Ministry Of Road Transport And Highways Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Ministry Of Road Transport And Highways - MORTH Tender
Civil And Construction
Consultancy Services
Civil And Architectural Services
Eprocure
Opening Date27 Feb 2024
Closing Date15 Apr 2024
Tender AmountRefer Documents
Costs
EMD
0Document Cost
₹ 5,900Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MoRTH_797797_1Bid Award Id
ViewTender No
RW/NH-12014/03/2023 24/AP/Z-S-ITender Authority
Ministry Of Road Transport And Highways ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Bridge/Structural Engineer
24
-
-
... More
Senior Pavement Specialist
18
-
-
... More
Senior Quality cum Material Expert
18
-
-
... More
Road Safety Expert
12
-
-
... More
Sub-Professional Staff
-
-
-
... More
Quantity Surveyor cum Survey Engineer (01 Nos)
33
-
-
... More
Assistant Highway Engineer-1 (18+60)
78
-
-
... More
CAD Expert (1 No) (3+2)
5
-
-
... More
Assistant Bridge Engineer (01 Nos)
18
-
-
... More
Assistant Quality cum Material Engineer (01 Nos)
18
-
-
... More
Horticulture cum Landscaping Expert (1 No) (4+12)
16
-
-
... More
Support Staff (inclusive of per diem allowance)
-
-
-
... More
Office Manager (1 Nos) (1*18+ 1*60)
78
-
-
... More
Accountant cum Cashier (1 Nos) (18+60)
78
-
-
... More
Steno cum Computer Operator (1 Nos) (1*18+ 1*60)
78
-
-
... More
Office Boy (1 Nos) (1*18+ 1*60)
78
-
-
... More
Transportation (Fixed Costs)
-
-
-
... More
Scorpio/Bolero or equivalent (not more than 03years old) (18+9) Rate per month
27
-
-
... More
Swift desire/ Ford Aspire or equivalent (not more than 03 years old) [ (1*18)+(1x60)]
78
-
-
... More
Duty Travel to Site(Fixed Costs): Professional and Sub-Professional Staff. The employer may require the key personnel to visit the Employer's Site Offices/Regional Office. The quoted amount against remuneration should include travel fare (including Hotel Charges,travel costs etc. complete
-
-
-
... More
For 20 round trip to Employer's Head Office
20
-
-
... More
For 20 round trip to Employer's regional office.
20
-
-
... More
Office Rent (Fixed Costs) The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc. (Rate per Month)
-
-
-
... More
During Construction period (1 Nos) 1*18
18
-
-
... More
During Maintenance /DLP period (1 No) -1*60
60
-
-
... More
Office Supplies, Utilities and Communication (Fixed Costs), Rate per Month
-
-
-
... More
Office Supplies during construction period
18
-
-
... More
Office Supplies during Maintenance /DLP period
60
-
-
... More
Drafting Supplies during construction period
18
-
-
... More
Drafting Supplies during Maintenance /DLP period
60
-
-
... More
Computer Running Costs during construction period
18
-
-
... More
Computer Running Costs during Maintenance /DLP period (1*60=60)
60
-
-
... More
Domestic and International Communication during construction period
18
-
-
... More
Domestic and International Communication during Maintenance /DLP period (1*60=60)
60
-
-
... More
Office Furniture and Equipment (Rental)
Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input) fax machine, PCs(5 No., Intel Core 2 Duo E8300, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows Vista Business, pre-loaded anti-virus etc.), laser printers (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc.,
-
-
-
... More
During Construction period
18
-
-
... More
During Maintenance /DLP period
60
-
-
... More
Reports and Document Printing ( rate as per copy)
-
-
-
... More
Monthly reports
(Design and Construction) (18+60)*3
234
-
-
... More
Half yearly Reports
14
-
-
... More
Various others reports as provided in the Concession Agreement such as Completion Report
1
-
-
... More
Road Survey Equipment, Rate per Km
-
-
-
... More
Surface defects detection and roughness measurement using Network Survey Vehicle
162.35
-
-
... More
Pavement strength measurement using FWD
81.18
-
-
... More
Bridge inspection using Mobile Bridge Inspection Unit
162.35
-
-
... More
Road signs inspection using Retro Reflectometer
162.35
-
-
... More
Overhead
Total Amount of overhead charges on the remuneration as mentioned in Sr.No.1 of Appendix C-2 (Summary of Cost) w.r.t. the professional staff (Please refer Appendix-C-1 of RFP)
1
-
-
... More
Contigencies
A fixed amount of Indian Rupees ONE MILLION shall be included in the Financial Proposal. (Fixed as Rs. 10,00,000) and to be entered by bidder
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements