Jawaharlal Nehru Technological University Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Jawaharlal Nehru Technological University - JNTU Tender

Opening Date5 Oct 2021
Closing Date12 Oct 2021
Tender Amount₹ 1,36,85,747 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Third Floor;VRCC corresponding to M20 grade design mix as per IS 456 using 6mm to 20mm size graded machine crushed hard Granite/Dolamite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as centering, shuttering, usingCasurinaBallies,Bamboos,Woodenreapers,Runners,Woodposts,WallPlates,SteelCentring plates ect;machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402, 403&903) For LINTELS,Side Walls of Water Tanks,Columns The quantity of cement for M-20 grade is taken as 350kgs. For estimate purpose Design mixes with cement content less than the approved/estimated cement contents, necessary recoveries shall be effected as per the review rates published by Board of Chief Engineers. However, no extra costs shall be allowed for the cement contents more than the cement contents adopted in estimates. But Excluding seigniorage charges. Columns Third floor

30

-

333840

... More
Construction of Third Floor;VRCC corresponding to M20 grade design mix as per IS 456 using 6mm to 20mm size graded machine crushed hard Granite/Dolamite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as centering, shuttering, usingCasurinaBallies,Bamboos,Woodenreapers,Runners,Woodposts,WallPlates,SteelCentring plates ect;machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402, 403&903) For LINTELS,Side Walls of Water Tanks,Columns The quantity of cement for M-20 grade is taken as 350kgs. For estimate purpose Design mixes with cement content less than the approved/estimated cement contents, necessary recoveries shall be effected as per the review rates published by Board of Chief Engineers. However, no extra costs shall be allowed for the cement contents more than the cement contents adopted in estimates. But Excluding seigniorage charges. Columns Fourth floor

3

-

34293

... More
Construction of Third Floor;VRCC corresponding to M20 grade design mix as per IS 456 using 6mm to 20mm size graded machine crushed hard Granite/Dolamite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as centering, shuttering, usingCasurinaBallies,Bamboos,Woodenreapers,Runners,Woodposts,WallPlates,SteelCentring plates ect;machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402, 403&903) For Roof Beams, Slab The quantity of cement for M-20 grade is taken as 350kgs. For estimate purpose Design mixes with cement content less than the approved/estimated cement contents, necessary recoveries shall be effected as per the review rates published by Board of Chief Engineers. However, no extra costs shall be allowed for the cement contents more than the cement contents adopted in estimates.butExcluding seigniorage charges, Third floor Floor Beams

60

-

594480

... More
Construction of Third Floor;VRCC corresponding to M20 grade design mix as per IS 456 using 6mm to 20mm size graded machine crushed hard Granite/Dolamite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as centering, shuttering, usingCasurinaBallies,Bamboos,Woodenreapers,Runners,Woodposts,WallPlates,SteelCentring plates ect;machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402, 403&903) For Roof Beams, Slab The quantity of cement for M-20 grade is taken as 350kgs. For estimate purpose Design mixes with cement content less than the approved/estimated cement contents, necessary recoveries shall be effected as per the review rates published by Board of Chief Engineers. However, no extra costs shall be allowed for the cement contents more than the cement contents adopted in estimates.butExcluding seigniorage charges, Fourth floor Roof Beams

5

-

50850

... More
Construction of Third Floor;VRCC corresponding to M20 grade design mix as per IS 456 using 6mm to 20mm size graded machine crushed hard Granite/Dolamite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as centering, shuttering, usingCasurinaBallies,Bamboos,Woodenreapers,Runners,Woodposts,WallPlates,SteelCentring plates ect;machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402, 403&903) For Roof Beams, Slab The quantity of cement for M-20 grade is taken as 350kgs. For estimate purpose Design mixes with cement content less than the approved/estimated cement contents, necessary recoveries shall be effected as per the review rates published by Board of Chief Engineers. However, no extra costs shall be allowed for the cement contents more than the cement contents adopted in estimates.butExcluding seigniorage charges, Third floor Slab150mm thick

578

-

850238

... More
Construction of Third Floor;VRCC corresponding to M20 grade design mix as per IS 456 using 6mm to 20mm size graded machine crushed hard Granite/Dolamite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as centering, shuttering, usingCasurinaBallies,Bamboos,Woodenreapers,Runners,Woodposts,WallPlates,SteelCentring plates ect;machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402, 403&903) For Roof Beams, Slab The quantity of cement for M-20 grade is taken as 350kgs. For estimate purpose Design mixes with cement content less than the approved/estimated cement contents, necessary recoveries shall be effected as per the review rates published by Board of Chief Engineers. However, no extra costs shall be allowed for the cement contents more than the cement contents adopted in estimates.butExcluding seigniorage charges, Fourth floor Slab150mm thick

55

-

86625

... More
Construction of Third Floor;VRCC corresponding to M20 grade design mix as per IS 456 using 6mm to 20mm size graded machine crushed hard Granite/Dolamite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as centering, shuttering, usingCasurina Ballies, Bamboos, Woodenreapers, Runners, Woodposts, WallPlates, Steel Centring plates ect;machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402, 403&903) For LINTELS,Side Walls of Water Tanks,Columns The quantity of cement for M-20 grade is taken as 350kgs. For estimate purpose Design mixes with cement content less than the approved/estimated cement contents, necessary recoveries shall be effected as per the review rates published by Board of Chief Engineers. However, no extra costs shall be allowed for the cement contents more than the cement contents adopted in estimates. But Excluding seigniorage charges Third floor LINTELS

4

-

43284

... More
Construction of Third Floor;VRCC corresponding to M20 grade desigen mix per IS 456 using 6mm to 20mm size graded machine crushed hard Granite/Dolamite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as centering, shuttering, using CasurinaBallies, Bamboos, Woodenreapers, Runners, Woodposts, Wall Plates, SteelCentring plates ect; machine mixing, laying concrete, curing etc., for 7.5cm thick at fixed end and 5cm thick at free end with an average thickness of 6.25cm including plastering to all exposed faces with 12mm thick in two coats with base coat of 8mm thick in CM(1:5) and top coat of 4mm thick in CM(1:3) with dubara sponge finish including providing drip water coarse groove as directed by the Engineer-in-charge in CM (1:3) prop. including Rounding of joints of Wall & Sunshade etc., complete but excluding cost of steel and its fabrication charges for finished item of work for 60cm wide sun-shades. (APSS No. 402, 403&903) For sunshades. The quantity of cement for M-20 grade is taken as 350kgs. For estimate purpose Design mixes with cement content less than the approved/estimated cement contents, necessary recoveries shall be effected as per the review rates published by Board of Chief Engineers. However, no extra costs shall be allowed for the cement contents more than the cement contents adopted in estimates.But Excluding seigniorage charges, 3rd Floor Sunshade

100

-

145200

... More
Construction of Third Floor;Construction of masonry in CM (1:6) using Autoclave concrete bricks of size 600x200x200 mm compressive strength not less than 3N/mm2 hydraulic pressed and all other materials obtainable from approved sources to site of work construction of masonry, scaffolding, curing including all leads and lifts for water in all seasons etc. complete for finished item of work.Excluding seigniorage charges, Third Floor

240

-

2022480

... More
Construction of Third Floor;Construction of masonry in CM (1:6) using Autoclave concrete bricks of size 600x200x200 mm compressive strength not less than 3N/mm2 hydraulic pressed and all other materials obtainable from approved sources to site of work construction of masonry, scaffolding, curing including all leads and lifts for water in all seasons etc. complete for finished item of work.Excluding seigniorage charges, Fourth Floor

55

-

469040

... More
Construction of Third Floor;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site,Including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for Internal & Even faces of Brick Wall and RCC exposed faces for finished item of work. (SS 901,903 & 904) but Excluding seigniorage charges, Third Floor 20mm plastering

700

-

340900

... More
Construction of Third Floor;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site,Including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for Internal & Even faces of Brick Wall and RCC exposed faces for finished item of work. (SS 901,903 & 904) but Excluding seigniorage charges, Fourth Floor 20mm plastering

420

-

207060

... More
Construction of Third Floor;Plastering 12 mm thick in two coats with base coat of 8 mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, Including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for Internal & even Surfaces of Brick Wall for finished item of work. (SS 901,903 & 904)but Excluding seigniorage charges, Third Floor Brick work 12mm plastering

1700

-

807500

... More
Construction of Third Floor;Ornamental Ceiling plastering to ceiling 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, Including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for finished item of work. (SS 901,903 & 904) Excluding seigniorage charges, Third Floor Ornamental ceiling plastering

