-

-

... More
Supply , Delivery and installation of manually adjusted preassure reducing valves , accurate pressure ratings. Maximum Upstream Pressure : 20 bar ; Maximum Working Temperature : 80°C. These PRV must be installed at key inlets points of the service reservior.

-

-

-

... More
Zone-I ( MRO Office , DMA Inlet 300 mm Ø )

-

-

-

2

-

-

1

-

-

1

-

-

... More
Zone-II ( Near Amaravathi Township , DMA Inlet 300 mm Ø )

-

-

-

2

-

-

1

-

-

1

-

-

... More
Zone-III ( Gandalaya Peta , DMA Inlet 350 mm Ø )

-

-

-

2

-

-

1

-

-

1

-

-

... More
Zone-III A ( Gandalaya Peta , DMA Inlet 400 mm Ø )

-

-

-

2

-

-

1

-

-

1

-

-

... More
Zone-IV ( Lakshmi Narayana colony , DMA Inlet 400 mm Ø )

-

-

-

2

-

-

1

-

-

1

-

-

... More
Zone-V ( Kabela -Baptist Peta , Kpppurao colony , DMA Inlet 400 mm Ø )

-

-

-

2

-

-

1

-

-

1

-

-

... More
Zone-V A ( Kabela -Baptist Peta , Kpppurao colony , DMA Inlet 400 mm Ø )

-

-

-

2

-

-

1

-

-

1

-

-

... More
Zone-VI ( Housing Colony , DMA Inlet 350 mm Ø )

-

-

-

2

-

-

1

-

-

1

-

-

... More
Handheld Devices

-

-

-

... More
Supply delivery and comissioning the Handheld Devices for meter reading and bill printing. The power back up of this item shall be for 24 hours , android based with on line and offline capabilities, portable credit/debit card machine reader integrated. The connectivity to the central server will be via rest full services with highest security standards , in json data format as directed by the departmental offer. The bill generation , collection shall reflect across the entire system and the acknoledgement of the receipt shall be sent by SMS to the consumer. SIM charges for 7 years shall be provided. This item shall include the cost of consumables for the defect liability period of 2 years.

7

-

-

... More
Control Centre

-

-

-

... More
Meter Intergations with server

1

-

-

... More
Supply, testing installation and commissioning of command control: Reputed / Branded Hardware servers (2 nos) with 8GB RAM and 1TB Hard Disk including for operating system server license CentOS/Lunix , Windows OS, key board mouse with 20" LED monitor, Routers, firewall, bill printer , as required for running the software and internet broad band connection with static IP for for 84 months . 2 nos desktop with windows operating system with 8GB RAM and 1TB Hardisk, key board mouse and 20" LED monitor , 3 Nos work station with 3 chairs for each work station , racks for servers , network wiring , power wiring , etc . This item shall, including cost, conveyance , warrenty for 2 years , complete as directed by the departmental officers.

1

-

-

... More
Supply, testing and commissioning of 55" LED monitor with Ethernet/HDMI/VGA/WIFI with waranty for 2 years

1

-

-

... More
Software shall have modules such as Consumer master , grievence , billing , reports , SMS integration , Access log module, online payment module , consumer logins , metering details , dash board , with authentication and authorisation module , issue tracker , accounting and finance module. The soft ware shall expose restfull web services for further/future integrations with other software. The database, web-server shall be open source, license free, portable with all internationally accepted security standards. Authorisation and user access control shall be implemented for the applications mentioned. The application/software shall provide Restful Web Service interface with JSON data format so that it can be integrated to other centralised software and the Android application. All the data received from the instruments and meters shall be stored in database for a period of 4 years and reports shall be retrieved on demand. The data shall be integrated to the SCADA server as directed by the deparmental officer.

1

-

-

... More
Printer - 3 in one on color printer with refillable ink bank

1

-

-

... More
Supply, Delivery and Installation of 1600VA UPS with solar panels, battery enclosures with doors along with racks, to provide 40 hours battery backup calculated at 50% load. The solar panels should to charge the battery to full capacity in 7 hours of sunshine. As per relevant specification amended time to time for single phase input with input circuit breakers provided protection, sine wave from with sealed battery, maintenance free, recharge time conform to standards. The Batteries shall be of VLRA Type. This item shall, including cost, conveyance, etc complete as directed by the departmental officers.

1

-

-

... More
Bill No : 4 Providing for Implementation of Environmental Management Plan in the estimate for Mangalagiri Muncipality.

-

-

-

... More
I. Monitoring Costs : Construction Phase (Two years)

-

-

-

... More
Air Quality Monitoring ( 4 Monitoring stations) once in a month for three seasons during the construction period at Intake well, GLBR,WTP, ELSRs & Raw & clear water pipe lines

30

-

-

... More
Noise level Monitoring ( 4 Monitoring stations) once in a month for three seasons during the construction period at Intake well, GLBR,WTP, ELSRs & Raw & clear water pipe lines

30

-

-

... More
Water Quality Monitoring surface / ground (4 Monitoring stations) once in a month for three seasons during the construction period at Intake well, GLBR,WTP, ELSRs & Raw & clear water pipe lines

42

-

-

... More
Monitoring Costs : Operation Phase ( One year)

-

-

-

... More
Air Quality Monitoring ( 4 Monitoring stations) once in a month for three seasons during the construction period at Intake well, GLBR,WTP, ELSRs & Raw & clear water pipe lines

20

-

-

... More
Noise level Monitoring ( 4 Monitoring stations) once in a month for three seasons during the construction period at Intake well, GLBR,WTP, ELSRs & Raw & clear water pipe lines

20

-

-

... More
Water Quality Monitoring surface / ground (4 Monitoring stations) once in a month for three seasons during the construction period at Intake well, GLBR,WTP, ELSRs & Raw & clear water pipe lines

28

-

-

... More
tree cutting

100

-

-

... More
II. Compensatory plantation and three years maintenance (Compensatory afforestation ratio is 1:5)-Plant & Tree Gaurds

200

-

-

... More
Greenbelt development and maintenance in the surroundings / Buffer zone

1

-

-

... More
Miscellaneous

1

-

-

... More
Health checkups and free medical distribution

1

-

-

... More
Awareness program/training

1

-

-

... More
III. Sprinkling of water with 5000 Litres capacity tankers once in a day for 600 days (excluding rainy days)

600

-

-

... More
hiring of two vehicles during construction period

48

-

-

... More
OPEX -Operation & Maintance to be executed by concerened ULB's

-

-

-

... More
Personal required for operating Valves in distribution lines

-

-

-

... More
Valve Operator/Turn Cocks

120

-

-

... More
fitters- Gravity Main(distrubition)(2 nos x12 monthsx5years)

120

-

-

... More
Helpers for Distribution

300

-

-

... More
Salaries for 7 Years

1

-

-

... More
Taxes ( EPF @ 13.61%+4.75% ESI ) on personal for 1 year

1

-

-

... More
Providing qualified Diploma with minimum 2 Years of experience in SCADA/Computers , flow meters and instruments maintainence etc including daily routine checks on HMI , Flowmeter , PLC at all locations around the project and also operate ( 2 techinican x 366 days x 7 years = 5124 days ) inc ESI, PF and other statutory levies as directed by the departmental officers

1

-

-

... More
Service Charge for bill generations , collections and maintainence for 5023 consumers x 12 months x 7 years = 421932. This item includes cost of consumables .

421932

-

-

... More
Repairs to pumpsets & Water pipe lines ( for Five years )

-

-

-

... More
iv)Replacement of glands of sluice valves

1

-

-

... More
v) Replacements of balls of Air valves

1

-

-

... More
Provision towards purchase pipe jointing materials, etc

1

-

-

... More
Bill no 2.1 : Providing of Distribution system in Zone - I, II & III for a Length of 104746.00 mts including Trench Restoration. (Tadepalli Municipality)

-

-

-

... More
Earthwork in excavation for Pipe Line as per drawing and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material by Mechanical Means.

37520

-

-

... More
Earthwork in excavation for Pipe Line as per drawing and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material by Manual Means.

16080

-

-

... More
Supply and filling with Sand complying with standard specifications including cost and conveyance of sand to site to work labour charges watering tamping, ramming etc complete and as directed by the Engineer-in-Charge of the work and as per Technical Specification

4185

-

-

... More
Supply and Delivery of HDPE PE-100 6 KSC Pipes conforming to IS 4984 - 1995 including cost and transportation to site of work and stacking as per standards including all taxes and duties but excluding GST and as per the Technical Specification.

-

-

-

... More
110 OD HDPE Pipes

26067

-

-

... More
160 OD HDPE Pipes

14716

-

-

... More
200 OD HDPE Pipes

9458

-

-

... More
250 OD HDPE Pipes

5410

-

-

... More
315 OD HDPE Pipes

3360

-

-

... More
355 OD HDPE Pipes

939

-

-

... More
400OD HDPE Pipes

12

-

-

... More
Supply and Delivery of HDPE fittins conforming to IS 4984 - 1995 including cost and transportation to site of work and stacking as per standards including all taxes and duties but excluding GST and as per the Technical Specification.

-

-

-

... More
Pipe ends - long neck

-

-

-

... More
110 OD HDPE Pipes

96

-

-

... More
160 OD HDPE Pipes

84

-

-

... More
200 OD HDPE Pipes

46

-

-

... More
250 OD HDPE Pipes

42

-

-

... More
315 OD HDPE Pipes

18

-

-

... More
355 OD HDPE Pipes

4

-

-

... More
Air TEEs

-

-

-

... More
110 OD HDPE Pipes

52

-

-

... More
160 OD HDPE Pipes

44

-

-

... More
200 OD HDPE Pipes

36

-

-

... More
250 OD HDPE Pipes

32

-

-

... More
315 OD HDPE Pipes

20

-

-

... More
355 OD HDPE Pipes

2

-

-

... More
FLOW METERS

-

-

-

... More
250MM DIA

4

-

-

... More
315MM DIA

6

-

-

... More
MS Flanges

-

-

-

... More
110 OD HDPE Pipes

96

-

-

... More
160 OD HDPE Pipes

84

-

-

... More
200 OD HDPE Pipes

46

-

-

... More
250 OD HDPE Pipes

34

-

-

... More
315 OD HDPE Pipes

22

-

-

... More
355 OD HDPE Pipes

4

-

-

-

-

-

... More
110 OD HDPE Pipes

52

-

-

... More
160 OD HDPE Pipes

44

-

-

... More
200 OD HDPE Pipes

36

-

-

... More
250 OD HDPE Pipes

16

-

-

... More
315 OD HDPE Pipes

20

-

-

... More
355 OD HDPE Pipes

2

-

-

... More
FLOW METERS

-

-

-

... More
250OD HDPE Pipes

2

-

-

... More
315OD HDPE Pipes

6

-

-

... More
355OD HDPE Pipes

10

-

-

... More
END CAPS

-

-

-

... More
110 OD HDPE Pipes

12

-

-

... More
160 OD HDPE Pipes

10

-

-

... More
200 OD HDPE Pipes

13

-

-

... More
250 OD HDPE Pipes

6

-

-

... More
315 OD HDPE Pipes

4

-

-

... More
REDUCERS

-

-

-

... More
OD 110mm x 125mm

43

-

-

... More
OD 125mm x 140mm

43

-

-

... More
OD 140mm x 160mm

43

-

-

... More
OD 160mm x 180mm

31

-

-

... More
OD 180mm x 200mm

31

-

-

... More
OD 200mm x 225mm

18

-

-

... More
OD 225mm x 250mm

18

-

-

... More
OD 250mm x 280mm

17

-

-

... More
OD 280mm x 315mm

17

-

-

... More
OD 315mm x 355mm

11

-

-

... More
OD 355mm x 400mm

1

-

-

... More
e) TEES

-

-

-

... More
110 mm dia

69

-

-

... More
160 mm dia

45

-

-

... More
200 mm dia

35

-

-

... More
250 mm dia

22

-

-

... More
315 OD HDPE Pipes

17

-

-

... More
355 OD HDPE Pipes

7

-

-

... More
F)Bends

-

-

-

... More
110 mm dia

55

-

-

... More
160 mm dia

32

-

-

... More
200 mm dia

26

-

-

... More
250 mm dia

18

-

-

... More
315 OD HDPE Pipes

13

-

-

... More
355 OD HDPE Pipes

6

-

-

... More
Lowering, Laying and jointing of HDPE pipes by butt fusion welding as per IS:7634 – part-II/1975 as amended from time to time true to the alignment and gradient and testing the pipeline to the required testing pressure and as per the Technical Specification.

-

-

-

... More
110 OD HDPE Pipes

26067

-

-

... More
160 OD HDPE Pipes

14716

-

-

... More
200 OD HDPE Pipes

9458

-

-

... More
250 OD HDPE Pipes

5410

-

-

... More
315 OD HDPE Pipes

3360

-

-

... More
355 OD HDPE Pipes

393

-

-

... More
400 OD HDPE Pipes

12

-

-

... More
Supply and delivery of DI Pipes and fittings (Specials) confirming to specification No.I.S.No. 7181/1986, 5531/1988, 3950/1979 including VAT and other duties including transportation and conveyance to work spot and stacking etc., complete as per S.S and as directed by the departmental authorities.

-

-

-

... More
DIDF pipes for scours

-

-

-

... More
100X2.00m on 110 and 160 mm dia

11

-

-

... More
100x1.00m long DF pipes

96

-

-

... More
150 mm dia x2.00m on 200 and 250 mm scours

5

-

-

... More
150x1.00m long DF sluice valves

88

-

-

... More
200x2.00m long on 215mm dia and 355 dia for scours

3

-

-

... More
200x1.00m long DF sluice valves

46

-

-

... More
250x1.00m long DF sluice valves

30

-

-

... More
300x1.00m long DF pipes for sluice valves

34

-

-

... More
300x1.00m long DF pipes for flow meter

6

-

-

... More
350x1.00m long DF pipes for sluice valves

4

-

-

... More
350x1.00m long DF pipes for flow meter

10

-

-

... More
Deck foot bends,Semicircular

666.7

-

-

... More
DIDF TEE for air valves

1736.68

-

-

... More
Supply and delivery of PN 1.6 D.I D/F "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) confirming to IS 14846 latest amendment and Material of Construction (as per latest codes) as per Technical Specification of the Tender Document including cost and conveyance and stacking as per standards and as directed by Engineer-in-charge

-

-

-

... More
100mm dia Sluice Valves

48

-

-

... More
100mm dia Scour Valves

11

-

-

... More
150mm dia Sluice Valves

34

-

-

... More
150mm dia Scour Valves

5

-

-

... More
200mm dia Sluice Valves

23

-

-

... More
200mm dia Scour Valves

3

-

-

... More
250mm dia Sluice Valves

17

-

-

... More
300mm dia Sluice Valves

13

-

-

... More
350mm dia Sluice Valves

2

-

-

... More
400mm dia Sluice Valves

3

-

-

... More
Construction of Air Valve Chamber as per type design drawing with CC including, plastering, RCC cover slabs etc. including cost and conveyance of all material and all labour charges etc. complete as per S.S for finished item of work and as directed by the Engineer-in-Charge of the work and as per Technical Specification

-

-

-

... More
80 mm dia on 110 mm pipe

26

-

-

... More
80 mm dia on 160 mm pipe

22

-

-

... More
80mm dia 200 mm pipe

18

-

-

... More
80mm dia 250 mm pipe

15

-

-

... More
80mm dia 315 mm pipe

10

-

-

... More
80mm dia 355 mm pipe

1

-

-

... More
Lowering, keeping in position and fixing DI sluice valves (with cap / with hand wheel & reflex valves) including all labor charges and incidental charges and as per Technical Specification

-

-

-

... More
100mm distribution

48

-

-

... More
150mm distribution

36

-

-

... More
200mm distribution

23

-

-

... More
250mm distribution

17

-

-

... More
300mm distribution

13

-

-

... More
350mm distribution

2

-

-

... More
300 mm bulk flow meter

2

-

-

... More
350 mm bulk flow meter

5

-

-

... More
for scour

-

-

-

... More
100mm dia on 110mm and 160mm dia mains

11

-

-

... More
150mm dia on 200mm and 250mm dia mains

5

-

-

... More
200mm dia on 315mm and 355mm dia mains

3

-

-

... More
Labour charges for fixing Kinetic Air Valves with isolating Sluice valves, Double Air valves/ Air Cushion valve excluding cost of jointing materials such as bolts, nuts and rubber insertions etc., complete.

-

-

-

... More
80 mm dia on 150,250,315,355 mm pipes

55

-

-

... More
Construction of sluice and scour Valve Chamber as per type design drawing with CC including, plastering, RCC cover slabs etc. including cost and conveyance of all material and all labour charges etc. complete as per S.S for finished item of work and as directed by the Engineer-in-Charge of the work and as per Technical Specification

-

-

-

... More
100 mm distrubution

48

-

-

... More
150 mm dia for distrubution+2nos pressure regulating valves

44

-

-

... More
200mm dia for distrubution

23

-

-

... More
250mm dia for distrubution

13

-

-

... More
300mm dia for distrubution

13

-

-

... More
350mm dia for distrubution

2

-

-

... More
300mm dia bulk flow meter

2

-

-

... More
350mm dia bulk flow meter

5

-

-

... More
for scour

-

-

-

... More
100mm dia on 110mm and 160mm dia mains

11

-

-

... More
150mm dia on 200mm and 250mm dia mains

5

-

-

... More
200mm dia on 315mm and 355mm dia mains

3

-

-

... More
Manufacture, supply and delivery of Single Chamber DI Air Valve with Body and cover in Ductile Iron of grade SG 400/12 or equivalent grade as per I.S.3896-part2-1985 and subsequent revisions. All internal parts such as float, shell etc., all cover bolts, of stainless steel, and Gaskets and seals of EPDM food grade quality Epoxy powder coating (EP-P) inside and outside colour blue. Drilled as per IS:1538. PN16

-

-

-

... More
80 mm dia on 110 mm pipe

26

-

-

... More
80 mm dia on 160 mm pipe

22

-

-

... More
80mm dia 200 mm pipe

18

-

-

... More
80mm dia 250 mm pipe

15

-

-

... More
80mm dia 315 mm pipe

10

-

-

... More
80mm dia 355 mm pipe

1

-

-

... More
Lowering the C.I. Pipes, D.I. Pipes of all classes and fittings with flanged ends carefully into the trenches and laying them true to alignment and gradient including all sundries, but excluding conveyance from source of supply as per BIS No.3114/94.

-

-

-

... More
100 mm

573.1

-

-

... More
150mm

128.4

-

-

... More
200mm

93

-

-

... More
250mm

31

-

-

... More
300mm

3.2

-

-

... More
Jointing CI pipes, fittings and valves with flanged ends including cost of jointing materials such as bolts, rubber insertion, white lead including filling with water, with lead up to 500 meters and testing to required pressure complete and as per Technical Specification

-

-

-

... More
80mm dia

113

-

-

... More
100mm dia

673

-

-

... More
150mm dia

148

-

-

... More
200mm dia

110

-

-

... More
250mm dia

44

-

-

... More
300mm dia

6

-

-

... More
Cutting open B.T. road surface (as well as asphalt concrete upto 75 mm thick) including water bound macadam including all labor charges and as directed by the Engineer - in- Charge and as per Technical Specification

3380

-

-

... More
Cutting open C.C. Road surface including stacking of excavated materials for pipe line trench work including all labor charges and as directed by the Engineer - in- Charge and as per Technical Specification

6738

-

-

... More
Cutting the open Water Bound Macadam The rate including labour charges for cutting, incidental charges etc., complete as directed by the Engineer - in- Charge and as per Technical Specification

3374

-

-

... More
Collection, Supply and filling of Stone dust / Quarry spall from approved quarry to work site and stacking at work site for pre measurements including cost and convenyance of all material and all labour charges etc. complete for Trench Restoration

12600

-

-

... More
Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix M-30 (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nomonal reinforcement for Road restoration. for BT&CC roads etc., complete as per detailed specification and directed by the Engineer - in - Charge

1770

-

-

... More
Manufacture, supply and delivery at work site M.S.Pipe fabricated with 10mm thick MS plates confirming to IS 2062-1992 of grade A manufactured as per IS 3589-2001 in suitable lengths to suit the sit conditionse , in co-ordination with the concerned authorities as per approved drawings and directed by the Engineer-in –charge

-

-

-

... More
CAP Bill No: 2.2 Providing 15mm dia 6292 Nos New House service connections.

-

-

-

... More
Providing House service connections on HDPE mains a) 1 No.of MDPE PE 80 blue/PE100 black Electro Fusion Tapping Saddle (Flexifit-Top loading type with load bearing capacity of 1500N) Electro Fusion Tapping Saddle shall comply with BS EN 12201-3:2011, PN-12.5/PN-16 Rating and manufactured from virgin resin of PE-80/PE-100 having blue/black colour. Raw material must be WRAS Approved as per BS 6920 for effect on water quality intended for human consumption. b) 1 No. of regulating brass ferrule as per IS 2692 c) 2 No. of compression adaptor with one side compression end to suit ½” (20mm OD )MDPE pipe and other side with female threaded off-take with SS-304 material inserts of sizes ½” BSP threads, Body , Nut and cap of Polypropylene , Clip ring of POM(Acetylic resin) and “O” ring of NBR material, as per ISO 17885 Standards with pressure rating PN 16. d) 2 No. of Double compression elbow to suit ½” (20mm OD )MDPE pipe, Body , Nut and cap of Polypropylene , Clip ring of POM(Acetylic resin) and “O” ring of NBR material, as per ISO 17885 Standards with pressure rating PN 16. e)MDPE PE80 Blue Pipe of specified length as per ISO 4427 Rev 1. For conveyance of potable water .The pressure rating of ½” (20mm OD) will be PN16. Certificate for compliance of testing these fittings and pipe as per BS-6920 by designated laboratories to be produced. f) CP bibcock g) Geotagging of the HSC h) drilling of hoe in RCC / RR in compound wall i) holder clamps where ever required j) UPVC pipe for drain crossing and as per Technical Specification

-

-

-

... More
PROVIDING HOUSE SERVICE CONNECTIONS AT HOUSEHOLD SIDE (Minimum 4.0 Mts MDPE pipe)

944

-

-

... More
PROVIDING HOUSE SERVICE CONNECTIONS AT HOUSEHOLD OPPOSITE SIDE IN EARTHEN ROADS (Minimum 7.0 Mts MDPE pipe)

2202

-

-

... More
PROVIDING HOUSE SERVICE CONNECTIONS AT HOUSEHOLD OPPOSITE SIDE IN CC &BT ROADS (Minimum 7.0 Mts MDPE pipe)

3146

-

-

... More
Bill no 2.3 : TADEPALLI SCADA

-

-

-

... More
Near Electrical Substation (Zone-1, 850 KL, ELSR, 250mm), Near APSRTC Bus Stand (Zone-2, 1000 KL, ELSR, 250mm), Near Gandhi Mandiram Centre (Zone-3, 900 KL, ELSR, 250mm), Near Gandhi Mandiram Centre Park (Zone-3, 275 KL, ELSR, 250mm), MDO Office (Zone-4, 750 KL, ELSR, 250mm).

-

-

-

... More
Electromagnetic Flow Meters

-

-

-

... More
Supply, delivery, installation and integration of Electromagnetic flow meter with IP68 and as per ISO 9001:2008,meter tube should be SS304 material, CS flanges of PN10/PN16 rating liner - hard rubber/polyurethane with WRAS or NSF drinking water approval, electrodes - SS316, 2 measuring electrodes for measuring,1 ground elctrode,1 empty pipe detection, coil housing - SS304 fully welded construction for corrosion grade/painted steel with protective lacquering (corrosive protection, class up to C5-1) as per EN ISO-12944/carbon steel, IP68 protection, Accuracy +/- 0.5% of measured value inclusive of linearity, repeatability etc, grounding rings of SS316/304. Flow transmitter microprocessor based wall mounted, flow ranges of the meter (full flow range). The overall uncertainty of the calibration rig should be atleast three times better than the uncertainty of the full bore electromagnetic flow meter. The competent government authority such as FCRI/NABL must certify the test facility etc. The EMF must be integrated with local SCADA server and the reading shall be captured all times 24x7. The flowmeter values must be persistent and there is no loss of data. The meter shall have display panel for displaying the readings according. This item shall, including cost, conveyance, etc complete as directed by the departmental officers.

-

-

-

... More
300 mm Near Electrical Substation (Zone-1, 850 KL, ELSR, 315 Ø),

1

-

-

... More
300 mm Near APSRTC Bus Stand (Zone-2, 1000 KL, ELSR, 315Ø )

1

-

-

... More
300 mm Near Gandhi Mandiram Centre (Zone-3, 900 KL, ELSR, 315 Ø )

1

-

-

... More
300 mm Near Gandhi Mandiram Centre Park (Zone-3, 275 KL, ELSR, 315 Ø)

1

-

-

... More
350 mm Vivekananda Nagar (Zone-5, 500 KL, ELSR 355 Ø )

1

-

-

... More
Supply, delivery , installation of pressure transmitter with a pressure range of up to 16 bar and 64 bar for appropriate usages. Output: 4 to 20 mA, permissible temperature: -20°C to +70°C, IP65 rated with local display. For This item shall, including cost, conveyance, etc complete as directed by the departmental officers.

10

-

-

... More
Supply, delivery , installation of Data Logger with solar powered , battery backup of 5 days including SIM charges for 7 years, transmission rate shall be every 10 minutes cycle that can be configurable from 2 minutes upto 8 hours as needed.This unit shall have additional battery pack to power up ( 5 days backup) for the instruments connected to this item . The data collected from the instruments such as the bulk flow meter , preassure sensors , chlorine etc must be transmitted to the central SCADA Servers via the restfull web services hosted by the servers in the requred data format.

10

-

-

... More
Construction of CC masonry chambers with a openable MS hatch, with lock and key arrangement, steps arrangement, for Electromagnetic Flow meters, Butterfly valves as per pipe sizes including cost of cement, sand, bricks and other required material, including painting and suitable painting material, including labour charges. , Excavation and including wages. Complete as directed by the departmental officer.

-

-

-

... More
300mm

4

-

-

1

-

-

... More
Supply, installation , delivery and testing wall mounted ABS plastic enclosure based Online Chlorine Analyzer of Amphreometric or Potentiometric type. Specifications of Range: 0 to 5 mg/L free or total residual chlorine, Resolution 0.01 PPM, Accuracy: +/- 0.05 PPM or better, Cycle Time: 4 minutes, Inlet: Sample Temperature: 5 to 40 °C, operating Temperature: Range 5 to 60 °C. Local LCD Display to display the values. Output: 4-20 mA or 0-10 VDC to integrate into PLC if needed. PH Compensation must be Auto/Manual. All accessories that are required for the must be provided.This item shall include the cost of consumables for the defect liability period of 2 years.

1

-

-

... More
Supply, installation , delivery and testing of wall mounted Turbidity Analyzer make of HACH/ ABB/ Forbes Marshall with specifications of Range 0.00-500.0(NTU/FNU), Operating Temperature : 0 – 60 °C, Displayed Resolution : 0.01 (0.00-19.99), 0.1(20.0-500.0)NTU/FNU, Response Time : Initial response in 1 minute, 15 seconds for a full-scale step change Signal, Sample, Temperature : 0 to 50°C (32 to 122°F), Output 4-20mA to integrate into PLC if needed. Local LCD Display to display the values . This item includes the cost of consumables for the defect liability period of 2 years.

1

-

-

... More
Supply, delivery , installation of Data Logger with solar powered , battery backup of 5 days including SIM charges for 7 years, transmission rate shall be every 10 minutes cycle that can be configurable from 2 minutes upto 8 hours as needed.This unit shall have additional battery pack to power up ( 5 days backup) for the instruments connected to this item . The data collected from the instruments such as the bulk flow meter , preassure sensors , chlorine etc must be transmitted to the central SCADA Servers via the restfull web services hosted by the servers in the requred data format.

1

-

-

... More
Supply delivery and installation of Protection MS grills with lock and key for equipment, instrumentations where ever necessary. This item shall, including cost, conveyance, etc complete as directed by the departmental officers.

1

-

-

... More
Supply , Delivery and installation of manually adjusted preassure reducing valves , accurate pressure ratings. Maximum Upstream Pressure : 20 bar ; Maximum Working Temperature : 80°C. These PRV must be installed at key inlets points of the service reservior.

-

-

-

... More
Near Electrical Substation (Zone-1, 850 KL, ELSR, 315 Ø),

-

-

-

... More
150 mm

1

-

-

... More
250 mm

1

-

-

... More
Near APSRTC Bus Stand (Zone-2, 1000 KL, ELSR, 315 Ø )

-

-

-

... More
100 mm

4

-

-

... More
200 mm

1

-

-

... More
250 mm

1

-

-

... More
Near Gandhi Mandiram Centre (Zone-3, 900 KL, ELSR, 315 Ø )

-

-

-

... More
100 mm

1

-

-

... More
200 mm

1

-

-

... More
Vivekananda Nagar (Zone-5, 500 KL, ELSR 355 Ø )

-

-

-

... More
250 mm

1

-

-

... More
300 mm

1

-

-

... More
Supply delivery and comissioning the Handheld Devices for meter reading and bill printing. The power back up of this item shall be for 24 hours , android based with on line and offline capabilities, portable credit/debit card machine reader integrated. The connectivity to the central server will be via rest full services with highest security standards , in json data format as directed by the departmental offer. The bill generation , collection shall reflect across the entire system and the acknoledgement of the receipt shall be sent by SMS to the consumer. SIM charges for 7 years shall be provided. This item shall include the cost of consumables for the defect liability period of 2 years.

