Irrigation And CAD Department Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Irrigation And CAD Department Tender
Civil And Construction
Irrigation Work
Opening Date11 Nov 2024
Closing Soon25 Nov 2024
Tender Amount₹ 33,96,541
Costs
EMD
₹ 48,100Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
764183Tender No
09/2024-25, dt.01.11.2024 (1st Call)Tender Authority
Irrigation And CAD Department ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
IRR PMW 3-22:Providing homogeneous embankment using soil from approved borrow area in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out,transportation, spreading soil in layer of specified thickness, breaking clods,`sectioning,etc., complete with initial lead upto 1 km and all lifts.(For Minor Works)
3270.6
-
412651.6
IRR-PMW-3-24 (New Item 7 - 2010-11) : Providing homogeneous embankment using soil from approved borrowarea in layers of 25 to 30 cm before compaction including cost of allmaterials, machinery, labour, all operations such as compacting to density control of not less than 90 percent or as stipulated using2T roller etc., complete with initial lead upto 1 km and all lifts.
3270.6
-
30678.23
Dismantling of existing Cement concrete as per dept Soecification(Build SoR No:
4.55
-
3687.59
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N /sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for bed and side lining of canal(100 mm thick) including finishing the junction of bed and sides to required curveture, cost of all materials, machinery, labour, formwork including supports,cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete with initial lead upto 50 m and all lifts. (Cement content: 300 kg / cum for use of super plasticiser(0.4% by wt. of cement),CA : 0.80 cum, Blending Ratio of CA--65:35, FA : 0.45 cum) IRR-CAW-7-15
8.97
-
62151.96
Excavation in all kinds of soil including boulders upto 0.30 m dia. for foundations of canal cross drainage and other appurtenant structures and placing the excavated stuff neatly in specified dump area or disposing off the same as directed etc., complete with initial lead upto50 m and initial lift upto 3 m.(manual Excavation for restricted widths) IRR-CCDW-1-1
20.51
-
8770.48
Excavation for Structures- Mechanical MeansEarth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumpstechnical specification, including setting out, construction of shoring and bracing, removal of stumpsand other deleterious matter, dressing of sides and bottom and backfilling with approved material.IRR-CCDW-1-2
271.61
-
34165.82
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N /sq mm ) grade cement concrete using 40 mm down size approved, clean, aggregates for foundation filling including cost of all materials, machinery, labour, formwork,hard, graded cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete with initial lead upto 50 m and all lifts. (Cement content: 260 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)IRR-CCDW-2-3
40.79
-
250482
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials,machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position,levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)IRR-CCDW-2-9
17.89
-
127389.32
Manufacture, Supply and delivery of RCC sokets and spigot pipes confirming to BIS 458/2003 Ex-factory (Rate per Meter of effective length) excluding transportation taxes and duties 600mm dia NP3 pipe (Page 30 of SoR)
30
-
111226.2
Laying and jointing 600 mm dia. NP- 3 class or IRC standard hume pipes in CM 1 : 2proportion by volume including cost of all materials ( excluding pipes and collars ), machinery,labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto50 m and all lifts.(Cement content: 24.8 kg / joint, FA : 0.025cum/joint, Hemp Yarn : 0.22kg/joint) IRR-CCDW-6-3
30
-
23360.7
Drilling holes in hard granite or sheet rock 25mmDia (MAT - 00509)
31.5
-
5153.71
Grouting the holes with neat cement slurry excluding cost of steel (MAT - 00515)
31.5
-
4366.21
Providing, fabricating and placing in position reinforcement steel bars for RCC works including cleaning, straightening, cutting, bending, hooking, lapping, welding wherever required,tying with 1.25 mm dia soft annealed steel wire, including cost of all materials, machinery, labour etc.,complete with initial lead upto 50 and all lifts.IRR-CCDW-2-1
132.58
-
11298.46
Providing 20 mm thick plastering in cement mortar 1:3 proportion by volume including costof all materials, machinery, labour, scaffolding, cleaning joints, smooth finishing, curing etc.,complete with initial lead upto 50 m and all lifts.IRR-CCDW-4-9
84.12
-
31791.47
Therlam
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%