750

-

369750

... More
Construction of Third Floor;Ornamental Ceiling plastering to ceiling 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, Including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for finished item of work. (SS 901,903 & 904) Excluding seigniorage charges, Fourth Floor Ornamental ceiling plastering

50

-

25150

... More
Construction of Third Floor;Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. 20mm thick (average) mixed with water proofing compound, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like sand, water proofing compound, water etc., to site, including seigniorage charges, sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., complete for finished item of work. (APSS No. 901 & 903) Third Floor Impervious coat

750

-

367500

... More
Construction of Third Floor;Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. 20mm thick (average) mixed with water proofing compound, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like sand, water proofing compound, water etc., to site, including seigniorage charges, sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., complete for finished item of work. (APSS No. 901 & 903) Fourth Floor Impervious coat

50

-

24600

... More
Construction of Third Floor;Painting to with 2 coats of Emulsion paint over one base coat of cement primer of quality of approved brand and shade to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for Walls.(APSS No. 912) in All Floors External Walls

1200

-

304800

... More
Construction of Third Floor;Painting to with 2 coats of Emulsion paint over one base coat of cement primer of quality of approved brand and shade to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for Walls.(APSS No. 912) in All Floors Internal Walls

2500

-

447500

... More
Construction of Third Floor;Flooring with Double charged/multi charged stain free full body porcelain vitrified tiles with double layer pigment of Size 600 x 600 mm and thickness between 8-10 mm of thick set over a base coat of CM (1:8) prop. 12mm thick and filling the joints with epoxy emulsion grout/ synthetic / resin adhesive in width of 3-5 mm with Nylon spacers excluding cost of tiles.to match the shade of tiles over a bed of C.C. or R.C.C. slab the rate is befour laying size and shade should be got approvel from the Engineer-in-charge.The rate is including cost and conveyance of all materials like cement, sand, water, ceramic tiles, white cement etc., to site (excluding cost of C.C. bed) cost of seigniorage charges on all materials cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer-in-charge curing etc., complete for finished item of work. (APSS No.707 & 701) TF

750

-

1189500

... More
Construction of Third Floor;Dadooing to walls with Glazed Tiles of 1st quality and premium variety and colour as approved by Engineer,6 mm thick of size not less than 300 mm x400mm as per the design and pattern approved by the architect of approved colour, shade and make set over a base coat of C.M (1:5) proportion, 12mm thick and neat grey cement slurry of honey like consistency, spread at the rate of 3.3kgs per sqm and jointed with white cement or coloured cement to match the shade of the tiles, including cost and conveyance of all materials like cement, sand, water, tiles, coloured cement etc., to site, cost of seigniorage on materials and all labour charges for mixing of cement mortar, laying glazed tiles to level, curing etc., complete for finished item of work as directed by Engineer-in-charge. TF

135

-

133920

... More
Construction of Third Floor;Flooring with non-skid ceramic tiles of glazed red or white fully body ceramic wall tiles of size 300 x 450mm/320mm x 400mm and thickness 6mm and 1st quality confirming to IS 13711 IS 13712, IS 13630 (Parts 1 to 15) of any colour and finish in all shades and designs thick set over a base coat of CM (1:8) prop 12mm thick and filling the joints with white cement mixed with pigment of matching shade to match the shade of tiles over a bed of CC or RCC slab the rate is before laying size and shade should be got approved from the Engineer-in-charge. The rate is including cost and conveyance of providing and fiixng flooring with epoxy emulsion grout/synthetic/resin adhesive in width of 3-5mm with Nylon spacers excluding cost of tiles all materials like cement, sand, water, ceramic tiles, white cement etc., TF

70

-

89460

... More
Construction of Third Floor;Supplying and fixing of Mild steel hallow door frames manufactured by cold roll formed process with 1.25 mm MS grade conforming to IS 4351, 1976 suitable for single leaf or double leaves of door shutters frame of section 105 x 60 x 35 rebate including 6 Nos. of standard legs made from flat/ steel strips not less than 1.60 mm thick including base tie of section 50 mm x 25 mm (minimum) pre-fixed hinges of size 100 x 65 x 2 mm ? 3 Nos. for single shutter and 6 Nos. for double shutters with one side fixed to frame for fixing shutters, 3 Nos. rubber bottom inserts in the frame necessary arrangements for aldrop hole( 10? long 12 mm aldrop) and tower bolt welded to frame at top and bottom and fixing 50 mm long hinges to frame for wind cleat 1 No and flush door shutters of 35 mm thick solid bond wood block board type with both side commercial ply (BSC) teak wood internal lipping as per drawing including fixing of 6 Nos. MS Z hold fasts of size 300 x 40 x 5mm size including cost of Powder Coated / Chromium Plated Mild Steel fixtures of 3 Nos. butt hinges 150 x 31.75 x 3.5 mm, 2 No tower bolt of 250x12mm dia, 1 No. CP Aldrops - 300 mm long and 2 Nos. CP handles of 150 mm size & 1 No. 63 mm long door stopper including fixing the fixtures to door with required no. of screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc., complete for finished item of work as per APSS 1001 & 1002 Size(1.20X2.40)

20

-

234320

... More
Construction of Third Floor;Providing and fixing factory made uPVC white colour sliding glazed windowupto 1.50 m in height dimension comprising of uPVC multi-chamberedframe with in-built roller track and sash extruded profiles duly reinforced with 1.60 ± 0.2 mm thick galvanized mild steel section made from rollforming process of required length (shape & size according to uPVCprofile), appropriate dimension of uPVC extruded glazing beads anduPVC extruded interlocks, EPDM gasket, wool pile, zinc alloy (whitepowder coated) touch locks with hook, zinc alloy body with single nylonrollers (weight bearing capacity to be 40 kg), G.I fasteners 100 x 8 mmsize for fixing frame to finished wall and necessary stainless steel screwsetc. Profile of frame & sash shall be mitred cut and fusion welded at all corners, including drilling of holes for fixing hardware's and drainage ofwater etc. After fixing frame the gap between frame and adjacent finishedwall shall be filled with weather proof silicon sealent over backer rod ofrequired size and of approved quality, all complete as per approved drawing & direction of Engineer-in-Charge inclusive of cost of Single / double glass panes, wire mesh and silicon sealent . Note: For uPVC frame and sash extruded profiles minus 5% tolerancein dimension i.e. in depth & width of profile shall be acceptable.Variation in profile dimension in higher side shall be acceptedbut no extra payment on this account shall be made.Two track two panels sliding window made of (small series) frame 52 x 44 mm &sash 32 x 60 mm both having wall thickness of 1.9 ± 0.2 mm and single glazing bead of appropriate dimension. (Area of window upto 1.75 sqm).

115

-

788900

... More
Construction of Third Floor;Painting to wood work with 2 coats of ready mixed Synthetic enamel paint of approved brand and shade over one base coat of appropriate primer 1 coat of approved brand making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all remains including cost and conveyance of all materials to work site and all operation incidental, labour charges etc., complete for finished item of work as directed at all heights.

80

-

15200

... More
Construction of Third Floor;Providing 110 mm Dia ISI marked P.V.C.down water take pipes 2.5mm thick including cost of necessary PVC Bends, shoes, iron, clamps and all other accessories and fixing in position including cost and conveyance of all materials,sales & other taxes on materials to site, operational & incidental charges including all labour charges for fixing at site etc., complete for finished item of work. (APSS No. 1328)

200

-

89400

... More
Construction of Third Floor;Supply & fixing of European type first quality box closet integral with P or S type vitreous trap including 10 liters capacity low level PVC flusing cristern of parry ware slimlings make and colour confirming to IS 7231 with all internal fittings, CI brackets, 32mm dia CP flush pipe, 15mm dia 450mm long PVC connector, 15mm dia CP brass stop cock 300 grams all fixtures of ISI mark, cutting & making good the walls and floors wherever required including cost & conveyance of all materials to work site all labour charges for all operations for fixing etc., complete

10

-

56330

... More
Construction of Third Floor;Supply and fixing of CPVC 41.30 mm dia pipes and fitting to meet the requirement of ASTM-D 2846 and produced in CTS (copper tube size 1/2" ton 2" SDR 11 and SDR 13.5 pipes are made from identil CPVC compounds having the same physical properties for hot and cold wter IS 1577:2007) of Ashrivad/Ajay flowguard 41.30mm dia.