5

-

-

... More
Meter Intergations with server

1

-

-

... More
Supply, testing installation and commissioning of command control: Reputed / Branded Hardware servers (2 nos) with 8GB RAM and 1TB Hard Disk including for operating system server license CentOS/Lunix , Windows OS, key board mouse with 20" LED monitor, Routers, firewall, bill printer , as required for running the software and internet broad band connection with static IP for for 84 months . 2 nos desktop with windows operating system with 8GB RAM and 1TB Hardisk, key board mouse and 20" LED monitor , 3 Nos work station with 3 chairs for each work station , racks for servers , network wiring , power wiring , etc . This item shall, including cost, conveyance , warrenty for 2 years , complete as directed by the departmental officers.

1

-

-

... More
Supply, testing and commissioning of 55" LED monitor with Ethernet/HDMI/VGA/WIFI with waranty for 2 years

1

-

-

... More
Software shall have modules such as Consumer master , grievence , billing , reports , SMS integration , Access log module, online payment module , consumer logins , metering details , dash board , with authentication and authorisation module , issue tracker , accounting and finance module. The soft ware shall expose restfull web services for further/future integrations with other software. The database, web-server shall be open source, license free, portable with all internationally accepted security standards. Authorisation and user access control shall be implemented for the applications mentioned. The application/software shall provide Restful Web Service interface with JSON data format so that it can be integrated to other centralised software and the Android application. All the data received from the instruments and meters shall be stored in database for a period of 4 years and reports shall be retrieved on demand. The data shall be integrated to the SCADA server as directed by the deparmental officer.

1

-

-

... More
Printer - 3 in one on color printer with refillable ink bank

1

-

-

... More
Supply, Delivery and Installation of 1600VA UPS with solar panels, battery enclosures with doors along with racks, to provide 40 hours battery backup calculated at 50% load. The solar panels should to charge the battery to full capacity in 7 hours of sunshine. As per relevant specification amended time to time for single phase input with input circuit breakers provided protection, sine wave from with sealed battery, maintenance free, recharge time conform to standards. The Batteries shall be of VLRA Type. This item shall, including cost, conveyance, etc complete as directed by the departmental officers.

1

-

-

... More
AMR Ultrasonic / Electromagnetic Water Meters

-

-

-

... More
Supply, delivery, installing, satisfactory testing and commissioning of domestic Battery operated electronically compatible AMR Ultrasonic or AMR Electromagnetic Water Meters from 15 mm to 40 mmWater Meters having No moving parts in contact with water with body made up of brass or composite materials confirming to ISO along with manufacturing test certificate and Guarantee certificate with Battery life of min. 10 years with GSM /GPRS/ RF Technology for communication to server with PC Software via handheld reader or directly, including all material required for fixing, labour & giving satisfactory leak proof test etc Complete with poly-propylenemeter box. General Specifications: Meter should be battery operated with no moving parts, low pressure loss. Display: 8 digit LCD, Protection class IP 68 , Operating temperature 10 C to 55 C deg. , Accuracy up to +/- 2% and unaffected by Operating temperature , Pressure : PN 1.6 MPa, power supply : 3.1 to 3.7 VDC lithium battery with minimum life of more than 10 years. Flow Measurement Range 1 to 3000L/H, Warrantyrequired for10years. Memory built-in and should have storage for at least 12 months with daily / monthly accumulated totalised data with time and date should be available. It should be able to access memory of the meter through serial communication. The readings should be obtainable by either walkby or stationery pole with specific range or drive by on Android device. The acceptance / routine tests shall be either conducted by M/s. Fluid Control Research Institute, Palghat, Kerala or any of the Laboratories approved by the National Accreditation Board for calibration Laboratories (NABL) or installation at site etc. complete includingpoly-propylene box for keeping the meter. Including all charges excluding tax

6292

-

-

... More
CAPEX No: 2.4 Providing for Implementation of Environmental Management Plan in the estimate for Naidupeta Nagara Panchayat

-

-

-

... More
I. Monitoring Costs : Construction Phase (Two years)

-

-

-

... More
Air Quality Monitoring ( 5 Monitoring station) once in a month for three seasons during the construction period at distribution network and as per Standard Specifications.

18

-

-

... More
Noise level Monitoring ( 5 Monitoring station) once in a month for three seasons during the construction period distribution network as per Standard Specifications.

18

-

-

... More
Water Quality Monitoring surface / ground (6 Monitoring station) once in a month for three seasons during the construction period distribution network as per Standard Specifications.

24

-

-

... More
II. Monitoring costs : Operation Phase ( One year)

-

-

-

... More
Air Quality Monitoring (5 Monitoring stations) twice in a year at Intake well, GLBR,WTP, ELSRs & Raw & clear water pipe lines and distribution network) as per Standard Specifications.

12

-

-

... More
Noise level Monitoring ( 5 Monitoring stations) twice in a year at at Intake well, GLBR,WTP, ELSRs & Raw & clear water pipe lines and distribution network as per Standard Specifications.

12

-

-

... More
Water Quality Monitoring ( 6 Monitoring Locations) twice in a year at Intake well, GLBR,WTP, ELSRs & Raw & clear water pipe lines and distribution network as per Standard Specifications.

16

-

-

... More
Tree cutting

60

-

-

... More
II. Compensatory plantation and three years maintenance (Compensatory afforestation ratio is 1:5) as directed by the Engineer - in - Charge

120

-

-

... More
III. Sprinkling of water with 5000 Litres capacity tankers once in a day for 600 days (excluding rainy days) as directed by the Engineer - in - Charge

600

-

-

... More
Health checkups and free medical distribution

1

-

-

... More
Awareness program/training

1

-

-

... More
Providing Green Belt Development and Maintenance

1

-

-

... More
hiring of two vehicles during construction period

48

-

-

... More
OPEX -Operation & Maintance to be executed by concerened ULB's

-

-

-

... More
A) PERSONAL (For 7 Years period )

-

-

-

... More
Valve Operator/Turn Cocks

162

-

-

... More
Helpers for Distribution

252

-

-

... More
Chlorine gas ( 3 mg/lit) for disinfection

-

-

-

... More
1st Year

1

-

-

... More
2nd year

1

-

-

... More
3rd Year

1

-

-

... More
4th Year

1

-

-

... More
5th Year

1

-

-

... More
6th Year

1

-

-

... More
7th Year

1

-

-

... More
For 7 years

25276.56

-

-

... More
Alum requirement at 15 mg/lit

-

-

-

... More
1st Year

1

-

-

... More
2nd year

1

-

-

... More
3rd Year

1

-

-

... More
4th Year

1

-

-

... More
5th Year

1

-

-

... More
6th Year

1

-

-

... More
7th Year

1

-

-

... More
For 7 years

30641.2

-

-

... More
Hiring of Vehicles 1 No.

84

-

-

... More
Providing qualified diploma personal with minimum 2 Years of experience in Computers/ bulk flow meters and instruments maintainence etc. The member task is to maintain the system , including daily routine checks of all field instruments etc as directed by the departmental officers ( 2 techinican x 366 days x 7 years = 5124 days ) inc ESI, PF and other statutory levies as directed by the departmental officers

5124

-

-

... More
Service Charge for bill generations , collections and maintainence for 6292 consumers x 12 months x 7 years = 703248 . This item includes cost of consumables .

528528

-

-

... More
Distribution Network - Laying distribution lines for Gorantla,Reddypalem, Adavi Takkellapadu, Pedapalakaluru, Nallapadu, Ankireddypalem, Etukuru, Budampadu, Pottur & Chowdavaram (Guntur Municipal Corporation)

-

-

-

... More
Cutting open BT road surface (as well as asphalt concrete upto 75 mm thick ) including water bound macadam and stacking of excavated materials for pipe line trench work. as directed by the departmental officers.

9301

-

-

... More
Cutting open C.C. road surface including stacking of excavated materials for pipe line trench work. as directed by the departmental officers.