150

-

53550

... More
Construction of Third Floor;Supply and fixing of CPVC 28.50 mm dia pipes and fitting to meet the requirement of ASTM-D 2846 and produced in CTS (copper tube size 1/2" ton 2" SDR 11 and SDR 13.5 pipes are made from identil CPVC compounds having the same physical properties for hot and cold wter IS 1577:2007) of Ashrivad/Ajay flowguard 28.50mm dia.

150

-

24600

... More
Construction of Third Floor;Supply and fixing of 12.7mm dia Angle stop cock 400 grams I quality Indian make Seiko/Neycer or equivalent

10

-

4640

... More
Construction of Third Floor;Supply and fixing CP long body bib cock fancy type deluxe 400 grams 12.7mm dia Indian make Seiko/Senior/Nice or equivalent complete for finished item of work as per Standard specification

20

-

12420

... More
Construction of Third Floor;Supply and fixing and laying 110mm dia PVC/SWR pipe 6 kgs/m2 with accessories. Complete finished item of work

150

-

51300

... More
Construction of Third Floor;Supply & fixing of 4" (101.6mm) Nahany trap (PVC/SWR pipe fitting with SS jalli

20

-

1880

... More
Construction of Third Floor;Providing and placing on Terract (at all floor levels) polyethylene water storage tank with Double layer approved brand and manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlet and over flow pipes but without fittings & base support for tanks

16000

-

128000

... More
Construction of Third Floor;Supply and Fixing of 32mm dia 2.1mm thick surface P.V.C. pipe (ISI Mark) with all accessories fixing on chromium plated metallic base saddles including all labour charges etc., complete for run of mains Makes :Precision/Universal& Marudhar/VIP / GoldMedal / Million plast / GM / Sudhakar /Polycab/Anchor/ Polyline/ Orbit/ AKG (SD 1-3-3)

40

-

4400

... More
Construction of Third Floor;Supply and Fixing of 20mm dia 1.55mm thick P.V.C. pipe ( ISI MARK) concealed in wall with all required accessories including masonary work for light, fan and separate plug point with well seasoned wooden deep box including all labour charges etc., complete.Makes :Precision/Universal& Marudhar/VIP / GoldMedal / Million plast / GM / Sudhakar /Polycab/Anchor/ Polyline/ Orbit/ AKG (SD 1-4-1)

80

-

7200

... More
Construction of Third Floor;Supply and Fixing of 25mm dia 1.80 mm thick PVC pipe ( ISI MARK) concealed in wall with all required accessories including masonary work and all labour charges etc., complete.Makes :Precision/Universal& Marudhar/VIP / GoldMedal / Million plast / GM / Sudhakar /Polycab/Anchor/ Polyline/ Orbit/ AKG (SD 1-4-2a)

100

-

9700

... More
Construction of Third Floor;Supply and Fixing of 25mm dia 2.20mm thick PVC pipe (ISI MARK) concealed in Roof Slabs with all required accessories including masonary work and all labour charges etc., complete.Makes :Precision/Universal& Marudhar/VIP / GoldMedal / Million plast / GM / Sudhakar /Polycab/Anchor/ Polyline/ Orbit/ AKG (SD 1-4-3a)

800

-

70400

... More
Construction of Third Floor;Supply and Fixing of 20mm dia 2.10mm thick PVC pipe (ISI MARK) concealed in Roof Slabs with all required accessories including masonary work and all labour charges etc., complete. Makes :Precision/Universal& Marudhar/VIP / GoldMedal / Million plast / GM / Sudhakar /Polycab/Anchor/ Polyline/ Orbit/ AKG (SD 1.4.3.b)

100

-

7800

... More
Construction of Third Floor;Wiring with 2 runs of 14/0.3mm (1.0 Sqm) Fire Retardant (FR) PVC insulated flexible copper cable (ISI MARK) in existing pipe with 6A flush type switch Ceiling rose including all labour charges etc; complete for light. Bell, fan and exhaust fan points in Non-Residential Buildings (polycab make cable, Anchor make ceiling rose) Makes: V-Guard/Bonton /Finecab/ HPL / GM / Million / Goldmedal / Fortune Art / Sudhakar /Orbit/ Tamra/ Anchor/ Plaza / Vihan / Ollvin.

185

-

97865

... More
Construction of Third Floor;Supply and fixing of 6A 3 pin wall plug socket with 6A switch control on a common switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete.Makes: Guard/Bonton /Finecab/ HPL / GM / Million / Goldmedal /Fortune Art /Sudhakar/Orbit/ Tamra/ Anchor/Plaza/Vihan/Ollvin.