2188.37

-

-

... More
Cutting open water bound macadam road including soiling for pipe line trench work. as directed by the departmental officers.

33.09

-

-

... More
Earthwork in excavation for Pipe Line as per drawing and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material by Mechanical Means.

68215.14

-

-

... More
Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308). Ordinary rock (not requiring blasting)-Mechanical Means-Upto 3 m depth

4872.51

-

-

... More
Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 304 MORTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Lines by manual means.

19490.04

-

-

... More
Excavation in Hard rock (blasting prohibited) Upto 3 m depth including 1.5 m depth in hard rock : Earthwork excavation in hard rock such as sheet rock and boulders in habitant areas where conventional blasting can not be done for pipe line trenches, including all incidental and operational charges etc., complete.

4872.51

-

-

... More
Earthwork excavation for structures in all types of soil as per drawing and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH. for Sumps,Thrust blocks, Chambers and Man Holes etc. by manual means.

50.77

-

-

... More
Barricading, hoarding, lighting and watching etc., for water supply and sewerage works for trenches of depths upto 6’-0” (2 Meter) below G.L

24471

-

-

... More
Supply and filling with Sand complying with standard specifications including cost and conveyance of sand to site to work labour charges watering tamping, ramming etc complete and as directed by the Engineer-in-Charge of the work and as per Technical Specification

8659.17

-

-

... More
Manufacture, supply, delivery of HDPE pipes conforming to IS 4984 - 1995 including transportation to any where in AP , Excise duty, sales tax etc., complete ( Supply upto 90mm dia in coil & above 90mm dia strightin length in 6M) (6 Kg/Sq Cm)

-

-

-

... More
110mm dia HDPE 6 Kg/cm2 pipe

73240

-

-

... More
160mm dia HDPE 6 Kg/cm2 pipe

9391

-

-

... More
Lowering, laying, jointing & testing of HDPE Pipe line laid to true alignment and gradiant to hydraulic field test pressure per IS code including cost of water with minimum water lead of 500m (Labour charges only) Outer dia of pipes in mm.

-

-

-

... More
110mm dia HDPE 6 Kg/cm2 pipe

73160

-

-

... More
160mm dia HDPE 6 Kg/cm2 pipe

9380

-

-

... More
Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to any where in A.P, Central excise duty, sale tax etc., complete

-

-

-

... More
Bends for

-

-

-

... More
110mm dia HDPE 6 Kg/cm2 pipe

397

-

-

... More
160mm dia HDPE 6 Kg/cm2 pipe

51

-

-

... More
End caps for

-

-

-

... More
110mm dia HDPE 6 Kg/cm2 pipe

106

-

-

... More
160mm dia HDPE 6 Kg/cm2 pipe

14

-

-

... More
Long neck pipe ends for

-

-

-

... More
110mm dia HDPE 6 Kg/cm2 pipe

159

-

-

... More
160mm dia HDPE 6 Kg/cm2 pipe

20

-

-

... More
MS flanges to suit HDPE pipes for

-

-

-

... More
110mm dia HDPE 6 Kg/cm2 pipe

232

-

-

... More
160mm dia HDPE 6 Kg/cm2 pipe

40

-

-

... More
Tees for

-

-

-

... More
110mm dia HDPE 6 Kg/cm2 pipe

132

-

-

... More
160mm dia HDPE 6 Kg/cm2 pipe

17

-

-

... More
Centrifugally cast (spun) Ductile Iron pressure pipes for water, Gas and sewage with socket spigot ends confirming to I.S.: 8329/2000 in standard working lengths of 4,5,5.5 & 6 meterfor classification K7 suitable for push on joint ( Rubber Gasket D jointing) with cement mortar lining inside the pipes with out side Zinc coating. Rates are including Transportation and ST etc,. complete.

-

-

-

... More
100 mm dia DI K7 pipe for road crossings

6311

-

-

... More
150 mm dia DI K7 pipe for road crossings

833

-

-

... More
200 mm dia DI K7 pipe

12210

-

-

... More
250 mm dia DI K7 pipe

13475

-

-

... More
300 mm dia DI K7 pipe

5120.5

-

-

... More
350 mm dia DI K7 pipe

1023

-

-

... More
500 mm dia DI K7 pipe

891

-

-

... More
Manufacture as per bis 12820/89 with S.B.R. quality rubber confirming to BIS: 5382/85, supply and delivery of rubber gaskets suitable for C.I/ D.I. S/S pipes anywhere in A.P. including cost of material, loading, incidental handling with companys standard packing, transportation, unloading & stacking, central excise duty but excluding VAT etc., complete.for 5.50 m working length pipes

-

-

-

... More
100 mm dia DI K7 pipe for road crossings

1147

-

-

... More
150 mm dia DI K7 pipe for road crossings

151

-

-

... More
200 mm dia DI K7 pipe

2220

-

-

... More
250 mm dia DI K7 pipe

2450

-

-

... More
300 mm dia DI K7 pipe

931

-

-

... More
350 mm dia DI K7 pipe

186

-

-

... More
500 mm dia DI K7 pipe

162

-

-

... More
Lowering C.I. / D.I. Pipes (all classes) and specials (fittings) with s/s ends carefully into trenches and laying them true to alignment and gradient including all sundries but excluding cost and conveyance of pipes from source of supply (Ref to specifications. BIS No.3114/1994)

-

-

-

... More
100 mm dia DI K7 pipe for road crossings

6311

-

-

... More
150 mm dia DI K7 pipe for road crossings

833

-

-

... More
200 mm dia DI K7 pipe

12195

-

-

... More
250 mm dia DI K7 pipe

13458

-

-

... More
300 mm dia DI K7 pipe

5112

-

-

... More
350 mm dia DI K7 pipe

1018

-

-

... More
500 mm dia DI K7 pipe

887

-

-

... More
Jointing the C.I. Pipes, D.I. Pipes & fittings with Rubber Gasket, excluding the cost of the gasket but including all sundries filling with water with a water lead upto 500 m and testing to required pressure etc., complete as per BIS No.3114/85.

-

-

-

... More
100 mm dia DI K7 pipe for road crossings

1147

-

-

... More
150 mm dia DI K7 pipe for road crossings

151

-

-

... More
200 mm dia DI K7 pipe

2217

-

-

... More
250 mm dia DI K7 pipe

2447

-

-

... More
300 mm dia DI K7 pipe

929

-

-

... More
350 mm dia DI K7 pipe

185

-

-

... More
500 mm dia DI K7 pipe

161

-

-

... More
Manufacture, supply and delivery of centrifugally cast (spun ) ductile iron fittings conforming to IS No. 9523/2000 having dimentions as per table. , zinc coated externally with inside mortor lining (with finishing as per class 13/IS 9523/2000 as per Code No 1 ) including transportation, taxes and duties etc.

-

-

-

... More
Double Socket flange Tee

12726

-

-

... More
Flanged Sockets - Up to 500mm dia

3581

-

-

... More
Flanged Sockets - above 500mm dia

8098

-

-

... More
Flanged Spigots - Up to 500mm dia

9220

-

-

... More
Double Socket Bends

6832

-

-

... More
Manufacture, Supply and delivery of DI D/F Gate Valves (Soft Seated) Resilient seated soft sealing gate valves (Sluice valves) with body bonnet of ductile cast iron of grade GGG40/ SG 400/12 or equivalent grade as per I.S.3896-part2-1985 and subsequent revisions, wedge fully rubber lined with EPDM food grade quality and seals of NBR and the valves should be of vacuum tight and 100% leak proof with face to face dimensions as per BS5163-89/IS14846-2000/DIN 3202 F 4. All the valves should be with Electrostatic powder coating both inside and outside pocket less body passage. Drilled as per IS:1538.

-

-

-

... More
100mm dia Sluice Valves (including Scour Valves)

116

-

-

... More
150mm dia Sluice Valves (including Scour Valves)

20

-

-

... More
200mm dia Sluice Valves (including Scour Valves)

23

-

-

... More
250mm dia Sluice Valves

21

-

-

... More
Manfacture, Supply and delivery of Cast Steel D/F Butter fly Valves conforming to IS :13095/1991 manually heavy duty Gear operation, including duty and sale tax etc., complete -PN-16 class

-

-

-

... More
300mm dia Sluice Valves

11

-

-

... More
350mm dia Sluice Valves

3

-

-

... More
500mm dia Sluice Valves

2

-

-

... More
Lowering, keeping in position and fixing C.I. sluice valves (with cap / with hand wheel & reflex valves) excluding cost of bolts, nuts, rubber insertion, sluice valve and tail pieces

-

-

-

... More
100mm dia Sluice Valves (including Scour Valves)

116

-

-

... More
150mm dia Sluice Valves (including Scour Valves)

20

-

-

... More
200mm dia Sluice Valves (including Scour Valves)

23

-

-

... More
250mm dia Sluice Valves

21

-

-

... More
300mm dia Sluice Valves

11

-

-

... More
350mm dia Sluice Valves

3

-

-

... More
500mm dia Sluice Valves

2

-

-

... More
Jointing CI pipes, fittings and valves with flanged ends including cost of jointing materials such as bolts, rubber insertion, white lead including filling with water, with lead up to 500 meters and testing to required pressure complete. (Reference to specifications. BIS No.3114/1994.)

-

-

-

... More
100mm dia Sluice Valves (including Scour Valves)

232

-

-

... More
150mm dia Sluice Valves (including Scour Valves)

40

-

-

... More
200mm dia Sluice Valves (including Scour Valves)

46

-

-

... More
250mm dia Sluice Valves

42

-

-

... More
300mm dia Sluice Valves

22

-

-

... More
350mm dia Sluice Valves

6

-

-

... More
500mm dia Sluice Valves

4

-

-

... More
Manufacture, supply and delivery of Single Chamber DI Air Valve with Body and cover in Ductile Iron of grade SG 400/12 or equivalent grade as per I.S.3896-part2-1985 and subsequent revisions. All internal parts such as float, shell etc., all cover bolts, of stainless steel, and Gaskets and seals of EPDM food grade quality.S Epoxy powder coating (EP-P) inside and outside colour blue. Drilled as per IS:1538.

-

-

-

... More
50mm dia Air valve

12

-

-

... More
80mm dia Air valve

1

-

-

... More
Labour charges for fixing Kinetic Air Valves with isolating Sluice valves, Double Air valves/ Air Cushion valve excluding cost of jointing materials such as bolts, nuts and rubber insertions etc., complete.

-

-

-

... More
50mm dia Air valve

12

-

-

... More
50mm dia Air valve

1

-

-

... More
Dismantling Stone Masonry as per Technical Specification Clause 202 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH - Rubble Stone Masonry in Cement Mortar.

366

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH

-

-

-

... More
Cement Concrete M15 & M20 (Manual means)

98

-

-

... More
Reinforced Cement Concrete and prestressed Concrete (Manual means)

82

-

-

... More
Laying of VCC 1:4:8 using 40 mm graded SS 5 HBG m/c metal and OPC coarse and fine aggregate including cost and conveyance of all materials and labour charges, machine mixing , vibration,laying in position, curing etc., complete as per the Technical Speciifcation.

5.68

-

-

... More
Laying of VCC M-30 (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work without nomonal reinforcement ( for Road restoration.)

298.72

-

-

... More
Providing temporary water supply house service connections with ISI mark GI pipes and fittings so as not to disturb the existing water supply connections during earth work excavation for trenches and during laying of new mains in including cost and conveyance of all materials, labour charges and with all incidental and operational charges etc., complete.

612

-

-

... More
Supply and fixing of precast RCC chambers having the size of 910mm at bottom and 530mm at top with tapers along with FRC cover and frame, laying in CC (1:2:4) prop including cost of material, labour charges, curing, conveyance etc., complete as per standard specifications and standard drawings..

159

-

-

... More
Construction of VRCC valve chamber as per type design with Earth work, 0.1 Mts sand filling, 0.1 M CC (1:4:8) bed, 0.2 mts thick sidewall and cover slab thickness of 0.15 VRCC M25 grade and plastering in CM (1:3) including cost & conveyance of all materials, labour charges, formwork, machine mixing, vibration, curing etc.complete including cost of Plastering, reinforcement & its fabrication charges and as per Technical Specification (For 1.5X1.2X1.4 Mts size)

-

-

-

... More
For 250mm dia to 350 Sluice valves

35

-

-

... More
For 400mm dia to 600 Sluice valves

2

-

-

... More
Carting away the surplus excavated material i.e.Earth and Rubble from the site to a suitable distance of about 10.00 Km including loading, unloading , conveyance charges and dumping the carted material at the contractors cost, labour charges, all leads & lifts and other incidental and operational charges etc., complete.

8807

-

-

... More
Dewatering pipe line trenches etc, duly bailing out water from the pipe line trenches with oil engine driven pumpsets, including hire charges, fuel charges and wages for Driver and Helper and all other incidental and operational charges including suction and delivery hose, lead of drain in to natural drain etc, complete.

15360

-

-

... More
Cutting C.I./ DI / MS Pipes without water in mains where ever required (.Dia of pipes in mm.)

-

-

-

... More
100 mm dia DI K7 pipe for road crossings

25

-

-

... More
150 mm dia DI K7 pipe for road crossings

3

-

-

... More
200 mm dia DI K7 pipe

49

-

-

... More
250 mm dia DI K7 pipe

54

-

-

... More
300 mm dia DI K7 pipe

20

-

-

... More
350 mm dia DI K7 pipe

4

-

-

... More
500 mm dia DI K7 pipe

4

-

-

... More
Manufacture, supply and erection of air valve guard cabins of size 0.90 x 0.90 x 0.90 m made with 4 numbers vertical and 8 numbers horizontal MS angles of size 75 x 75 x 6mm and 10mm dia MS square bars fixed at 7.50cm c/c with door and locking arrangements as per approved drawing and as directed by the departmental officer and painting both sides with anti-corrossive paint two coats over one coat of primary coat including cost of all material, fabrication, welding, transportation etc., complete

13

-

-

... More
Providing and fixing 1.50 m long 16mm dia cold twisted deformed steel Anchor rods with 0.75m length driven in to the hole drilled in bed rock and remaining length embedded in concrete/ masonry including cost of all materials, machinary, labour, drilling and cleaning hole, driving Anchore rod, grouting hole with thick cement slurry etc, with intial lead up to 50m and all lifts.

488

-

-

... More
Railway crossing/Road crossing/Canal crossing by adopting trenchless technology tunneling work through specialized pipe jacking method by erecting the equipment to true to the alignment and gradient, by hydraulic pipe jacking technique complete including tunneling, excavation in all types of soils including hard rock and construction of RCC chambers suitable to casing pipe pits, and conveyance charges of machinery and other required materials but excluding cost of encasing pipe, in co-ordination with the concerned authorities as per approved drawings and directed by the Engineer-in – Charge.

-

-

-

... More
400mm dia pipe - for NH / SH crossing

70

-

-

... More
for crossing internal roads by TLT ( rate as per quotation)

105

-

-

... More
Manufacture, supply and delivery of Cast Iron pipes and fittings (spls.) conforming to IS. No. 7181/1986, 5531/1988, 3950/1979 and CID. joints confirming to IS No.8794/1988 at site of work anywhere in A.P.including, loading, unloading, transportation to site of work stacking at site transit risk and package, excluding taxes and duties.