60

-

9000

... More
Construction of Third Floor;Supply and fixing of 16A 3pin / 6A 3pin plug socket with indicator lamp and 16Amps fuse unit and 16 Amps switch control (5 in one) on decolam sheet covered board including earth connection and all labour charges etc., complete on wall of makes Guard/Bonton /Finecab/ HPL / GM / Million / Goldmedal /Fortune Art /Sudhakar/Orbit/ Tamra/ Anchor/Plaza/Vihan/Ollvin.

2

-

610

... More
Construction of Third Floor;Supply and fixing of Electronic musical bell on 150 x 200 mm (6"x8") decolam block including giving connections cost of all accessories and all labour charges etc., complete..of makes GM / Million / Gold Medal / Maru / Anchor / Great white.

1

-

393

... More
Construction of Third Floor;Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FR P.V.C. insulated flexible ISI copper cable in existing pipe for earth continuity including all labour charges etc., complete.Makes: Gloster/ Polycab / Bonton / V-Guard / GM / Million /HPL / Goldmedal / Finecab /Fortune Art / Kundan cab/Sudhakar/Orbit/Standard/Tamra/Anchor

1000

-

23000

... More
Construction of Third Floor;Supply and run of 2 of 22/0.3mm (1.5 Sq.mm) F.R /FRLS PVC insulatedinsulated ISI copper cable in existing pipe for mains inlcuding all labour charges etc., complete Makes: V-Guard/Bonton /Finecab/ HPL / GM / Million / Goldmedal /Fortune Art / Sudhakar/Orbit/ Tamra/ Anchor/Plaza/Vihan/Ollvin (SD 3-1-3)

300

-

16500

... More
Construction of Third Floor;Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) F.R P.V.C. insulated flexible ISI copper cable in existing pipe for mains inlcuding all labour charges etc., completeMakes: V-Guard/Bonton /Finecab/ HPL / GM / Million / Goldmedal /Fortune Art / Sudhakar/Orbit/ Tamra/ Anchor/Plaza/Vihan/Ollvin

1000

-

73000

... More
Construction of Third Floor;Supply and run of 1 of 36/0.3mm (2.5 Sq.mm) F.R P.V.C. insulated flexible copper cable in existing pipe for earth continuity inlcuding all labour charges etc., complete Makes: V-Guard/Bonton /Finecab/ HPL / GM / Million / Goldmedal /Fortune Art / Sudhakar/Orbit/ Tamra/ Anchor/Plaza/Vihan/Ollvin SD 3-1-4a)

900

-

33300

... More
Construction of Third Floor;Supply and run of 2 of 56/0.3mm (4 Sq.mm) FR/FRLS P.V.C. insulated ISI flexible copper cable in existing pipe for mains inlcuding all labour charges etc., completeMakes: V-Guard/Bonton /Finecab/ HPL / GM / Million / Goldmedal /Fortune Art /Sudhakar/Orbit/ Tamra/ Anchor/Plaza/Vihan/Ollvin.

400

-

44800

... More
Construction of Third Floor;Supply and run of 4 of 84/0.3mm (6.0 Sq.mm) FR/FRLS insulated flexible ISI copper cable in existing pipe for mains inlcuding all labour charges etc., complete.user Makes: V-Guard/Bonton /Finecab/ HPL / GM / Million / Goldmedal /Fortune Art /Sudhakar/Orbit/ Tamra/ Anchor/Plaza/Vihan/Ollvin

80

-

24480

... More
Construction of Third Floor;Supply and run of 4 of 140/0.3mm (10Sq.mm) F.RPVC insulated flexible copper cable in edisting pipe for mains including all labour charges etc; complete Makes: V-Guard/Bonton /Finecab/ HPL / GM / Million / Goldmedal /Fortune Art /Sudhakar/Orbit/ Tamra/ Anchor/Plaza/Vihan/Ollvin

80

-

34080

... More
Construction of Third Floor;Supply and run of 4 of 126 /0.4mm (16 Sq.mm) F.R PVC insulated flexible copper cable in existing pipe for mains including all labour charges etc., complete. Makes: V-Guard/Bonton /Finecab/ HPL / GM / Million / Goldmedal /Fortune Art /Sudhakar/Orbit/ Tamra/ Anchor/Plaza/Vihan/Ollvin.