8886.48

-

-

... More
Shifting and errection of electric poles, telephone poles coming across the proposed alignment of the pipeline.

49

-

-

... More
Shifting of under ground cables coming across the proposed alignment of the pipeline including Earth work excavation, shifting of cables and backfilling etc, complete.

-

-

-

... More
Cables

3059

-

-

... More
Provision towards Road cutting charges payble to R&B Dept.( Rate vide, E-N-C,m R & B- circular memo.No.13237-RC/TA-15/AEE1.2006, Dt.15-11-2006 & Railway line crossing charges payble to Railway Dept.

-

-

-

... More
Cutting of BT Road

1412

-

-

... More
Cutting of Berms

64

-

-

... More
Supply and filling with Crusher Stone Dust complying with standard specifications including cost and conveyance of Crusher Stone Dust to site to work labour charges watering tamping, ramming etc complete and as directed by the Engineer-in-Charge of the work ( for Road restoration.)

12086.34

-

-

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405 MORD / 404 MORTH. For compacted thickness of 75 mm.

697.58

-

-

... More
Laying of VCC 1:4:8 using 40 mm graded SS 5 HBG m/c metal and OPC coarse and fine aggregate including cost and conveyance of all materials and labour charges, machine mixing , vibration,laying in position, curing etc., complete as per the Technical Speciifcation.

2389.01

-

-

... More
Laying of VCCM-30 (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work without nomonal reinforcement as per the Technical Speciifcation ( for Road restoration.)

3100.97

-

-

... More
CAP Bill No: 10.4 Providing for Implementation of Environmental Management Plan in the estimate for Piduguralla Municipality

-

-

-

... More
Monitoring Costs : Construction Phase (Two years)

-

-

-

... More
Air Quality Monitoring (3 Monitoring station) once in a month for three seasons during the construction period at off take chamber,ELSR's, Raw/Clear Pipe Line & Distribution network

18

-

-

... More
Noise level (3 Monitoring station) once in a month for three seasons during the construction period at off take chamber,ELSR's, Raw/Clear Pipe Line & Distribution network

18

-

-

... More
Water Quality Monitoring surface / ground (3 Monitoring station) once in a month for three seasons during the construction period at off take chamber,ELSR's, Raw/Clear Pipe Line & Distribution network

30

-

-

... More
Monitoring Costs : Construction Phase (one years)

-

-

-

... More
Air Quality Monitoring (3 Monitoring station) once in a month for three seasons during the construction period at off take chamber,ELSR's, Raw/Clear Pipe Line & Distribution network

12

-

-

... More
Noise level (3 Monitoring station) once in a month for three seasons during the construction period at off take chamber,ELSR's, Raw/Clear Pipe Line & Distribution network

12

-

-

... More
Water Quality Monitoring surface / ground (3 Monitoring station) once in a month for three seasons during the construction period at off take chamber,ELSR's, Raw/Clear Pipe Line & Distribution network

20

-

-

... More
Tree cutting

45

-

-

... More
Compensatory plantation and three years maintenance (Compensatory afforestation ratio is 1:5).

90

-

-

... More
Sprinkling of water once in a day for two years (excluding rainy days) 600 days

600

-

-

... More
Greenbelt development and maintenance in the surroundings / Buffer zone

1

-

-

... More
Health checkups and free medical distribution

1

-

-

... More
Awareness program/training

1

-

-

... More
Hiring for 2 No's Vechicles for 24 Months during ececution period including hire charges of vechicle, diesel, lubrication, driver charges, repairs and all incidental charges

48

-

-

... More
Providing 15mm dia House Service Connection as per standard specification including the cost of the materials like Clamp Saddle,Ferrule Tapping Saddle confirming to I.S stadard manufactured from virgin resin of PE-80 , Compression Elbows, MDPE PE100 Pipe including lowering, laying and jointing including earth work excavation,UPVC Casing pipe with Two Calmps for drain crossings,Drilling of Holes for RR Masonary and CC Walls , Boring&Tunneling below CC &BT Roads ,saw cutting of groves in CC Roads and refilling the pipe line trench after laying the pipe line and including cost of 15mm dia meter of BIS standard etc complete as directed by departmental officer for finished item of work.( CC Roads and BT Roads should not be distrubed)

4900

-

-

... More
Supply,delivery,installing,testing and commissioning domestic Battery operated, with prefrabicated meter box , “B” class, AMR Ultrasonic Water Meters having No moving part in contact with water, with magnetically sealed coupled and hermetically sealed register, with fully body made up of brass, confirming to ISO 4064 along with manufacturing test certificate and Guarantee certificate with Battery life of min. 7 years with GSM / RF Technology for communication to server with PC Software including all material required for fixing, labour & giving satisfactory leak proof test etc Complete. General Specifications : Meter should be battery​ operated with no moving parts, low pressure loss, dry type as per ISO 4064 / OIML R49 and certification as per FCRI / MID.Display: 8 digit LCD, Protection class IP 68 , Ambient 50 deg. , Pressure : PN - 1.6, POWER SUPPLY : 3.6 lithium battery with minimum life of 10 years. Warranty included for 7 years . Memory built-in and should have storage for at least 12 months with daily / monthly accumulated totalised data with time and date should be available. It should be able to access memory of the meter through serial communication. The readings should be obtainable by either walkby or drive by on Android device. The acceptance / routine tests shall be either conducted by M/s. Fluid Control Research Institute, Palghat, Kerala or any of the Laboratories approved by the National Accreditation Board for calibration Laboratories (NABL) or installation at site etc complete..including all charges excluding tax.

4900

-

-

... More
Providing SCADA System including all accessories

-

-

-

... More
Providing SCADA System including all accessories

1

-

-

... More
OM 1.1: Manning, Operation and Maintenance of Guntur Municipal Corporation Merged villages Water Supply Improvement Scheme for 7 years for distribution

-

-

-

... More
A)The quantities given here are those up on which the lump sum cost of the work is based, but they are subject to alterations, omissions, deductions or additions as provided for in the conditions of tahe contract and do not necessarily show the actual quantities of work to be done. The unit rates noted below are those governing payment for extras or deductions or omissions according to the conditions are set forth in the P.S. to APDSS and other conditions or specifications of the contract.

-

-

-

... More
B) It is to be expressed understood that the measured work is to be taken net (not withstanding any custom or practice to the contrary) according to the actual quantities placed and finished according to tahe drawings or as may be ordered from time to by the Superintnding Engineer (PH) West Circle, Hyderabad and the calculated by measurement or weight at the respective prices with out any additional charges for any necessary or contingent works connected there with. The rates quoted are for works in site and complete in every respect.

-

-

-

... More
Personal required for operating Valves in distribution lines

-

-

-

... More
Valve Operator/Turn Cocks (24 nos x12 monthsx5years)

540

-

-

... More
Helpers for Distribution (24 nos x12 monthsx5years)

600

-

-

... More
Taxes ( EPF @ 13.61%+4.75% ESI ) on personal for 1 year

-

-

-

... More
Repairs to pumpsets & Water pipe lines ( for Five years )

-

-

-

... More
iv)Replacement of glands of sluice valves

15

-

-

... More
v) Replacements of balls of Air valves

15

-

-

... More
Provision towards purchase pipe jointing materials, etc

1

-

-

... More
Repairs to pumpsets & Water pipe lines ( for Five years )

-

-

-

... More
Service Charge for bill generations , collections and maintainence for 3000 consumers x 12 months x 7 years = 252000 . This item includes cost of consumables .

252000

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.