50

-

33000

... More
Construction of Third Floor;Supply and fixing TPN Distribution board with IP-43 protection (Metal Door) suitable for 3 phase ELCB / RCCB / FP Isolator as incomer and 10kA SP MCBs as outing going including internal connection and labour charges for surface / flush mounting etc., complete. Makes: ABB/Standard / Havells-euro II / HPL (Techno) /Indo Asian / C&S / L&T/GM /Gold Medal/Anchor/Salzer(63A FP Isolator / RCCB / ELCB - 1 No for incomer, 6-32A SP MCBs - 12Nos for outgoing.)

2

-

15136

... More
Construction of Third Floor;Supply and fixing TPN - Vertical type Distribution board with IP - 43 Protection (Metal Door) suitable for 3 phase ELCB / RCCB / FP Isolator as incomer and 10 kA TP / SP MCBs as outing going including internal connection and labour charges for surface / flush mounting etc., complete. Makes: ABB/Standard / Havells-euro II / HPL (Techno) /Indo Asian / C&S / L&T/GM /Gold Medal/Anchor/Salzer (Outcomer: 6-32A SP MCBS 20 Nos)

1

-

11563

... More
Construction of Third Floor;Supply and fixing Distribution board with 20A single phase plug and Socket, in sheet steel enclosure with 10/16/20A SP MCB including internal connection and labour charges for concealed etc., completeof Makes: ABB/Standard / Havells-euro II / HPL (Techno) /Indo Asian / C&S / L&T/GM /Gold Medal/Anchor/Salzer

15

-

34665

... More
Construction of Third Floor;Providing independent earthling by excavating a trench to a depth of 2.1 M in all soils, as per size specified in the Data, using 40mm dia 'B' class GI pipe of 2.5 Mtrs length with necessary accessories with hume pipe ring duly providing staggered holes including filling with equal proportion of Salt and Charcoal in layers and all labour charges etc., complete for small quarters.(SD 5-1-1)

4

-

15096

... More
Construction of Third Floor;Supply and Run of No.8 SWG G.I wire including cost of all accessories and labour charges etc., complete.

80

-

1760

... More
Construction of Third Floor;Supply and Fixing of 1 x 36/40W Patty type tube light luminaire powder coated CRCA sheet steel housing with Copper Chokeswith 40w tube and all standard accessories.Makes: Crompton / Bajaj /Halonix/ Surya / RK / Million/ Gold Medal

110

-

54010

... More
Construction of Third Floor;Supply and fixing of 48" (1200mm) Sweep 5 star rated Ceiling Fan , with double ball bearings, air delivery more than 200 cubic meter/min but without Regulator. Makes : Crompton HS Plus / Havells ES Neo/Orient Energy Star/ Halonix(Zephyr)/Polycab(Synergy Star)/GM (air wave premium)

65

-

162695

... More
Construction of Third Floor;Supply & fixing 12" (300mm) ISI, 900 RPM Heavy duty exhaust fan with metallic blades with Mark of makes complete.(user make Crompton / Almounard / Havells Turbo Force

4

-

15024

... More
Construction of Third Floor;Supply and Fixing stepped type electronic Regulator of Makes: GM G Home / Gold Medal Olive/Million Zoom/Great white Omega/Koncept/Vimal opel/Anchor

65

-

13325

... More
Construction of Third Floor;Supply and fixing and transportation of 90W LED Street light Luminaire made of pressure diecast alluminium body with powder coated, having protective toughned glass,Supply Input voltage 120 - 270 V AC, P.F > 0.90, high power LED's System efficacy >100lm/W and junction temprature < 70°C, with Ingrees protection IP65, Luminaire performance complies to IS 10322 (Part 5 / Sec-3), Driver surgeprotection 4KV, external Surge protection = 10KV with optics distribution ,THD<10% at 110 Volts AC, driver efficiency >90%, CCT: 3000K - 5700K, minimumCRI>70, etc., complete, a) LUMINAIRE Makes: Surya / Fortune Art / Syska / GM / C&S/ VIN/GoldMedal /Pharox / Cosmo / Enrich / Renesola / Stanjo / Goldwyn/ Ib LED/R LED/Orbit/ Luker/Trinicb) LED MAKE : CREE / NICHIA / OSRAM / SAMSUNG / LG.

10

-

110180



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.